Residential

OverviewRooftop PV at volumeRoof & dronePlanes measured on the roofAttic & structureRafters recordedElectricalPanel and interconnectionDesign & engineeringModel to stamped set

Commercial & Industrial

OverviewBig roofs, real structureOn-site surveyRoof, structure, switchgearDesign & engineeringPE stampedVisual inspectionModule resolutionThermal inspectionFaults as heatElectroluminescenceCell-level cracks

Utility-Scale

OverviewThousands of acresLiDAR topographyTerrain before earthworkLand surveyingBoundary and topographicConstruction monitoringProgress, measuredThermal & ELEvery string

Across every scale

Site surveysRoof and electrical, one visitPermitting & engineeringStamped plan setsInspectionAerial thermal and ELShading analysisSA, TOF and TSRFSurvey locationsState and metro guides

The platform

Platform overviewPortal, 3D models, live dataFeature guidesWho it serves and how it worksShading analysisMove the sun yourselfCost calculatorWhat bad field data costs you

Sign in

Vanguard AccessInvite only · survey data portalScheduling & DispatchCrewLink · all verticals

Solar reference

Solar questions answeredResidential, commercial and utility-scaleSurvey methodologySources, measurements and limitsCompany factsOfficial services and capabilities

Field Notes · build vs. buy

What a survey really costsPart 01 · the full modelUtilization is the whole gamePart 02 · a real TuesdayThe break-even headcountWhen hiring pays offTwo technicians, two roofsVariance, measuredThe hybrid crewIn-house plus outsourced

Field Notes · reference

Site survey checklistBuilt backwards from reworkHow long a survey takesHour by hourDo panels need a permit?What goes in the packageStorage site surveysThe capture listCompare survey vendorsQuestions to ask any vendor

Company

All servicesAll Field NotesAboutBook a 15-min call

Home / Homeowners

Homeowner education · reviewed 2026-10-06

Denver Solar Permits: A Homeowner Planning Guide

Plan Denver rooftop solar permits with official SolarAPP+ criteria, electrical review and historic-property requirements. Keep records before installation.

Make the decision with evidence
  1. 01Ask the right questions
  2. 02Verify the assumptions
  3. 03Keep the records

Education, not a savings or approval guarantee.

Use this guide

Choose the questions relevant to your situation. Expand each answer, save the checklist and request written clarification where evidence is missing.

Questions homeowners ask

Does this guide apply throughout the Denver metro area?

No. Confirm the actual property jurisdiction and electric utility. This guide concerns City and County of Denver residential solar permitting. Nearby communities can use different authorities and procedures. Treat a mailing address, installer territory or neighborhood name as a starting point, not a jurisdiction determination.

Does a home solar system need an electrical permit?

Denver says all systems require an electrical permit. Other permits may apply to the project.

Source: City and County of Denver: solar permit routes and application documents. Reviewed 2026-10-06.

Which rooftop projects can use Denver’s SolarAPP+ quick route?

Licensed electricians can apply for qualifying single-family or duplex projects with utility service of 400 amps or less and PV below 10 kW DC. Solar shingles are excluded; verify the complete criteria.

Source: City and County of Denver: solar permit routes and application documents. Reviewed 2026-10-06.

Can the solar quick application include unrelated electrical work?

Denver allows related storage, main-panel upgrades and deratings in the qualifying PV scope. Service upgrades, new AC panels, EV chargers and unrelated rewiring need separate permitting.

Source: City and County of Denver: solar permit routes and application documents. Reviewed 2026-10-06.

What follows SolarAPP+ design approval?

Use the approval ID and documents in Denver e-permits: Electrical Permit under Quick Permits, appropriate residential use, Solar PV class. Upload approval documents and manufacturer sheets.

Source: City and County of Denver: solar permit routes and application documents. Reviewed 2026-10-06.

What if my single-family or duplex project does not qualify?

