Residential

OverviewRooftop PV at volumeRoof & dronePlanes measured on the roofAttic & structureRafters recordedElectricalPanel and interconnectionDesign & engineeringModel to stamped set

Commercial & Industrial

OverviewBig roofs, real structureOn-site surveyRoof, structure, switchgearDesign & engineeringPE stampedVisual inspectionModule resolutionThermal inspectionFaults as heatElectroluminescenceCell-level cracks

Utility-Scale

OverviewThousands of acresLiDAR topographyTerrain before earthworkLand surveyingBoundary and topographicConstruction monitoringProgress, measuredThermal & ELEvery string

Across every scale

Site surveysRoof and electrical, one visitPermitting & engineeringStamped plan setsInspectionAerial thermal and ELShading analysisSA, TOF and TSRFSurvey locationsState and metro guides

The platform

Platform overviewPortal, 3D models, live dataFeature guidesWho it serves and how it worksShading analysisMove the sun yourselfCost calculatorWhat bad field data costs you

Sign in

Vanguard AccessInvite only · survey data portalScheduling & DispatchCrewLink · all verticals

Solar reference

Solar questions answeredResidential, commercial and utility-scaleSurvey methodologySources, measurements and limitsCompany factsOfficial services and capabilities

Field Notes · build vs. buy

What a survey really costsPart 01 · the full modelUtilization is the whole gamePart 02 · a real TuesdayThe break-even headcountWhen hiring pays offTwo technicians, two roofsVariance, measuredThe hybrid crewIn-house plus outsourced

Field Notes · reference

Site survey checklistBuilt backwards from reworkHow long a survey takesHour by hourDo panels need a permit?What goes in the packageStorage site surveysThe capture listCompare survey vendorsQuestions to ask any vendor

Company

All servicesAll Field NotesAboutBook a 15-min call

Home / Homeowners

Homeowner education · reviewed 2026-10-06

Solar Production Estimates: Keep the Input Records

Review solar production estimates with a PVWatts input worksheet. Separate capacity, weather, losses and modeled energy from actual monitoring and bill savings.

Make the decision with evidence
  1. 01Ask the right questions
  2. 02Verify the assumptions
  3. 03Keep the records

Education, not a savings or approval guarantee.

Use this guide

Choose the questions relevant to your situation. Expand each answer, save the checklist and request written clarification where evidence is missing.

Questions homeowners ask

Which capacity belongs in the estimate?

The calculator asks for system size in DC kilowatts. Keep the panel nameplate total separate from inverter AC capacity. For illustration, twenty 400-watt panels total 8 DC kW; that arithmetic does not verify the proposed equipment or wiring.

Source: PVWatts: calculator assumptions and site-input limitations. Reviewed 2026-10-06.

Does drawing an area on a roof verify the proposed array?

No. PVWatts says its roof-area size estimate does not account for tilt, azimuth or shading. Obtain the actual equipment schedule and roof evidence rather than treating the drawn area as a completed design.

Source: PVWatts: calculator assumptions and site-input limitations. Reviewed 2026-10-06.

Does the weather file describe my last billing month?

Not automatically. The V8 documentation identifies typical meteorological year datasets and the weather-source fields returned with results. Retain the dataset, location and period. A typical-year estimate is a different record from measured weather during your actual operating month.

Source: PVWatts V8: input, weather and output definitions. Reviewed 2026-10-06.

Does the default shading loss prove my roof has little shade?

No. The calculator’s default shading assumption represents little or no shading. Ask what site assessment supports the selected value. Keep a default, a remote model and a measured observation distinctly labeled.

Source: PVWatts: calculator assumptions and site-input limitations. Reviewed 2026-10-06.

Which energy output should I retain?

V8 defines monthly and annual AC energy in kWh; hourly AC output is in watts. Preserve the output label and interval. Comparing an instantaneous power reading with a monthly energy total does not answer whether the estimate was met.

Source: PVWatts V8: input, weather and output definitions. Reviewed 2026-10-06.

Can a forecast establish an equipment fault or a warranty remedy?

