Residential

OverviewRooftop PV at volumeRoof & dronePlanes measured on the roofAttic & structureRafters recordedElectricalPanel and interconnectionDesign & engineeringModel to stamped set

Commercial & Industrial

OverviewBig roofs, real structureOn-site surveyRoof, structure, switchgearDesign & engineeringPE stampedVisual inspectionModule resolutionThermal inspectionFaults as heatElectroluminescenceCell-level cracks

Utility-Scale

OverviewThousands of acresLiDAR topographyTerrain before earthworkLand surveyingBoundary and topographicConstruction monitoringProgress, measuredThermal & ELEvery string

Across every scale

Site surveysRoof and electrical, one visitPermitting & engineeringStamped plan setsInspectionAerial thermal and ELShading analysisSA, TOF and TSRFSurvey locationsState and metro guides

The platform

Platform overviewPortal, 3D models, live dataFeature guidesWho it serves and how it worksShading analysisMove the sun yourselfCost calculatorWhat bad field data costs you

Sign in

Vanguard AccessInvite only · survey data portalScheduling & DispatchCrewLink · all verticals

Solar reference

Solar questions answeredResidential, commercial and utility-scaleSurvey methodologySources, measurements and limitsCompany factsOfficial services and capabilities

Field Notes · build vs. buy

What a survey really costsPart 01 · the full modelUtilization is the whole gamePart 02 · a real TuesdayThe break-even headcountWhen hiring pays offTwo technicians, two roofsVariance, measuredThe hybrid crewIn-house plus outsourced

Field Notes · reference

Site survey checklistBuilt backwards from reworkHow long a survey takesHour by hourDo panels need a permit?What goes in the packageStorage site surveysThe capture listCompare survey vendorsQuestions to ask any vendor

Company

All servicesAll Field NotesAboutBook a 15-min call

Home / Homeowners

Homeowner education · reviewed 2026-10-06

PSE&G Solar Approval and Bills: Homeowner Guide

Plan PSE&G solar approval in New Jersey with official process links, net-metering questions and a homeowner worksheet for operating and billing records.

Make the decision with evidence
  1. 01Ask the right questions
  2. 02Verify the assumptions
  3. 03Keep the records

Education, not a savings or approval guarantee.

Use this guide

Choose the questions relevant to your situation. Expand each answer, save the checklist and request written clarification where evidence is missing.

Questions homeowners ask

Does preliminary project approval let me operate the system?

No. PSE&G distinguishes preliminary construction approval from its Permission to Operate notice. Retain the actual PTO before operation; this guide provides no energizing or testing instructions.

Source: PSE&G: Solar application and operating approval. Reviewed 2026-10-06.

What completion records does PSE&G request?

Its published process lists the approved UCC Certificate of Approval, Certificate of Completion and as-built documents. Ask the installer to identify the current submission and notification reference.

Source: PSE&G: Solar application and operating approval. Reviewed 2026-10-06.

Does a local approval replace PSE&G’s final decision?

No. PSE&G describes final utility review and the PTO outcome after completion documentation. Keep local approval and utility authorization as separate records.

Source: PSE&G: Solar application and operating approval. Reviewed 2026-10-06.

What if the utility inspection identifies corrections?

PSE&G says an unsuccessful inspection results in notice of needed actions. Request that notice, the responsible contractor and the correction record. Do not treat an appointment as approval.

Source: PSE&G: Solar application and operating approval. Reviewed 2026-10-06.

Why does exported energy differ from my app’s production?

PSE&G records unused excess sent to its grid. Energy used at home accounts for part of the difference. Compare matching periods and quantities rather than assuming a meter error.

Source: PSE&G: Net metering and solar bills. Reviewed 2026-10-06.

What happens at the Anniversary True Up?

PSE&G describes annual valuation of remaining energy credits and resetting the accumulated energy credit. Confirm your account’s actual anniversary and resulting bill entry.

Source: PSE&G: Net metering and solar bills. Reviewed 2026-10-06.

Are remaining annual credits valued like the full retail bill?

PSE&G describes market-price valuation at annual reconciliation, excluding delivery and system charges. Request the applicable calculation; this guide gives no credit rate or savings forecast.

Source: PSE&G: Net metering and solar bills. Reviewed 2026-10-06.

Can time-of-use credit banks be combined?

PSE&G says each time-of-use period has a separate energy bank; peak and off-peak banks cannot be combined. Confirm your account’s rate before modeling credits.

Source: PSE&G: Net metering and solar bills. Reviewed 2026-10-06.

Does this guide cover PSEG Long Island or every New Jersey utility?

No. Verify the electric utility on your account and the permit authority for your parcel. This guide concerns PSE&G’s New Jersey process. A similar company name, mailing city or neighboring project does not establish the applicable requirements.

What should I keep when project details change?

