Residential

OverviewRooftop PV at volumeRoof & dronePlanes measured on the roofAttic & structureRafters recordedElectricalPanel and interconnectionDesign & engineeringModel to stamped set

Commercial & Industrial

OverviewBig roofs, real structureOn-site surveyRoof, structure, switchgearDesign & engineeringPE stampedVisual inspectionModule resolutionThermal inspectionFaults as heatElectroluminescenceCell-level cracks

Utility-Scale

OverviewThousands of acresLiDAR topographyTerrain before earthworkLand surveyingBoundary and topographicConstruction monitoringProgress, measuredThermal & ELEvery string

Across every scale

Site surveysRoof and electrical, one visitPermitting & engineeringStamped plan setsInspectionAerial thermal and ELShading analysisSA, TOF and TSRFSurvey locationsState and metro guides

The platform

Platform overviewPortal, 3D models, live dataFeature guidesWho it serves and how it worksShading analysisMove the sun yourselfCost calculatorWhat bad field data costs you

Sign in

Vanguard AccessInvite only · survey data portalScheduling & DispatchCrewLink · all verticals

Solar reference

Solar questions answeredResidential, commercial and utility-scaleSurvey methodologySources, measurements and limitsCompany factsOfficial services and capabilities

Field Notes · build vs. buy

What a survey really costsPart 01 · the full modelUtilization is the whole gamePart 02 · a real TuesdayThe break-even headcountWhen hiring pays offTwo technicians, two roofsVariance, measuredThe hybrid crewIn-house plus outsourced

Field Notes · reference

Site survey checklistBuilt backwards from reworkHow long a survey takesHour by hourDo panels need a permit?What goes in the packageStorage site surveysThe capture listCompare survey vendorsQuestions to ask any vendor

Company

All servicesAll Field NotesAboutBook a 15-min call

Home / Homeowners

Homeowner education · reviewed 2026-10-07

SMA Solar Data: Migration and Handover Checks

Review SMA Sunny Portal migration and export records. Match the system, data period and user role before comparing solar history or handing records to a buyer.

Make the decision with evidence
  1. 01Ask the right questions
  2. 02Verify the assumptions
  3. 03Keep the records

Education, not a savings or approval guarantee.

Use this guide

Choose the questions relevant to your situation. Expand each answer, save the checklist and request written clarification where evidence is missing.

Questions homeowners ask

Does every older SMA monitoring system follow the same migration path?

No. SMA lists Sunny WebBox, Cluster Controller, Inverter Manager and Sunny Home Manager 1.0 systems as excluded. Match the actual communication device and system notice rather than assuming every older installation migrates.

Source: SMA: Sunny Portal migration FAQ. Reviewed 2026-10-07.

Does transferred lifetime energy mean all old performance curves transfer?

No. SMA distinguishes lifetime energy history from performance curves: only the last 60 days of curves transfer at migration. It describes older Classic data as available briefly, without a fixed duration in that explanation.

Source: SMA: Sunny Portal migration FAQ. Reviewed 2026-10-07.

What does SMA say about existing settings and users?

Its migration FAQ says settings, additional users, reports and Smart Connected settings transfer. Keep the notice and verify the actual account view; this description does not establish a home buyer’s contractual rights.

Source: SMA: Sunny Portal migration FAQ. Reviewed 2026-10-07.

What period does the September 2026 export note describe?

SMA America describes Energy Balance export for up to one year, with aggregated energy and intraday power in separate CSV files. Current-year data runs through the previous month. Check the file’s actual coverage before treating it as complete.

Source: SMA America: Sunny Portal release notes. Reviewed 2026-10-07.

Does a Guest role provide the same access as an owner expects?

SMA’s November 2024 release note describes Guest access as read-only and says that role cannot use the SMA Energy App for the system. Ask the authorized administrator to clarify the intended role; do not share passwords or expand permissions casually.

Source: SMA America: Sunny Portal release notes. Reviewed 2026-10-07.

Are monitoring registration and warranty records one process?

SMA’s homeowner support page separates Sunny Portal system registration from product registration in its Online Service Center. It says installer-started warranty registration needs homeowner email confirmation. Retain the relevant acknowledgment and ask about the actual product terms.

Source: SMA America: homeowner support. Reviewed 2026-10-07.

Your decision checklist

  • Identify the inverter and communication device from existing handover records.
  • Keep the system’s actual migration notice and portal name.
  • Distinguish lifetime energy, interval power and unavailable history.
  • Record export date, first and last timestamps, units and missing periods.
  • Confirm your own account can see the intended system with the authorized role.
  • Keep service and warranty acknowledgments outside the monitoring-data file.
  • Pass only relevant records through a private approved handover channel.

