Residential

OverviewRooftop PV at volumeRoof & dronePlanes measured on the roofAttic & structureRafters recordedElectricalPanel and interconnectionDesign & engineeringModel to stamped set

Commercial & Industrial

OverviewBig roofs, real structureOn-site surveyRoof, structure, switchgearDesign & engineeringPE stampedVisual inspectionModule resolutionThermal inspectionFaults as heatElectroluminescenceCell-level cracks

Utility-Scale

OverviewThousands of acresLiDAR topographyTerrain before earthworkLand surveyingBoundary and topographicConstruction monitoringProgress, measuredThermal & ELEvery string

Across every scale

Site surveysRoof and electrical, one visitPermitting & engineeringStamped plan setsInspectionAerial thermal and ELShading analysisSA, TOF and TSRFSurvey locationsState and metro guides

The platform

Platform overviewPortal, 3D models, live dataFeature guidesWho it serves and how it worksShading analysisMove the sun yourselfCost calculatorWhat bad field data costs you

Sign in

Vanguard AccessInvite only · survey data portalScheduling & DispatchCrewLink · all verticals

Solar reference

Solar questions answeredResidential, commercial and utility-scaleSurvey methodologySources, measurements and limitsCompany factsOfficial services and capabilities

Field Notes · build vs. buy

What a survey really costsPart 01 · the full modelUtilization is the whole gamePart 02 · a real TuesdayThe break-even headcountWhen hiring pays offTwo technicians, two roofsVariance, measuredThe hybrid crewIn-house plus outsourced

Field Notes · reference

Site survey checklistBuilt backwards from reworkHow long a survey takesHour by hourDo panels need a permit?What goes in the packageStorage site surveysThe capture listCompare survey vendorsQuestions to ask any vendor

Company

All servicesAll Field NotesAboutBook a 15-min call

Home / Homeowners

Homeowner education · reviewed 2026-10-06

Maine Solar Contracts: Review Before Signing

Review Maine solar contract records: written agreements, payments, work dates, change orders, warranties and practical questions before signing or starting.

Make the decision with evidence
  1. 01Ask the right questions
  2. 02Verify the assumptions
  3. 03Keep the records

Education, not a savings or approval guarantee.

Use this guide

Choose the questions relevant to your situation. Expand each answer, save the checklist and request written clarification where evidence is missing.

Questions homeowners ask

When does the home-construction written-contract rule apply?

Section 1487 covers home construction contracts exceeding $3,000 in materials or labor. It requires both parties’ signatures and copies before work. Confirm how the rule applies to your proposed scope.

Source: Maine Legislature: Title 10 section 1487 home construction contracts. Reviewed 2026-10-06.

Which dates belong in the covered contract?

The statute calls for estimated start and substantial-completion dates. It allows changes for circumstances beyond the contractor’s control; preserve the reason and revised schedule.

Source: Maine Legislature: Title 10 section 1487 home construction contracts. Reviewed 2026-10-06.

What initial payment limit does the statute describe?

Section 1487 limits the initial down payment to one-third of the total contract price. Review the payment schedule and any proposed waiver with a qualified adviser.

Source: Maine Legislature: Title 10 section 1487 home construction contracts. Reviewed 2026-10-06.

How should a price-changing alteration be documented?

The statute requires a change-order statement calling for a written change order when altered specifications revise the price. Keep the agreed scope and signed revision together.

Source: Maine Legislature: Title 10 section 1487 home construction contracts. Reviewed 2026-10-06.

Does a manufacturer warranty replace every contract provision?

Section 1487 includes a contractor warranty statement and dispute-resolution provisions. Read the actual statutory wording and contract; equipment coverage alone does not answer every workmanship question.

Source: Maine Legislature: Title 10 section 1487 home construction contracts. Reviewed 2026-10-06.

Must I waive my rights to obtain a contract?