No. DOE explains that model uncertainty depends on inputs and the underlying representation. A difference calls for checking configuration, data and conditions. A qualified investigation and the actual warranty are separate from the forecast.

Source: DOE: photovoltaic modeling uncertainty. Reviewed 2026-10-06.

Your decision checklist

  • Obtain the complete estimate and its preparation date.
  • Identify actual DC capacity, inverter and roof-plane layout.
  • Retain weather dataset, location and model version.
  • Label tilt, orientation and loss assumptions with their evidence.
  • Keep monthly AC energy and warnings with the inputs.
  • Compare estimates, measured generation and bills separately.

Save or print this guide from your browser. Keep completed records privately.

Prepare the questions and separate the records

Original private estimate-review worksheet; not a calculator result or engineered design.
RecordQuestion to resolve
Equipment and layoutWhich panel total, inverter and roof planes are represented?
Weather basisWhich location, source and representative period support the estimate?
Site assumptionsWhich orientation, tilt and losses have evidence, and which remain defaults?
Comparable outputWhich month, AC energy unit and scenario does each result describe?
Open questionWhat should the designer or scoped reviewer explain before reliance?

Start with the complete proposal estimate, not a screenshot of its annual headline. Ask the author for the input record, monthly output, model version and important warnings. Mark each input documented, estimated or unresolved. Keep the original file privately so a later revised scenario can be compared with the version used in the proposal.

Next, match the represented system to the actual proposal. Record panel quantity and model, roof planes, orientation and the intended inverter. If a reviewer combines different roof planes into one representation, ask why that method is appropriate and what limits it introduces. Do not change assumptions merely to make the result match a sales promise.

Example: two proposals show similar annual generation, but one represents a different panel total and shading assumption. Ask both authors to explain those inputs before ranking the offers. An equal headline does not establish equal equipment, site evidence or performance.

Example: a homeowner compares a typical-year monthly estimate with an app total covering only part of that month. First retain the dates, missing-data status and what the app measures. A lower partial-period total cannot by itself establish a failed array. Use qualified support for an unresolved physical concern; do not open equipment or climb onto the roof.

The benefit of this record is a reproducible question: which assumption changed and why? Its limit is that a planning estimate cannot inspect concealed conditions, certify a design, establish delivered generation or decide a guarantee. Separate a technical forecast from any written production commitment and its measurement rules.

Generation is also separate from bill savings. Keep imports, exports, household use, tariff periods, recurring charges and solar payments in the financial comparison. Do not multiply every forecast kWh by a retail rate and call that a verified household benefit.

Reviewed October 6, 2026 against the current PVWatts calculator, its V8 definitions and DOE modeling guidance. Our worksheet and hypothetical examples are editorial aids. These references do not endorse Solar Survey AI or validate an individual estimate.

Continue with roof and shade planning, bill and export-credit records and safe system-problem checks. Solar Survey AI’s evidence methodology and shading services explain relevant scope; confirm availability, input quality and limitations. For installed-system observations, confirm inspection scope, qualifications and conflicts. A third-party review is not automatically independent. Homeowner monitoring connections and planned remote diagnosis remain coming soon.

