Residential

OverviewRooftop PV at volumeRoof & dronePlanes measured on the roofAttic & structureRafters recordedElectricalPanel and interconnectionDesign & engineeringModel to stamped set

Commercial & Industrial

OverviewBig roofs, real structureOn-site surveyRoof, structure, switchgearDesign & engineeringPE stampedVisual inspectionModule resolutionThermal inspectionFaults as heatElectroluminescenceCell-level cracks

Utility-Scale

OverviewThousands of acresLiDAR topographyTerrain before earthworkLand surveyingBoundary and topographicConstruction monitoringProgress, measuredThermal & ELEvery string

Across every scale

Site surveysRoof and electrical, one visitPermitting & engineeringStamped plan setsInspectionAerial thermal and ELShading analysisSA, TOF and TSRFSurvey locationsState and metro guides

The platform

Platform overviewPortal, 3D models, live dataFeature guidesWho it serves and how it worksShading analysisMove the sun yourselfCost calculatorWhat bad field data costs you

Sign in

Vanguard AccessInvite only · survey data portalScheduling & DispatchCrewLink · all verticals

Solar reference

Solar questions answeredResidential, commercial and utility-scaleSurvey methodologySources, measurements and limitsCompany factsOfficial services and capabilities

Field Notes · build vs. buy

What a survey really costsPart 01 · the full modelUtilization is the whole gamePart 02 · a real TuesdayThe break-even headcountWhen hiring pays offTwo technicians, two roofsVariance, measuredThe hybrid crewIn-house plus outsourced

Field Notes · reference

Site survey checklistBuilt backwards from reworkHow long a survey takesHour by hourDo panels need a permit?What goes in the packageStorage site surveysThe capture listCompare survey vendorsQuestions to ask any vendor

Company

All servicesAll Field NotesAboutBook a 15-min call

Field Notes

Build vs. buy, with the arithmetic shown

A five-part series on what a residential site survey actually costs when you run your own crew, and where the crossover against outsourcing really sits. Every model on these pages is editable. Put your own numbers in and argue with the result.

Latest notes

New field notes, newest first. What each kind of site actually needs from the people who measure it.

Local permitting · Residential

How to get a solar permit in Houston

City application, engineering evidence, CenterPoint PTO and current incentive checks, with official sources.

HoustonPermittingSource-backed
Latest · Residential

Remote vs onsite solar site survey: what needs a visit

Which decisions remote evidence can support, what imagery cannot establish, and how to request the missing field data before committing a design.

InteractiveResidential8 min
Latest · Residential

Solar site survey tools: the field kit, by what it measures

Every tool on a survey truck, sorted by what it measures and the error it prevents, with real field captures and an interactive kit board.

InteractiveResidential8 min
Latest · All verticals

Solar site survey software: a buyer's checklist

Seven tests for any solar site survey app, from offline capture to data ownership, with a trial step for each and a score-an-app gauge.

InteractiveAll verticals8 min
Latest · All verticals

AI tools for solar site assessment: what they see, and what they can't

What imagery-based AI reliably sees versus what still needs someone on site, with a comparison table and an 8-point checklist for judging any AI survey tool.

InteractiveAll verticals9 min
Latest · Residential

What a residential solar site survey actually needs

The necessary minimum from a residential visit, sorted by who reads it: designer, AHJ, utility and structural engineer. With real field captures from our surveys.

InteractiveResidential8 min
Latest · Commercial & Industrial

What a commercial solar site survey needs

Roof, structure, electrical room, site and handoff. Most of it is invisible from above, and a miss costs an engineering cycle rather than a truck roll.

InteractiveC&I8 min
Latest · Utility-Scale

Utility-scale sites: prepare, monitor and attack the build

What to measure before civil design, every week of the build, and at commissioning. A three-phase playbook for moving crews down the critical path.

InteractiveUtility-Scale9 min

Reference notes

Standalone pieces, not part of the series above. The capture specs and permitting notes we get asked for most often.

How to read this series

The models are not a quote and they are not benchmarks. Every default is a plausible starting assumption for a mid-size residential installer, chosen so the arithmetic is legible, and every one of them is wrong for your company in some direction. The point is the structure of the calculation, not our numbers.

Nothing you type is sent anywhere. The models run in your browser and keep nothing.

They are also deliberately narrow. Cost per survey is not the only thing that decides this question, and it is usually not the most important one. Turnaround, coverage, capture quality and what happens when your volume triples all matter more, and only the last part of the series touches any of them.

Run it against your own volume

One site, fixed fee, defined deliverable. We will put a real number next to yours before anybody talks about a contract.

Book a working session