The Attorney General says you are not required to waive statutory rights to contract with a contractor. A permitted waiver requires specific information about rights and written agreement.

Source: Maine Attorney General: home construction contracts. Reviewed 2026-10-06.

What solar costs should I ask the preparer to explain?

The Attorney General’s solar guide recommends lifetime pricing including interest and fees, plus metering, inverter replacement, roof-related removal and other costs. Ask which are included or excluded.

Source: Maine Attorney General: solar power systems. Reviewed 2026-10-06.

Which responsibilities need their own written answer?

The solar guide recommends clarifying maintenance, warranties, roof work, home transfer, permits and end-of-contract removal. Identify the responsible party rather than relying on a general promise.

Source: Maine Attorney General: solar power systems. Reviewed 2026-10-06.

Your decision checklist

  • Identify the seller, installer and actual scope.
  • Check whether the home-construction rules apply.
  • Keep the executed contract before work begins.
  • Reconcile price, payment schedule and estimated dates.
  • Read the actual warranty and dispute language.
  • Retain signed change orders and consumer information.
  • Resolve any proposed waiver before signing.
  • Confirm trade authority, local permits and utility steps separately.

Save or print this guide from your browser. Keep completed records privately.

Before signing: resolve the contract records

Original private contract-review organizer; not a contract template.
RecordWhat to retain
Parties and scopeSeller, installer, property and described equipment/work
Price and timingTotal price, payments, estimated dates and exclusions
ChangesWritten scope revision, price effect and signatures
ResponsibilitiesWorkmanship, equipment, roof work, transfer and permits
Rights and termsStatutory wording, consumer addendum, dispute terms and any waiver

Example: the salesperson promises that roof-related work is included, while the proposed agreement lists it as an exclusion. Keep both statements and request a corrected scope before deciding. Do not treat a verbal estimate as an executed agreement or assume the disagreement has been resolved.

Example: the design changes after an onsite assessment and the price rises. Keep the original description, the proposed revision and its price effect together. Ask the contractor to provide the applicable written change order and explain the new schedule before authorizing the changed work.

Pros: a complete written packet makes competing offers and later changes easier to compare. Cons: collecting paperwork takes time, and documents still require review for exclusions, inconsistent promises and the parties’ actual ability to perform. A signature, registration or warranty is not a guarantee of workmanship or financial recovery. These are editorial tradeoffs, not predictions about a contractor.

Reviewed October 6, 2026 against the official sources cited with each answer. The questions summarize selected provisions; they do not reproduce all mandatory language, decide whether your transaction is covered or evaluate enforceability. Read the complete statute and seek qualified advice for scope, waiver or dispute questions. This organizer is not legal advice or an approved Maine contract form. Do not use it to waive rights or operate equipment.

Before selling or installing in a Maine market, have the responsible professional review the actual agreement, required consumer information, sales channel, payment terms and change-order process for the proposed scope. Keep electrical trade authority, local permitting, utility approval and business obligations as separate checks. General home-contractor guidance does not establish permission to perform electrical work. This page addresses contract preparation and homeowner review, not every requirement for entering the market.

Continue with quote and financing comparisons, installer selection and Maine credit and subscription records. Solar Survey AI’s evidence methodology and an agreed survey scope can support documented site inputs; confirm availability, qualifications and conflicts. A site assessment does not draft a legal contract, decide a dispute or guarantee approval. Homeowner monitoring connections and planned remote diagnosis remain coming soon.

