Residential

OverviewRooftop PV at volumeRoof & dronePlanes measured on the roofAttic & structureRafters recordedElectricalPanel and interconnectionDesign & engineeringModel to stamped set

Commercial & Industrial

OverviewBig roofs, real structureOn-site surveyRoof, structure, switchgearDesign & engineeringPE stampedVisual inspectionModule resolutionThermal inspectionFaults as heatElectroluminescenceCell-level cracks

Utility-Scale

OverviewThousands of acresLiDAR topographyTerrain before earthworkLand surveyingBoundary and topographicConstruction monitoringProgress, measuredThermal & ELEvery string

Across every scale

Site surveysRoof and electrical, one visitPermitting & engineeringStamped plan setsInspectionAerial thermal and ELShading analysisSA, TOF and TSRFSurvey locationsState and metro guides

The platform

Platform overviewPortal, 3D models, live dataFeature guidesWho it serves and how it worksShading analysisMove the sun yourselfCost calculatorWhat bad field data costs you

Sign in

Vanguard AccessInvite only · survey data portalScheduling & DispatchCrewLink · all verticals

Solar reference

Solar questions answeredResidential, commercial and utility-scaleSurvey methodologySources, measurements and limitsCompany factsOfficial services and capabilities

Field Notes · build vs. buy

What a survey really costsPart 01 · the full modelUtilization is the whole gamePart 02 · a real TuesdayThe break-even headcountWhen hiring pays offTwo technicians, two roofsVariance, measuredThe hybrid crewIn-house plus outsourced

Field Notes · reference

Site survey checklistBuilt backwards from reworkHow long a survey takesHour by hourDo panels need a permit?What goes in the packageStorage site surveysThe capture listCompare survey vendorsQuestions to ask any vendor

Company

All servicesAll Field NotesAboutBook a 15-min call

Home / Homeowners

Homeowner education · reviewed 2026-10-06

Texas Solar Contracts: Registration and Cancellation Checks

Check Texas solar sales registrations, installer identity, contract cancellation terms and dated disclosure notices before signing a home solar agreement.

Make the decision with evidence
  1. 01Ask the right questions
  2. 02Verify the assumptions
  3. 03Keep the records

Education, not a savings or approval guarantee.

Use this guide

Choose the questions relevant to your situation. Expand each answer, save the checklist and request written clarification where evidence is missing.

Questions homeowners ask

Which Texas solar agreements does this program cover?

TDLR describes covered residential system sales and leases signed after the Act took effect September 1, 2025. It lists exclusions for nonresidential property, certain multifamily buildings and specified small or limited-use systems. Confirm the actual agreement and property before applying these provisions.

Source: TDLR: covered residential solar agreements. Reviewed 2026-10-06.

Which sales registrations should I check now?

TDLR states that residential solar retailer and salesperson registrations are required beginning September 1, 2026. Identify both the business selling or leasing the system and the person conducting the sale; check the applicable records rather than relying only on an installer’s credential.

Source: TDLR: contract provisions and effective dates. Reviewed 2026-10-06.

Can an electrical contractor claim an exemption?

TDLR describes registration exemptions for electrical contractors and their employee salespeople. A third-party sales representative is not covered by the employee exemption. Ask which relationship applies; the contractor’s exemption does not remove the statutory contract provisions and cancellation requirements described by TDLR.

Source: TDLR: registration exemptions, searches and business days. Reviewed 2026-10-06.

Where do I verify the retailer and salesperson?

Use the TDLR license search linked from its knowledge base. Record the exact names, registration category, current status and review date privately. If no matching record appears, seek clarification about the identity or applicable exemption before treating the offer as verified.

Source: TDLR: registration exemptions, searches and business days. Reviewed 2026-10-06.

What installer identity belongs in the agreement?

For covered sales or leases involving installation, TDLR describes a requirement for a licensed electrical contractor and a conspicuous contractor name and license number. An agreement may instead list contractors from which one must be selected. Ask who will actually perform the work.

Source: TDLR: contract provisions and effective dates. Reviewed 2026-10-06.

What cancellation period does TDLR describe?

For covered agreements, TDLR describes written cancellation notice by the fifth business day after the buyer or lessee executes the agreement, without penalty or further obligation. The agreement must state the last calendar date and a mailing or email address for notice.

Source: TDLR: contract provisions and effective dates. Reviewed 2026-10-06.