Use a Building Log. Denver requires engineered electrical plans at 10 kW or above; smaller systems still require non-engineered plan review.

Source: City and County of Denver: solar permit routes and application documents. Reviewed 2026-10-06.

What evidence should the site plan show?

Denver requires site-plan evidence of panel layout, roof access and obstructions, plus supporting electrical documents.

Source: City and County of Denver: solar permit routes and application documents. Reviewed 2026-10-06.

What if the home is a landmark or in a historic district?

Denver requires a certificate of appropriateness for these solar projects and recommends obtaining it before building and zoning applications. Research the actual property status.

Source: City and County of Denver: solar permit routes and application documents. Reviewed 2026-10-06.

Does a quick permit prove the whole project is approved?

Denver explains that quick permits cover specific work and generally do not cover structural work. Landmark Preservation also reviews exterior work on designated properties. Ask which separate records your scope needs. Do not substitute a trade permit for a complete project handover.

Source: City and County of Denver: quick permits and landmark review. Reviewed 2026-10-06.

How should I involve Solar Survey AI and the utility?

Keep utility approval and City permitting as separate responsibilities; ask your installer and actual utility for the required operating authorization. Ask our team to confirm homeowner assessment availability, scope, qualifications, conflicts and limits. A scoped survey can help organize accessible site-condition evidence, but it does not issue permits, grant utility permission or guarantee approval. Third-party status alone does not establish independence.

Your decision checklist

  • Confirm Denver jurisdiction and the actual utility.
  • Have the electrician identify the correct review route.
  • Separate PV, unrelated electrical and structural work in the scope.
  • Research historic-property status before relying on a quick route.
  • Request the plan version and supporting equipment records.
  • Keep design approval, issued permits and inspection results distinct.
  • Ask who resolves corrections or design changes.
  • Retain actual utility operating authorization and the final handover folder.

Save or print this guide from your browser. Keep completed records privately.

Compare the promised scope with the approval folder

Original homeowner planning worksheet; this is not a permit application or engineering certification.
QuestionRecord to requestLeave unresolved until
What property and project were reviewed?Address, project reference and dated equipment listThe records describe your actual project
Which work is included?Written PV, battery, roof and electrical scopeSeparate work and responsible contractors are identified
Which permit route applies?Eligibility assessment and submitted plan versionThe authority and applicant confirm the route
What did the City issue?Actual permits, conditions and inspection recordsMissing corrections and inspections are accounted for
What remains with the utility?Utility project reference and final operating authorizationThe utility and installer confirm the operating milestone

Example: an 8 kW DC proposal also includes an EV charger and a service upgrade. Do not infer that one solar approval covers every line in the quote. Ask the electrician to map each work item to its permitting route, price and completion owner. The system size alone is not a complete eligibility check.

Example: a smaller PV proposal is advertised as requiring no engineering. Ask what electrical review applies, what roof or structural questions remain, and who is qualified to address them. A statement about one type of plan does not resolve every design question or establish that concealed framing was evaluated.

Before booking a site assessment, write down the decision it should support: comparing roof-layout assumptions, documenting accessible obstructions or identifying missing observations. Request exclusions and any referral relationships in writing. These are editorial planning recommendations, not additional Denver legal requirements.

Continue with assessment conflicts and scope, roof, shade and battery questions and permit and utility responsibilities. Explore our evidence methodology and site-survey services; confirm availability for your address.

About these guides

Published by Solar Survey AI, a commercial survey-services company. Our original decision checklists are recommendations; linked authorities support the referenced facts. We may benefit if you purchase our services. This is not independent certification of our company, a project-specific engineering decision or personal tax/legal advice. Local rules, contracts and site evidence control individual decisions. Reviewed 2026-10-06.

For available survey or inspection services, confirm your project scope and availability with our team. Our planned free homeowner remote diagnosis remains coming soon.

Survey services · Inspection services · Monitoring early access
Book a 15-min call