Continue your research

Next: Why Get an Independent Solar Assessment?Next: Going Solar: A Homeowner’s Step-by-Step GuideNext: Compare Solar Quotes, Loans, Leases and PPAsNext: Roof, Shade and Battery: Homeowner Planning GuideNext: Solar Permits, Inspections and Utility ApprovalNext: Solar Not Working? A Homeowner’s Next-Step GuideNext: Buying or Selling a Home With Solar PanelsNext: Solar Bills and Export Credits ExplainedNext: How to Choose a Solar InstallerNext: Solar Warranties and Service Disputes: What to KeepNext: Home Solar Maintenance: A Safe Planning GuideNext: Solar Panels and Home Insurance: Questions to AskNext: San Diego Solar Permits and Permission to OperateNext: San Diego Solar Incentives: Verify Your EligibilityNext: Austin Energy Solar Rebate: A Homeowner GuideNext: Phoenix Solar Permits: A Homeowner Approval GuideNext: Community Solar: Check the Subscription Before SigningNext: Home Energy Assessment Before Solar: What to AskNext: Los Angeles Solar Permits and LADWP ApprovalNext: Solar Panel Recycling: Plan for RetirementNext: Solar After a Storm: Safety and Recovery RecordsNext: ComEd Solar Approval and Net Metering: Homeowner GuideNext: Tucson Solar Permits and TEP Approval: Homeowner GuideNext: Denver Solar Permits: A Homeowner Planning GuideNext: Solar Sales Claims: Verify Before You SignNext: Solar System Handover: Records to KeepNext: Sacramento Solar Permits and SMUD: Homeowner GuideNext: OUC Home Solar Approval and Export CreditsNext: Fairfax County Solar Permits and Utility ApprovalNext: Portland Solar Permits and PGE: Homeowner GuideNext: Seattle Solar Approval: City Light Homeowner GuideNext: Las Vegas Solar Permits and NV Energy: Homeowner GuideNext: FPL Solar Approval and Net Metering: Homeowner GuideNext: APS Solar Bills and Export Credits: Homeowner GuideNext: North Carolina Solar Bills: Duke Rider QuestionsNext: PSE&G Solar Approval and Bills: Homeowner GuideNext: Minnesota Solar Approval and Credits: Homeowner GuideNext: Maryland Solar Credits: Banking and Bill ChecklistNext: New York Rooftop Solar: Provider and Contract ChecksNext: Boston Solar Permits: Homeowner Document ChecklistNext: Connecticut Solar Tariffs: RRES Homeowner ChecklistNext: Ameren Missouri Solar: Bills and Approval RecordsNext: Pennsylvania Solar Bills: Supplier and Credit ChecksNext: PNM Solar Bills: Energy Banks and Agreement ChecksNext: Maine Solar Credits: Expiration and Bill ChecklistNext: Georgia Power Solar: Bills and Approval ChecksNext: DTE Solar Bills: Outflow and Credit Bank ChecksNext: PSE Solar: Net Metering and Program Record ChecksNext: Dominion SC Solar Choice: Bill and Meter RecordsNext: National Grid MA Solar: Credit and Transfer RecordsNext: SDG&E Solar Bills: Export Pricing Record ChecksNext: CPS Energy Solar: Meter and Commissioning RecordsNext: SRP Solar Plans: Demand and Export Record ChecksNext: Xcel Colorado Solar: Bank Election and Bill RecordsNext: Evergy Home Solar: Territory and Meter Record ChecksNext: We Energies Solar: Meter Configuration and Bill ChecksNext: Utah Solar: Rocky Mountain Power Net Billing RecordsNext: AEP Ohio Solar: Supplier and Credit RecordsNext: Entergy Louisiana Solar: Rider and Meter RecordsNext: Indiana Solar: Tariff and Complaint RecordsNext: Oncor Solar: REP and Meter RecordsNext: Entergy Arkansas Solar Credit RecordsNext: OG&E Oklahoma Solar: Meter and Bill RecordsNext: OPPD Solar Bills: Net Meter and Approval RecordsNext: Hawaiian Electric Solar: Program and Credit RecordsNext: NV Energy North Solar: Interval and Approval RecordsNext: SMUD Battery Program: Consent and Enrollment RecordsNext: PG&E Solar Bills: Plan and True-Up Record ChecksNext: SCE Solar Credits: Settlement and Bill RecordsNext: LADWP Solar