Continue your research

Next: Why Get an Independent Solar Assessment?Next: Going Solar: A Homeowner’s Step-by-Step GuideNext: Compare Solar Quotes, Loans, Leases and PPAsNext: Roof, Shade and Battery: Homeowner Planning GuideNext: Solar Permits, Inspections and Utility ApprovalNext: Solar Not Working? A Homeowner’s Next-Step GuideNext: Buying or Selling a Home With Solar PanelsNext: Solar Bills and Export Credits ExplainedNext: How to Choose a Solar InstallerNext: Solar Warranties and Service Disputes: What to KeepNext: Home Solar Maintenance: A Safe Planning GuideNext: Solar Panels and Home Insurance: Questions to AskNext: San Diego Solar Permits and Permission to OperateNext: San Diego Solar Incentives: Verify Your EligibilityNext: Austin Energy Solar Rebate: A Homeowner GuideNext: Phoenix Solar Permits: A Homeowner Approval GuideNext: Community Solar: Check the Subscription Before SigningNext: Home Energy Assessment Before Solar: What to AskNext: Los Angeles Solar Permits and LADWP ApprovalNext: Solar Panel Recycling: Plan for RetirementNext: Solar After a Storm: Safety and Recovery RecordsNext: ComEd Solar Approval and Net Metering: Homeowner GuideNext: Tucson Solar Permits and TEP Approval: Homeowner GuideNext: Denver Solar Permits: A Homeowner Planning GuideNext: Solar Sales Claims: Verify Before You SignNext: Solar System Handover: Records to KeepNext: Sacramento Solar Permits and SMUD: Homeowner GuideNext: OUC Home Solar Approval and Export CreditsNext: Fairfax County Solar Permits and Utility ApprovalNext: Portland Solar Permits and PGE: Homeowner GuideNext: Seattle Solar Approval: City Light Homeowner GuideNext: Las Vegas Solar Permits and NV Energy: Homeowner GuideNext: FPL Solar Approval and Net Metering: Homeowner GuideNext: APS Solar Bills and Export Credits: Homeowner GuideNext: North Carolina Solar Bills: Duke Rider QuestionsNext: PSE&G Solar Approval and Bills: Homeowner GuideNext: Minnesota Solar Approval and Credits: Homeowner GuideNext: Maryland Solar Credits: Banking and Bill ChecklistNext: New York Rooftop Solar: Provider and Contract ChecksNext: Boston Solar Permits: Homeowner Document ChecklistNext: Connecticut Solar Tariffs: RRES Homeowner ChecklistNext: Ameren Missouri Solar: Bills and Approval RecordsNext: Pennsylvania Solar Bills: Supplier and Credit ChecksNext: PNM Solar Bills: Energy Banks and Agreement ChecksNext: Maine Solar Credits: Expiration and Bill ChecklistNext: Georgia Power Solar: Bills and Approval ChecksNext: DTE Solar Bills: Outflow and Credit Bank ChecksNext: PSE Solar: Net Metering and Program Record ChecksNext: Dominion SC Solar Choice: Bill and Meter RecordsNext: National Grid MA Solar: Credit and Transfer RecordsNext: SDG&E Solar Bills: Export Pricing Record ChecksNext: CPS Energy Solar: Meter and Commissioning RecordsNext: SRP Solar Plans: Demand and Export Record ChecksNext: Xcel Colorado Solar: Bank Election and Bill RecordsNext: Evergy Home Solar: Territory and Meter Record ChecksNext: We Energies Solar: Meter Configuration and Bill ChecksNext: Utah Solar: Rocky Mountain Power Net Billing RecordsNext: AEP Ohio Solar: Supplier and Credit RecordsNext: Entergy Louisiana Solar: Rider and Meter RecordsNext: Indiana Solar: Tariff and Complaint RecordsNext: Oncor Solar: REP and Meter RecordsNext: Entergy Arkansas Solar Credit RecordsNext: OG&E Oklahoma Solar: Meter and Bill RecordsNext: OPPD Solar Bills: Net Meter and Approval RecordsNext: Hawaiian Electric Solar: Program and Credit RecordsNext: NV Energy North Solar: Interval and Approval RecordsNext: SMUD Battery Program: Consent and Enrollment RecordsNext: PG&E Solar Bills: Plan and True-Up Record ChecksNext: SCE Solar Credits: Settlement and Bill RecordsNext: LADWP Solar Credits: Meter and Account RecordsNext: Nashville NES Solar: Program and Approval RecordsNext: PSO Oklahoma Solar: Plans and Approval RecordsNext: Ameren Illinois Solar Credits: Keep the Election RecordNext: Dallas Solar Permits: Review Pathways and RecordsNext: DC Solar SRECs: Certification and Ownership RecordsNext: Florida Solar Contractors: License and Business ChecksNext: Texas