Does business day mean any calendar day?

No. TDLR’s knowledge base excludes Saturdays, Sundays and the specified state and federal holidays. Read the printed deadline and ask promptly about any discrepancy. This guide does not calculate your personal deadline or determine whether a particular notice was timely.

Source: TDLR: registration exemptions, searches and business days. Reviewed 2026-10-06.

Has Texas delayed every solar consumer requirement?

No. As reviewed October 6, 2026, TDLR’s notice temporarily suspends enforcement of administrative rules §71.41 on contract disclosures and §71.43 on educational materials until November 1, 2026. Read that narrowly; it is not a blanket delay of the program.

Source: TDLR: current disclosure enforcement notice. Reviewed 2026-10-06.

How should I review a separate loan?

Retain the financing agreement separately and ask the lender and contracting business to explain cancellation conditions and any linked obligations in writing. Do not assume this checklist cancels every financing arrangement. Obtain prompt qualified advice for a disputed deadline, payment or contract interpretation.

Does checking a registration settle permits or bill credits?

No. Track project approvals and electricity-plan terms separately. Ask which authority and serving utility govern your address and which party supplies each actual record. An official sales registration is not project authorization, an equipment assessment or a guarantee of bill savings.

How can a separate assessment help before committing?

Use an agreed assessment scope to investigate accessible site evidence and unresolved project questions. Check qualifications and payment or referral relationships; third-party does not automatically mean independent. Confirm Solar Survey AI’s available survey or inspection scope. Homeowner monitoring connections and planned remote diagnosis remain coming soon.

Your decision checklist

  • Identify the agreement type, property and execution date.
  • Name the retailer, salesperson and proposed electrical contractor.
  • Check applicable registrations or request a documented exemption explanation.
  • Locate the stated cancellation date and notice address before signing.
  • Keep the contract, financing terms and private dated correspondence.
  • Separate credentials, permits, utility approval and bill assumptions.
  • Seek prompt qualified help when a deadline or obligation is disputed.

Save or print this guide from your browser. Keep completed records privately.

Make the contract review traceable

Original private contract-review worksheet; confirm legal questions with the appropriate professional.
Review itemEvidence to retain
Covered arrangementSale or lease, property type and dated signed agreement
Sales rolesExact business and person names; official record or exemption explanation
Installation roleNamed contractor and license information in the agreement
Cancellation instructionsPrinted last date, written-notice destination and retained correspondence
FinancingSeparate lender, agreement and written explanation of linked obligations
Project deliveryPermit, inspection, utility approval and responsible parties

Example: the seller says “our installer is licensed,” but the proposal does not identify the sales business and person clearly. Ask for those separate roles and verify the relevant records or exemption explanation. An installer credential alone does not resolve that information gap.

Example: after signing, a homeowner becomes concerned about the stated cancellation deadline. Preserve the agreement and contact an appropriate adviser promptly about notice and timing. Do not wait for an assessment appointment or a routine service complaint to resolve a time-sensitive contract question.

Reviewed October 6, 2026 against the linked TDLR pages. The worksheet and examples are editorial aids, not a determination about an individual agreement. Recheck the current notice before relying on a future enforcement date. Keep signatures, account details and monitoring credentials private. Continue with installer selection, quote and contract comparisons, Oncor and retail electricity records where applicable, and service responsibilities. Review Solar Survey AI’s evidence methodology and confirm available inspection scope.

