Residential

OverviewRooftop PV at volumeRoof & dronePlanes measured on the roofAttic & structureRafters recordedElectricalPanel and interconnectionDesign & engineeringModel to stamped set

Commercial & Industrial

OverviewBig roofs, real structureOn-site surveyRoof, structure, switchgearDesign & engineeringPE stampedVisual inspectionModule resolutionThermal inspectionFaults as heatElectroluminescenceCell-level cracks

Utility-Scale

OverviewThousands of acresLiDAR topographyTerrain before earthworkLand surveyingBoundary and topographicConstruction monitoringProgress, measuredThermal & ELEvery string

Across every scale

Site surveysRoof and electrical, one visitPermitting & engineeringStamped plan setsInspectionAerial thermal and ELShading analysisSA, TOF and TSRFSurvey locationsState and metro guides

The platform

Platform overviewPortal, 3D models, live dataFeature guidesWho it serves and how it worksShading analysisMove the sun yourselfCost calculatorWhat bad field data costs you

Sign in

Vanguard AccessInvite only · survey data portalScheduling & DispatchCrewLink · all verticals

Solar reference

Solar questions answeredResidential, commercial and utility-scaleSurvey methodologySources, measurements and limitsCompany factsOfficial services and capabilities

Field Notes · build vs. buy

What a survey really costsPart 01 · the full modelUtilization is the whole gamePart 02 · a real TuesdayThe break-even headcountWhen hiring pays offTwo technicians, two roofsVariance, measuredThe hybrid crewIn-house plus outsourced

Field Notes · reference

Site survey checklistBuilt backwards from reworkHow long a survey takesHour by hourDo panels need a permit?What goes in the packageStorage site surveysThe capture listCompare survey vendorsQuestions to ask any vendor

Company

All servicesAll Field NotesAboutBook a 15-min call

Home / Homeowners

Homeowner education · reviewed 2026-10-07

Cleco Solar: Credit Vintage and Account Records

Check Cleco rooftop solar export credits, grandfathering evidence, carryover and final-account records. Separate utility bills from installer forecasts.

Make the decision with evidence
  1. 01Ask the right questions
  2. 02Verify the assumptions
  3. 03Keep the records

Education, not a savings or approval guarantee.

Use this guide

Choose the questions relevant to your situation. Expand each answer, save the checklist and request written clarification where evidence is missing.

Questions homeowners ask

Are Cleco imports and exports simply netted as kWh?

Cleco describes separate delivered and received quantities and dollar amounts, with the bill obligation netted in dollars. Record both directions and their rates before comparing a solar forecast. Equal kWh do not establish an equal dollar value.

Source: Cleco: distributed generation billing overview. Reviewed 2026-10-07.

What evidence matters when asking about grandfathered credits?

The current DG tariff distinguishes grandfathered customers using interconnection or completed-application and completed-installation criteria before January 1, 2020. Ask Cleco to confirm the category using dated records; a panel age or sales promise alone does not establish eligibility.

Source: Cleco: DG tariff, revision 9 effective March 1, 2026. Reviewed 2026-10-07.

How long does the tariff describe grandfathered retail credits?

Revision 9 describes full retail export credit for grandfathered customers through December 31, 2034, then avoided-cost credit. It describes avoided-cost exports for its newer category. Keep the applicable category and current document together; this guide does not determine your account status.

Source: Cleco: DG tariff, revision 9 effective March 1, 2026. Reviewed 2026-10-07.

Why should I retain the current DG tariff rather than an old quote?

The tariff’s energy-purchase rate is adjusted annually. Check its effective date and ask which version applies to the billed period. Do not use a previous proposal’s export price as a permanent rate or as the retail price of imported electricity.

Source: Cleco: DG tariff, revision 9 effective March 1, 2026. Reviewed 2026-10-07.

Does an ongoing credit guarantee an automatic annual cash payment?

Cleco’s overview describes excess dollar credits applying to later bills and an annual account review where the utility may elect to reimburse ongoing credits. Preserve the balance and correspondence; annual review does not itself establish a guaranteed annual payout.

Source: Cleco: distributed generation billing overview. Reviewed 2026-10-07.

What should I ask before closing service on a solar home?

The tariff describes final-service credit settlement after amounts owed, with different wording for its customer categories. Request Cleco’s written calculation and applicable treatment before closure. Keep the closing bill and contact record; do not promise a buyer that the existing account balance or category transfers.