Solar Contracts: Registration and Cancellation ChecksNext: California Solar: Consumer Documents Before SigningNext: Illinois Shines: Records for a Solar Home TransferNext: Enphase Solar: Maintainer and Data Access ChecksNext: Philadelphia Solar Permits: EZ Route and Project RecordsNext: Montgomery County MD Solar: eSolar Permit ChecklistNext: SolarEdge Monitoring: Transfer and Access RecordsNext: Tesla Solar Home Sales: Contract and Access RecordsNext: New York City Solar: Permit Team and Inspection RecordsNext: JEA Solar Home Move-In: Credit and Handover RecordsNext: Austin Solar Home Sale: ECAD Audit and Disclosure RecordsNext: Georgia Solar Contracts: Payment and Transfer ChecksNext: LG Home Battery Recalls: Identity and Remedy RecordsNext: Virginia Solar HOA Documents: Before You SignNext: Sunrun Solar Home Sales: Service Transfer ChecklistNext: New Jersey Solar Home Sales: Certificate RecordsNext: Massachusetts Solar Home Sales: Incentive RecordsNext: Oregon Solar Contractors: License and Complaint RecordsNext: California Solar Payments: Notices and Lien RecordsNext: Oregon Solar Sales: Disclosure and Contract RecordsNext: Oregon Solar Incentives: Reservation and Status RecordsNext: Wisconsin Solar Proposals: Contract and Complaint RecordsNext: Michigan Solar Contracts: Cancellation Review RecordsNext: SolarEdge Cellular Data: Plan and Warranty ChecksNext: Pennsylvania Solar Contractors: Registration RecordsNext: Virginia Solar Contracts: Prepare for 2027 DisclosuresNext: Virginia Shared Solar: Subscription and Bill RecordsNext: Minnesota Solar Gardens: LMI Program Record ChecksNext: Illinois Community Solar: Moving and Transfer RecordsNext: New York Community Solar: Compare Plan RecordsNext: Nevada Solar Contractors: License and Contract RecordsNext: Utah Solar Retailers: Registration Record ChecksNext: Rhode Island Solar: Retailer and Disclosure RecordsNext: Connecticut Solar Sales: People and Credential RecordsNext: New Mexico Solar Tax Credit: Certification RecordsNext: Maryland Solar Access: Reservation and Payment RecordsNext: Delaware Solar Rebates: Application and Payment RecordsNext: Washington Solar: Contractor and Electrical RecordsNext: LES Community Solar: Compare Credits and ContributionsNext: Idaho Solar: Contractor and Electrical Permit RecordsNext: Oklahoma Solar: Active Contractor and Approval RecordsNext: Tennessee Solar: Contractor Records Before BiddingNext: New Hampshire Solar: Verify Incentives Before SigningNext: Alabama Solar: Contractor Scope and License RecordsNext: LG&E and KU Solar: Service Dates and Credit RecordsNext: Duke Florida Solar: Compare Subscription RecordsNext: Maine Solar Contracts: Review Before SigningNext: Vermont Solar: Registration and Contract Record ChecksNext: Massachusetts Solar: Contract and Payment Record ChecksNext: Maryland Solar: Wildlife Barrier and Waiver RecordsNext: South Carolina Solar: Trade Authority Record ChecksNext: North Carolina Solar: License Identity Record ChecksNext: Minnesota Solar: Contracting and Installer Role RecordsNext: Arizona Solar Disputes: Recovery and Complaint RecordsNext: California Solar: Complaint and Restitution RecordsNext: Nevada Solar: Recovery Claim RecordsNext: Florida Solar: Recovery Route RecordsNext: Powerwall 2 Recall: Replacement Record ChecklistNext: Sunnova to SunStrong: Service Transition RecordsNext: Legacy SunPower: Support Route and Warranty Records

About these guides

Published by Solar Survey AI, a commercial survey-services company. Our original decision checklists are recommendations; linked authorities support the referenced facts. We may benefit if you purchase our services. This is not independent certification of our company, a project-specific engineering decision or personal tax/legal advice. Local rules, contracts and site evidence control individual decisions. Reviewed 2026-10-06.

For available survey or inspection services, confirm your project scope and availability with our team. Our planned free homeowner remote diagnosis remains coming soon.

Survey services · Inspection services · Monitoring early access
Book a 15-min call