Credits: Meter and Account RecordsNext: Nashville NES Solar: Program and Approval RecordsNext: PSO Oklahoma Solar: Plans and Approval RecordsNext: Ameren Illinois Solar Credits: Keep the Election RecordNext: Dallas Solar Permits: Review Pathways and RecordsNext: DC Solar SRECs: Certification and Ownership RecordsNext: Florida Solar Contractors: License and Business ChecksNext: Texas Solar Contracts: Registration and Cancellation ChecksNext: California Solar: Consumer Documents Before SigningNext: Illinois Shines: Records for a Solar Home TransferNext: Enphase Solar: Maintainer and Data Access ChecksNext: Philadelphia Solar Permits: EZ Route and Project RecordsNext: Montgomery County MD Solar: eSolar Permit ChecklistNext: SolarEdge Monitoring: Transfer and Access RecordsNext: Tesla Solar Home Sales: Contract and Access RecordsNext: New York City Solar: Permit Team and Inspection RecordsNext: JEA Solar Home Move-In: Credit and Handover RecordsNext: Austin Solar Home Sale: ECAD Audit and Disclosure RecordsNext: Georgia Solar Contracts: Payment and Transfer ChecksNext: LG Home Battery Recalls: Identity and Remedy RecordsNext: Virginia Solar HOA Documents: Before You SignNext: Sunrun Solar Home Sales: Service Transfer ChecklistNext: New Jersey Solar Home Sales: Certificate RecordsNext: Massachusetts Solar Home Sales: Incentive RecordsNext: Oregon Solar Contractors: License and Complaint RecordsNext: California Solar Payments: Notices and Lien RecordsNext: Oregon Solar Sales: Disclosure and Contract RecordsNext: Oregon Solar Incentives: Reservation and Status RecordsNext: Wisconsin Solar Proposals: Contract and Complaint RecordsNext: Michigan Solar Contracts: Cancellation Review RecordsNext: SolarEdge Cellular Data: Plan and Warranty ChecksNext: Pennsylvania Solar Contractors: Registration RecordsNext: Virginia Solar Contracts: Prepare for 2027 DisclosuresNext: Virginia Shared Solar: Subscription and Bill RecordsNext: Minnesota Solar Gardens: LMI Program Record ChecksNext: Illinois Community Solar: Moving and Transfer RecordsNext: New York Community Solar: Compare Plan RecordsNext: Nevada Solar Contractors: License and Contract RecordsNext: Utah Solar Retailers: Registration Record ChecksNext: Rhode Island Solar: Retailer and Disclosure RecordsNext: Connecticut Solar Sales: People and Credential RecordsNext: New Mexico Solar Tax Credit: Certification RecordsNext: Maryland Solar Access: Reservation and Payment RecordsNext: Delaware Solar Rebates: Application and Payment RecordsNext: Washington Solar: Contractor and Electrical RecordsNext: LES Community Solar: Compare Credits and ContributionsNext: Idaho Solar: Contractor and Electrical Permit RecordsNext: Oklahoma Solar: Active Contractor and Approval RecordsNext: Tennessee Solar: Contractor Records Before BiddingNext: New Hampshire Solar: Verify Incentives Before SigningNext: Alabama Solar: Contractor Scope and License RecordsNext: LG&E and KU Solar: Service Dates and Credit RecordsNext: Duke Florida Solar: Compare Subscription Records

About these guides

Published by Solar Survey AI, a commercial survey-services company. Our original decision checklists are recommendations; linked authorities support the referenced facts. We may benefit if you purchase our services. This is not independent certification of our company, a project-specific engineering decision or personal tax/legal advice. Local rules, contracts and site evidence control individual decisions. Reviewed 2026-10-06.

For available survey or inspection services, confirm your project scope and availability with our team. Our planned free homeowner remote diagnosis remains coming soon.

Survey services · Inspection services · Monitoring early access
Book a 15-min call