Source: Cleco: DG tariff, revision 9 effective March 1, 2026. Reviewed 2026-10-07.

Is a community-solar schedule the same as rooftop DG?

Cleco’s rates hub lists DG and community DG as separate schedules and explains that bills identify rate codes. Save your actual code, retail schedule and applicable riders. A community-program document is not evidence of your rooftop account’s export treatment.

Source: Cleco: rate codes, schedules and riders. Reviewed 2026-10-07.

Your decision checklist

  • Confirm Cleco is the actual serving utility.
  • Keep imports and exports in separate columns.
  • Ask for written confirmation of the credit category.
  • Save application, installation and interconnection dates.
  • Match the tariff version to the billing period.
  • Track carried credits and any settlement correspondence.
  • Clarify closing-account treatment before a home transfer.

Save or print this guide from your browser. Keep completed records privately.

Separate the utility records behind a solar forecast

Original private homeowner credit-record organizer; not a utility application, eligibility decision or payout calculation.
RecordEvidence and next question
Account identityServing utility, rate code, billing dates and applicable retail schedule; verify the actual Cleco account.
Category evidenceCompleted application, installation and interconnection records; ask the utility which dates and category it recognizes.
Tariff versionDG revision, effective date, relevant bill period and utility response explaining the rate used.
Two meter directionsDelivered and received kWh, separate prices and dollar lines; do not substitute total inverter production.
Credit historyOpening balance, new credit, amount applied, remaining balance and correspondence about any reimbursement.
Closing serviceProposed closing date, final bill, amounts owed, settlement calculation and requested written explanation.
Home transferSeller records shared securely, buyer utility confirmation and unresolved questions; no assumed transfer of credit or eligibility.

Fictional bill example: a homeowner records 250 imported kWh and 250 exported kWh in a month. The worksheet labels the bill “zero” without listing the two prices or other bill lines. Leave the dollar result blank until the relevant records are available. Equal quantities are an observation, not a verified account calculation. Keep inverter production separate from the utility’s received-energy record and compare matching dates.

Fictional home-sale example: a seller’s folder contains an old installation invoice, an accumulated credit and a proposal calling the system grandfathered. The buyer creates three unanswered questions: which category does the utility recognize, how will the seller’s account close, and what documents apply to the buyer’s service? Do not use the proposal to answer all three. Obtain account-specific utility responses and keep the seller’s private identifiers out of a public listing.

Reviewed October 7, 2026 against Cleco’s distributed-generation overview, the current linked DG tariff, effective March 1, 2026, and rates and fees hub. The tariff contains more detailed category language than the overview. Ask the utility to resolve the actual records and account treatment; use the tariff rather than simplifying the overview into an eligibility promise. No cents-per-kWh figure, savings estimate or customer eligibility conclusion is provided here.

This guide concerns Cleco Power rooftop customer records in Louisiana. It does not establish a statewide policy, cover another utility’s export program, or substitute for the complete interconnection agreement. The organizer and fictional examples are editorial preparation aids, not extra legal requirements. Keep account numbers, signatures, service details and login credentials private. Request an explanation of a disputed bill in writing and retain the response.

Review existing records safely. Do not open electrical enclosures, climb onto a roof, switch on an unapproved system, change inverter or export settings, or conduct live tests to investigate a credit discrepancy. A billing question and a technical production question need their own evidence; neither an unexplained line nor a forecast mismatch proves the cause.

Continue with solar bill measurement checks, utility approval milestones and buying and selling a solar home. Solar Survey AI’s evidence methodology helps separate observations from unanswered assumptions. For technical concerns, confirm available inspection scope, location availability, qualifications, access, fees and commercial conflicts. Third-party does not automatically mean independent. An inspection cannot set a utility rate, decide grandfathering, authorize interconnection or guarantee a payout. Homeowner monitoring connections and planned free remote diagnosis remain coming soon.

About these guides

Published by Solar Survey AI, a commercial survey-services company. Our original decision checklists are recommendations; linked authorities support the referenced facts. We may benefit if you purchase our services. This is not independent certification of our company, a project-specific engineering decision or personal tax/legal advice. Local rules, contracts and site evidence control individual decisions. Reviewed 2026-10-07.

For available survey or inspection services, confirm your project scope and availability with our team. Our planned free homeowner remote diagnosis remains coming soon.

Survey services · Inspection services · Monitoring early access
Book a 15-min call