Continue your research

Next: Why Get an Independent Solar Assessment?Next: Going Solar: A Homeowner’s Step-by-Step GuideNext: Compare Solar Quotes, Loans, Leases and PPAsNext: Roof, Shade and Battery: Homeowner Planning GuideNext: Solar Permits, Inspections and Utility ApprovalNext: Solar Not Working? A Homeowner’s Next-Step GuideNext: Buying or Selling a Home With Solar PanelsNext: Solar Bills and Export Credits ExplainedNext: How to Choose a Solar InstallerNext: Solar Warranties and Service Disputes: What to KeepNext: Home Solar Maintenance: A Safe Planning GuideNext: Solar Panels and Home Insurance: Questions to AskNext: San Diego Solar Permits and Permission to OperateNext: San Diego Solar Incentives: Verify Your EligibilityNext: Austin Energy Solar Rebate: A Homeowner GuideNext: Phoenix Solar Permits: A Homeowner Approval GuideNext: Community Solar: Check the Subscription Before SigningNext: Home Energy Assessment Before Solar: What to AskNext: Los Angeles Solar Permits and LADWP ApprovalNext: Solar Panel Recycling: Plan for RetirementNext: Solar After a Storm: Safety and Recovery RecordsNext: ComEd Solar Approval and Net Metering: Homeowner GuideNext: Tucson Solar Permits and TEP Approval: Homeowner GuideNext: Denver Solar Permits: A Homeowner Planning GuideNext: Solar Sales Claims: Verify Before You SignNext: Solar System Handover: Records to KeepNext: Sacramento Solar Permits and SMUD: Homeowner GuideNext: OUC Home Solar Approval and Export CreditsNext: Fairfax County Solar Permits and Utility ApprovalNext: Portland Solar Permits and PGE: Homeowner GuideNext: Seattle Solar Approval: City Light Homeowner GuideNext: Las Vegas Solar Permits and NV Energy: Homeowner GuideNext: FPL Solar Approval and Net Metering: Homeowner GuideNext: APS Solar Bills and Export Credits: Homeowner GuideNext: North Carolina Solar Bills: Duke Rider QuestionsNext: PSE&G Solar Approval and Bills: Homeowner GuideNext: Minnesota Solar Approval and Credits: Homeowner GuideNext: Maryland Solar Credits: Banking and Bill ChecklistNext: New York Rooftop Solar: Provider and Contract ChecksNext: Boston Solar Permits: Homeowner Document ChecklistNext: Connecticut Solar Tariffs: RRES Homeowner ChecklistNext: Ameren Missouri Solar: Bills and Approval RecordsNext: Pennsylvania Solar Bills: Supplier and Credit ChecksNext: PNM Solar Bills: Energy Banks and Agreement ChecksNext: Maine Solar Credits: Expiration and Bill ChecklistNext: Georgia Power Solar: Bills and Approval ChecksNext: DTE Solar Bills: Outflow and Credit Bank ChecksNext: PSE Solar: Net Metering and Program Record ChecksNext: Dominion SC Solar Choice: Bill and Meter RecordsNext: National Grid MA Solar: Credit and Transfer RecordsNext: SDG&E Solar Bills: Export Pricing Record ChecksNext: CPS Energy Solar: Meter and Commissioning RecordsNext: SRP Solar Plans: Demand and Export Record ChecksNext: Xcel Colorado Solar: Bank Election and Bill RecordsNext: Evergy Home Solar: Territory and Meter Record ChecksNext: We Energies Solar: Meter Configuration and Bill ChecksNext: Utah Solar: Rocky Mountain Power Net Billing RecordsNext: AEP Ohio Solar: Supplier and Credit RecordsNext: Entergy Louisiana Solar: Rider and Meter RecordsNext: Indiana Solar: Tariff and Complaint RecordsNext: Oncor Solar: REP and Meter RecordsNext: Entergy Arkansas Solar Credit RecordsNext: OG&E Oklahoma Solar: Meter and Bill RecordsNext: OPPD Solar Bills: Net Meter and Approval RecordsNext: Hawaiian Electric Solar: Program and Credit RecordsNext: NV Energy North Solar: Interval and Approval RecordsNext: SMUD Battery Program: Consent and Enrollment RecordsNext: PG&E Solar Bills: Plan and True-Up Record ChecksNext: SCE Solar Credits: Settlement and Bill RecordsNext: LADWP Solar Credits: Meter and Account RecordsNext: Nashville NES Solar: Program and Approval RecordsNext: PSO Oklahoma Solar: Plans and Approval RecordsNext: Ameren Illinois Solar Credits: Keep the Election RecordNext: Dallas Solar Permits: Review Pathways and RecordsNext: DC Solar SRECs: Certification and Ownership RecordsNext: Florida Solar Contractors: License and Business Checks

About these guides

Published by Solar Survey AI, a commercial survey-services company. Our original decision checklists are recommendations; linked authorities support the referenced facts. We may benefit if you purchase our services. This is not independent certification of our company, a project-specific engineering decision or personal tax/legal advice. Local rules, contracts and site evidence control individual decisions. Reviewed 2026-10-06.

For available survey or inspection services, confirm your project scope and availability with our team. Our planned free homeowner remote diagnosis remains coming soon.

Survey services · Inspection services · Monitoring early access
Book a 15-min call