Save or print this guide from your browser. Keep completed records privately.

Keep data coverage and access evidence together

Original private data-handover worksheet; not a configuration instruction, warranty finding or ownership transfer.
RecordWhat to establish
System identityActual inverter, communication device and correct system record
Migration evidenceNotice, portal name and confirmed transition status
Data typeEnergy total, interval power, report or unavailable field
Time coverageFile creation date, start, end, time zone and gaps
Account roleAuthorized user, intended view and unresolved access question
Separate obligationsWarranty acknowledgment, service case and transaction documents
Handover resultRecipient, safely shared records, remaining gaps and next contact

Begin with a question the records can answer: a buyer needs the available system history, a homeowner wants to compare a bill period, or a service provider needs a dated observation. Name that question before collecting files. The worksheet makes missing records visible without turning them into evidence of zero generation, a defect or a completed transfer.

Reviewed October 7, 2026 against the manufacturer’s migration FAQ and SMA America’s dated release notes. Preserve the distinction between retained energy history and limited curve history, and between an export’s advertised range and the actual downloaded period. These statements are provider-specific; ask SMA about the current route for the installed system.

Fictional history example: a homeowner sees an annual total but cannot find older fine-grained curves. The record inventory keeps the total, marks the curves unavailable and asks support whether an existing saved file can fill the gap. The homeowner does not manufacture a daily profile by dividing the annual number evenly, and does not infer failed equipment from an absent graph.

Fictional bill example: a comparison prepared in October uses an export ending September 30, while the utility bill extends into October. The homeowner marks the periods as different and waits for matching coverage or asks the provider about other available records. October values are not entered as zero. This is an illustration of checking dates, not a guarantee about an individual account or its export.

When a file is available to your authorized account, keep an unchanged original and record its creation date, units, time zone and visible gaps. Work from a separate copy for notes. A monthly energy sum and a power reading at a particular time answer different questions. Compare like periods and quantities; an energy file alone cannot establish export compensation, utility charges or ownership of renewable-energy claims.

For a home sale, identify who must supply the records, what has actually arrived and which access questions remain open. Record a request, an invitation and verified access as separate stages. A seller’s visible dashboard is not evidence that a buyer has their own authorized access. Ask the current administrator or provider to explain the supported handover process; this guide does not direct anyone to change roles, delete a system or add users.

Keep monitoring records separate from SMA’s product-registration and support route. A portal view does not decide a claim or replace a contract. Retain the applicable warranty document, registration acknowledgment, service case reference and written decision separately. No warranty duration, transfer approval, repair price or support turnaround is promised here.

Use the energy-flow and bill worksheet, solar-home transaction checks, handover records, warranty and service responsibilities and safe system-problem steps for the next question. A useful handover names the records delivered and the limitations still unresolved.

Our worksheet and fictional examples are editorial planning aids. Solar Survey AI’s evidence methodology explains observation limits. Confirm available inspection or site-survey scope, qualifications, fees, conflicts and availability. Third-party does not automatically mean independent. We do not administer SMA accounts or guarantee savings, warranty approval or access recovery. Homeowner monitoring connections and planned remote diagnosis remain coming soon.

Keep product identifiers, account names, home addresses, transaction documents and exports private. Share only necessary records with the intended recipient through an approved channel. Do not share passwords or registration keys, open enclosures, climb, update firmware, reset equipment or change electrical settings for this worksheet. Technical work belongs with an appropriately qualified provider.

