Across every scale

Site surveysRoof and electrical, one visitPermitting & engineeringStamped plan setsInspectionAerial thermal and ELShading analysisSA, TOF and TSRFSurvey locationsState and metro guides

The platform

Platform overviewPortal, 3D models, live dataFeature guidesWho it serves and how it worksShading analysisMove the sun yourselfCost calculatorWhat bad field data costs you

Sign in

Vanguard AccessInvite only · survey data portalScheduling & DispatchCrewLink · all verticals

Solar reference

Solar questions answeredResidential, commercial and utility-scaleSurvey methodologySources, measurements and limitsCompany factsOfficial services and capabilities

Field Notes · build vs. buy

What a survey really costsPart 01 · the full modelUtilization is the whole gamePart 02 · a real TuesdayThe break-even headcountWhen hiring pays offTwo technicians, two roofsVariance, measuredThe hybrid crewIn-house plus outsourced

Field Notes · reference

Site survey checklistBuilt backwards from reworkHow long a survey takesHour by hourDo panels need a permit?What goes in the packageStorage site surveysThe capture listCompare survey vendorsQuestions to ask any vendor

Company

All servicesAll Field NotesAboutBook a 15-min call

Home / Homeowners

Homeowner education · reviewed 2026-10-06

Fairfax County Solar Permits and Utility Approval

Plan Fairfax County home solar permits and Dominion Energy approval with official sources, project-scope questions and a practical homeowner record checklist.

Make the decision with evidence
  1. 01Ask the right questions
  2. 02Verify the assumptions
  3. 03Keep the records

Education, not a savings or approval guarantee.

Use this guide

Choose the questions relevant to your situation. Expand each answer, save the checklist and request written clarification where evidence is missing.

Questions homeowners ask

Does this guide apply to every Fairfax mailing address?

Confirm the parcel’s actual permitting authority and electric provider. Use the County guidance when Fairfax County reviews your project and the Dominion section when Dominion Energy Virginia serves the account. A mailing city is not proof of either responsibility.

Does Fairfax County require a residential solar permit?

The County requires a residential solar permit for roof-mounted and free-standing residential projects. Confirm the applicable route for your building and full work scope.

Source: Fairfax County: residential solar permit requirements. Reviewed 2026-10-06.

Is all electrical work included in the solar record?

The County includes related equipment in the solar process without a standalone electrical record. Additional work, such as replacing or increasing electrical service, requires a separate electrical record. Ask the applicant to map the quote’s work to its records.

Source: Fairfax County: residential solar permit requirements. Reviewed 2026-10-06.

Do condos and apartment buildings use the same route?

Not necessarily. The County notes that some residential properties use commercial building permits. Its residential definition covers detached one- or two-family dwellings or townhouses no more than three stories above ground. Confirm classification before applying.

Source: Fairfax County: residential solar permit requirements. Reviewed 2026-10-06.

Where is the County application submitted?

Apply in PLUS under the Building tab. The County lists project-dependent drawings and supporting records. Projects in Clifton or Vienna also require respective town approvals uploaded to the record. Confirm the complete address-specific checklist.

Source: Fairfax County: residential solar permit requirements. Reviewed 2026-10-06.

When should I expect an issued permit and inspections?

Once reviews are approved and fees paid, the County makes the permit card and applicable approved plans downloadable in PLUS. Required inspections follow permit issuance and construction milestones. Retain actual records rather than only a submission receipt.

Source: Fairfax County: residential solar permit requirements. Reviewed 2026-10-06.

What does Dominion’s contingent approval establish?

Dominion requires customer and vendor signatures before contingent approval. Its grid review does not approve installation location, equipment selection or local compliance.

Source: Dominion Virginia: net metering. Reviewed 2026-10-06.

What utility step follows installation?

Dominion requires applicable electrician certification and/or local approval, portal Section 5 and inspection proof where applicable. Ask the vendor what remains outstanding.

Source: Dominion Virginia: net metering. Reviewed 2026-10-06.

Where is Dominion’s permission to operate recorded?

After metering and billing work, Dominion emails PTO to customer and vendor. Request the vendor’s copy; contingent approval alone is not PTO.

Source: Dominion Virginia: net metering. Reviewed 2026-10-06.

Can I promise a fixed approval date or zero electric bill?

No. Ask the contractor for a milestone schedule with submitted dates, open corrections and responsible parties. Separately request the actual tariff and bill assumptions for your account. An approved design, installation estimate or production model does not guarantee a deadline or financial outcome.

What can an assessment contribute before I sign?

Define the evidence gap: roof observations, shade assumptions, accessible electrical information or missing design inputs. Ask for a written scope, exclusions, qualifications and conflicts. Solar Survey AI’s survey methodology explains site evidence; confirm available service scope and access. An assessment does not issue County permits or utility authorization.

Does the Dominion bill show all solar generation?

No. Dominion says electricity consumed at home does not pass through its meter. The meter records grid deliveries and exports, not total production.

Source: Dominion Virginia: net metering. Reviewed 2026-10-06.

Are Off-Peak Plan credits interchangeable across tiers?

Dominion says Off-Peak Plan credits correspond to season, day and time, and apply only within their accrued tier. Check your actual schedule.

Source: Dominion Virginia: net metering. Reviewed 2026-10-06.

What should I compare when the meter changes?

Retain the old and new meter references, exchange date, bill periods and actual readings. Ask the utility to explain any estimated readings or adjustments on the account. Keep the invoice calculation separate from the installer’s production display so each number has a named source.

Can I copy my neighbor’s bill calculation?