Retain the proposed change, updated equipment and drawings, contractor explanation and written confirmation of any required review. Ask which existing approvals remain applicable. A changed design should not silently inherit an earlier project’s evidence.

Your decision checklist

  • Confirm PSE&G is the electric utility for the property.
  • Identify the responsible local permit authority.
  • Keep preliminary approval separate from PTO.
  • Retain completion submissions and notification references.
  • Track corrections and responsible next actions.
  • Keep the actual anniversary and account rate records.
  • Separate production, exports and credit valuation.
  • Protect account numbers and customer data.

Save or print this guide from your browser. Keep completed records privately.

Continue your research

Next: Why Get an Independent Solar Assessment?Next: Going Solar: A Homeowner’s Step-by-Step GuideNext: Compare Solar Quotes, Loans, Leases and PPAsNext: Roof, Shade and Battery: Homeowner Planning GuideNext: Solar Permits, Inspections and Utility ApprovalNext: Solar Not Working? A Homeowner’s Next-Step GuideNext: Buying or Selling a Home With Solar PanelsNext: Solar Bills and Export Credits ExplainedNext: How to Choose a Solar InstallerNext: Solar Warranties and Service Disputes: What to KeepNext: Home Solar Maintenance: A Safe Planning GuideNext: Solar Panels and Home Insurance: Questions to AskNext: San Diego Solar Permits and Permission to OperateNext: San Diego Solar Incentives: Verify Your EligibilityNext: Austin Energy Solar Rebate: A Homeowner GuideNext: Phoenix Solar Permits: A Homeowner Approval GuideNext: Community Solar: Check the Subscription Before SigningNext: Home Energy Assessment Before Solar: What to AskNext: Los Angeles Solar Permits and LADWP ApprovalNext: Solar Panel Recycling: Plan for RetirementNext: Solar After a Storm: Safety and Recovery RecordsNext: ComEd Solar Approval and Net Metering: Homeowner GuideNext: Tucson Solar Permits and TEP Approval: Homeowner GuideNext: Denver Solar Permits: A Homeowner Planning GuideNext: Solar Sales Claims: Verify Before You SignNext: Solar System Handover: Records to KeepNext: Sacramento Solar Permits and SMUD: Homeowner GuideNext: OUC Home Solar Approval and Export CreditsNext: Fairfax County Solar Permits and Utility ApprovalNext: Portland Solar Permits and PGE: Homeowner GuideNext: Seattle Solar Approval: City Light Homeowner GuideNext: Las Vegas Solar Permits and NV Energy: Homeowner GuideNext: FPL Solar Approval and Net Metering: Homeowner GuideNext: APS Solar Bills and Export Credits: Homeowner GuideNext: North Carolina Solar Bills: Duke Rider Questions

Keep approval milestones and billing evidence separate

Original homeowner record worksheet; confirm each item with the responsible provider.
ItemEvidence to retainQuestion to resolve
Project identityUtility, address and current equipment listDoes every record concern this configuration?
Construction milestoneWritten preliminary outcome and local recordsWhat remains before operation?
Completion packageSubmitted documents and receipt referenceIs the current package complete?
CorrectionsWritten findings and contractor responseWho owns the next action?
Operating authorizationActual dated PTO noticeDoes it match the installed project?
Billing reviewAccount rate, anniversary and matching energy recordsWhich quantity and period does each line report?

Example: a contractor says the project is approved, but the homeowner has only a preliminary notice. Ask which milestone the statement describes and request the separate operating authorization. A verbal status does not fill a missing document. Do not operate or alter equipment to resolve the paperwork gap.

Example: a proposal presents an annual export-credit value using one retail electricity price. Request a breakdown of direct use, exported quantities, credit use during the year and remaining-credit valuation. Keep the dated account assumptions with the estimate; this worksheet does not calculate a household’s savings.

Example: the final equipment differs from the first drawing. Keep the original and revised versions, ask the installer to explain the change and obtain confirmation about the affected review milestones. A roof image alone cannot establish the installed electrical configuration.

Continue with permit and utility responsibilities, bill reconciliation, handover records and assessment independence. Explore our New Jersey site-survey reference and Solar Survey AI’s evidence methodology; confirm actual homeowner availability, qualifications and scope. A survey does not grant utility authorization or guarantee savings. Connected homeowner monitoring and free remote diagnosis remain coming soon.

About these guides

Published by Solar Survey AI, a commercial survey-services company. Our original decision checklists are recommendations; linked authorities support the referenced facts. We may benefit if you purchase our services. This is not independent certification of our company, a project-specific engineering decision or personal tax/legal advice. Local rules, contracts and site evidence control individual decisions. Reviewed 2026-10-06.

For available survey or inspection services, confirm your project scope and availability with our team. Our planned free homeowner remote diagnosis remains coming soon.

Survey services · Inspection services · Monitoring early access
Book a 15-min call