Continue your research

Next: Why Get an Independent Solar Assessment?Next: Going Solar: A Homeowner’s Step-by-Step GuideNext: Compare Solar Quotes, Loans, Leases and PPAsNext: Roof, Shade and Battery: Homeowner Planning GuideNext: Solar Permits, Inspections and Utility ApprovalNext: Solar Not Working? A Homeowner’s Next-Step GuideNext: Buying or Selling a Home With Solar PanelsNext: Solar Bills and Export Credits ExplainedNext: How to Choose a Solar InstallerNext: Solar Warranties and Service Disputes: What to KeepNext: Home Solar Maintenance: A Safe Planning GuideNext: Solar Panels and Home Insurance: Questions to AskNext: San Diego Solar Permits and Permission to OperateNext: San Diego Solar Incentives: Verify Your EligibilityNext: Austin Energy Solar Rebate: A Homeowner GuideNext: Phoenix Solar Permits: A Homeowner Approval GuideNext: Community Solar: Check the Subscription Before SigningNext: Home Energy Assessment Before Solar: What to AskNext: Los Angeles Solar Permits and LADWP ApprovalNext: Solar Panel Recycling: Plan for RetirementNext: Solar After a Storm: Safety and Recovery RecordsNext: ComEd Solar Approval and Net Metering: Homeowner GuideNext: Tucson Solar Permits and TEP Approval: Homeowner GuideNext: Denver Solar Permits: A Homeowner Planning GuideNext: Solar Sales Claims: Verify Before You SignNext: Solar System Handover: Records to KeepNext: Sacramento Solar Permits and SMUD: Homeowner GuideNext: OUC Home Solar Approval and Export CreditsNext: Fairfax County Solar Permits and Utility ApprovalNext: Portland Solar Permits and PGE: Homeowner GuideNext: Seattle Solar Approval: City Light Homeowner GuideNext: Las Vegas Solar Permits and NV Energy: Homeowner GuideNext: FPL Solar Approval and Net Metering: Homeowner GuideNext: APS Solar Bills and Export Credits: Homeowner GuideNext: North Carolina Solar Bills: Duke Rider QuestionsNext: PSE&G Solar Approval and Bills: Homeowner GuideNext: Minnesota Solar Approval and Credits: Homeowner GuideNext: Maryland Solar Credits: Banking and Bill ChecklistNext: New York Rooftop Solar: Provider and Contract ChecksNext: Boston Solar Permits: Homeowner Document ChecklistNext: Connecticut Solar Tariffs: RRES Homeowner ChecklistNext: Ameren Missouri Solar: Bills and Approval RecordsNext: Pennsylvania Solar Bills: Supplier and Credit ChecksNext: PNM Solar Bills: Energy Banks and Agreement ChecksNext: Maine Solar Credits: Expiration and Bill ChecklistNext: Georgia Power Solar: Bills and Approval ChecksNext: DTE Solar Bills: Outflow and Credit Bank ChecksNext: PSE Solar: Net Metering and Program Record ChecksNext: Dominion SC Solar Choice: Bill and Meter RecordsNext: National Grid MA Solar: Credit and Transfer RecordsNext: SDG&E Solar Bills: Export Pricing Record ChecksNext: CPS Energy Solar: Meter and Commissioning RecordsNext: SRP Solar Plans: Demand and Export Record ChecksNext: Xcel Colorado Solar: Bank Election and Bill RecordsNext: Evergy Home Solar: Territory and Meter Record ChecksNext: We Energies Solar: Meter Configuration and Bill ChecksNext: Utah Solar: Rocky Mountain Power Net Billing RecordsNext: AEP Ohio Solar: Supplier and Credit RecordsNext: Entergy Louisiana Solar: Rider and Meter RecordsNext: Indiana Solar: Tariff and Complaint RecordsNext: Oncor Solar: REP and Meter RecordsNext: Entergy Arkansas Solar Credit RecordsNext: OG&E Oklahoma Solar: Meter and Bill RecordsNext: OPPD Solar Bills: Net Meter and Approval RecordsNext: Hawaiian Electric Solar: Program and Credit RecordsNext: NV Energy North Solar: Interval and Approval RecordsNext: SMUD Battery Program: Consent and Enrollment RecordsNext: PG&E Solar Bills: Plan and True-Up Record ChecksNext: SCE Solar Credits: Settlement and Bill RecordsNext: LADWP Solar Credits: Meter and Account RecordsNext: Nashville NES Solar: Program and Approval RecordsNext: PSO Oklahoma Solar: Plans and Approval RecordsNext: Ameren Illinois Solar Credits: Keep the Election RecordNext: Dallas Solar Permits: Review Pathways and RecordsNext: DC Solar SRECs: Certification and Ownership RecordsNext: Florida Solar Contractors: License and Business ChecksNext: Texas Solar Contracts: Registration and Cancellation ChecksNext: California Solar: Consumer Documents Before SigningNext: Illinois Shines: Records for a Solar Home TransferNext: Enphase Solar: Maintainer and Data Access ChecksNext: Philadelphia Solar Permits: EZ Route and Project RecordsNext: Montgomery County MD Solar: eSolar Permit ChecklistNext: SolarEdge Monitoring: Transfer and Access RecordsNext: Tesla Solar Home Sales: Contract and Access RecordsNext: New York City Solar: Permit Team and Inspection RecordsNext: JEA Solar Home Move-In: Credit and Handover RecordsNext: Austin Solar Home Sale: ECAD Audit and Disclosure RecordsNext: Georgia Solar Contracts: Payment and Transfer ChecksNext: LG Home Battery Recalls: Identity and Remedy RecordsNext: Virginia Solar HOA Documents: Before You SignNext: Sunrun Solar Home Sales: Service Transfer ChecklistNext: New Jersey Solar Home Sales: Certificate RecordsNext: Massachusetts Solar Home Sales: Incentive RecordsNext: Oregon Solar Contractors: License and Complaint RecordsNext: California Solar Payments: Notices and Lien RecordsNext: Oregon Solar Sales: Disclosure and Contract RecordsNext: Oregon Solar Incentives: Reservation and Status RecordsNext: Wisconsin Solar Proposals: Contract and Complaint RecordsNext: Michigan Solar Contracts: Cancellation Review RecordsNext: SolarEdge Cellular Data: Plan and Warranty ChecksNext: Pennsylvania Solar Contractors: Registration RecordsNext: Virginia Solar Contracts: Prepare for 2027 DisclosuresNext: Virginia Shared Solar: Subscription and Bill RecordsNext: Minnesota Solar Gardens: LMI Program Record ChecksNext: Illinois Community Solar: Moving and Transfer RecordsNext: New York Community Solar: Compare Plan RecordsNext: Nevada Solar Contractors: License and Contract RecordsNext: Utah Solar Retailers: Registration Record ChecksNext: Rhode Island Solar: Retailer and Disclosure RecordsNext: Connecticut Solar Sales: People and Credential RecordsNext: New Mexico Solar Tax Credit: Certification RecordsNext: Maryland Solar Access: Reservation and Payment RecordsNext: Delaware Solar Rebates: Application and Payment RecordsNext: Washington Solar: Contractor and Electrical RecordsNext: LES Community Solar: Compare Credits and ContributionsNext: Idaho Solar: Contractor and Electrical Permit RecordsNext: Oklahoma Solar: Active Contractor and Approval RecordsNext: Tennessee Solar: Contractor Records Before BiddingNext: New Hampshire Solar: Verify Incentives Before SigningNext: Alabama Solar: Contractor Scope and License RecordsNext: LG&E and KU Solar: Service Dates and Credit RecordsNext: Duke Florida Solar: Compare Subscription RecordsNext: Maine Solar Contracts: Review Before SigningNext: Vermont Solar: Registration and Contract Record ChecksNext: Massachusetts Solar: Contract and Payment Record ChecksNext: Maryland Solar: Wildlife Barrier and Waiver RecordsNext: South Carolina Solar: Trade Authority Record ChecksNext: North Carolina Solar: License Identity Record ChecksNext: Minnesota Solar: Contracting and Installer Role RecordsNext: Arizona Solar Disputes: Recovery and Complaint RecordsNext: California Solar: Complaint and Restitution RecordsNext: Nevada Solar: Recovery Claim RecordsNext: Florida Solar: Recovery Route RecordsNext: Powerwall 2 Recall: Replacement Record ChecklistNext: Sunnova to SunStrong: Service Transition RecordsNext: Legacy SunPower: Support Route and Warranty RecordsNext: Solar Production Estimates: Keep the Input RecordsNext: California SGIP: Solar and Storage Application RecordsNext: Solar and EV Charging: Plan Home Energy and BackupNext: Solar RECs: Ownership and Renewable Energy ClaimsNext: Solar Battery VPPs: Participation and Payment RecordsNext: Enphase Sunlight Backup: Scope and Load RecordsNext: Massachusetts SMART 3.0: Application and Payment RecordsNext: New York NY-Sun: Incentive and Contract ChecksNext: Con Edison Solar: Credit Vintage and Rate Plan ChecksNext: Connecticut Batteries: ESS Enrollment and Payment RecordsNext: Panasonic EVERVOLT: Monitoring and Warranty Records

About these guides

Published by Solar Survey AI, a commercial survey-services company. Our original decision checklists are recommendations; linked authorities support the referenced facts. We may benefit if you purchase our services. This is not independent certification of our company, a project-specific engineering decision or personal tax/legal advice. Local rules, contracts and site evidence control individual decisions. Reviewed 2026-10-07.

For available survey or inspection services, confirm your project scope and availability with our team. Our planned free homeowner remote diagnosis remains coming soon.

Survey services · Inspection services · Monitoring early access
Book a 15-min call