Use it as a question to investigate, not your account’s terms. Request your current rate schedule and complete credit calculation, including the relevant periods and charges. Keep the effective date visible and ask which assumptions in your quote match the actual account.

Your decision checklist

  • Confirm permitting authority, building classification and electric provider.
  • Map solar, battery, roof and additional electrical work to responsible applicants.
  • Retain PLUS identifiers, issued permit and approved plan versions.
  • Track required inspections and unresolved corrections.
  • Keep Dominion application, signatures and contingent approval separately.
  • Obtain the final PTO and complete handover records before treating utility approval as finished.

Save or print this guide from your browser. Keep completed records privately.

Continue your research

Next: Why Get an Independent Solar Assessment?Next: Going Solar: A Homeowner’s Step-by-Step GuideNext: Compare Solar Quotes, Loans, Leases and PPAsNext: Roof, Shade and Battery: Homeowner Planning GuideNext: Solar Permits, Inspections and Utility ApprovalNext: Solar Not Working? A Homeowner’s Next-Step GuideNext: Buying or Selling a Home With Solar PanelsNext: Solar Bills and Export Credits ExplainedNext: How to Choose a Solar InstallerNext: Solar Warranties and Service Disputes: What to KeepNext: Home Solar Maintenance: A Safe Planning GuideNext: Solar Panels and Home Insurance: Questions to AskNext: San Diego Solar Permits and Permission to OperateNext: San Diego Solar Incentives: Verify Your EligibilityNext: Austin Energy Solar Rebate: A Homeowner GuideNext: Phoenix Solar Permits: A Homeowner Approval GuideNext: Community Solar: Check the Subscription Before SigningNext: Home Energy Assessment Before Solar: What to AskNext: Los Angeles Solar Permits and LADWP ApprovalNext: Solar Panel Recycling: Plan for RetirementNext: Solar After a Storm: Safety and Recovery RecordsNext: ComEd Solar Approval and Net Metering: Homeowner GuideNext: Tucson Solar Permits and TEP Approval: Homeowner GuideNext: Denver Solar Permits: A Homeowner Planning GuideNext: Solar Sales Claims: Verify Before You SignNext: Solar System Handover: Records to KeepNext: Sacramento Solar Permits and SMUD: Homeowner GuideNext: OUC Home Solar Approval and Export CreditsNext: Portland Solar Permits and PGE: Homeowner GuideNext: Seattle Solar Approval: City Light Homeowner GuideNext: Las Vegas Solar Permits and NV Energy: Homeowner GuideNext: FPL Solar Approval and Net Metering: Homeowner GuideNext: APS Solar Bills and Export Credits: Homeowner GuideNext: North Carolina Solar Bills: Duke Rider QuestionsNext: PSE&G Solar Approval and Bills: Homeowner GuideNext: Minnesota Solar Approval and Credits: Homeowner Guide

Track the project by issuer and responsibility

Original homeowner planning worksheet; confirm project-specific requirements with the responsible authority and utility.
TrackEvidence to requestQuestion to resolve
PropertyAuthority, utility and building classificationIs the residential route appropriate?
Work scopeSolar, service-upgrade and other work recordsWho owns each application and correction?
County reviewPLUS reference, issued permit and plan versionWhich conditions and inspections remain?
Utility reviewNotification reference, signatures and contingent approvalWhich final certification or inspection record is missing?
OperationActual PTO and equipment handover folderHas the customer received the final record?

Example: a contractor’s proposal includes rooftop panels and an electrical service increase. Ask for a written map of both work items to their approval records and prices. Do not assume the solar application covers every electrical change merely because the work appears in one quote.

Example: the installer forwards a contingent-approval email and says everything is approved. Label that record with its issuer and purpose, then request the County permit and inspection records and the final utility PTO separately. These planning scenarios do not determine compliance at an actual property.

Before paying for a separate site assessment, state which uncertainty it should resolve and what access is authorized. Request a dated report distinguishing observations, estimates and inaccessible areas. Check who commissions the review and whether sales or referral compensation affects the recommendation.

Continue with permit and utility responsibilities, handover documents, quote and financing comparison and assessment independence and limits. Explore Solar Survey AI’s evidence methodology and site survey services; confirm scope and availability for your property.

Connect approval records with the first solar bills

Original account worksheet; retain the source and period of every number.
RecordQuestion to resolve
Final PTOWhich installed configuration and date are authorized?
Meter exchangeWhat changed, and which bill contains the transition?
Rate scheduleWhich current schedule and credit tier apply?
Grid readingsWhich readings and adjustments support this bill?
Production recordWhich separate device and period describe system output?

Example: the inverter display and utility bill show different energy totals. Label the device, measurement and date range before asking for an explanation. Do not call the difference a fault or a missing credit solely because two numbers differ.

Example: a quote uses a neighbor’s bill while your account uses another rate schedule. Request an account-specific calculation and keep any unanswered assumptions visible. A permit, contingent approval or operating authorization does not verify the quoted savings.

Continue with bill reconciliation, handover records and system-problem questions. Review Solar Survey AI’s evidence methodology and confirm available inspection scope. A technical report does not determine your utility tariff or bill. Connected homeowner monitoring and free remote diagnosis remain coming soon.

About these guides

Published by Solar Survey AI, a commercial survey-services company. Our original decision checklists are recommendations; linked authorities support the referenced facts. We may benefit if you purchase our services. This is not independent certification of our company, a project-specific engineering decision or personal tax/legal advice. Local rules, contracts and site evidence control individual decisions. Reviewed 2026-10-06.