Residential

OverviewRooftop PV at volumeRoof & dronePlanes measured on the roofAttic & structureRafters recordedElectricalPanel and interconnectionDesign & engineeringModel to stamped set

Commercial & Industrial

OverviewBig roofs, real structureOn-site surveyRoof, structure, switchgearDesign & engineeringPE stampedVisual inspectionModule resolutionThermal inspectionFaults as heatElectroluminescenceCell-level cracks

Utility-Scale

OverviewThousands of acresLiDAR topographyTerrain before earthworkLand surveyingBoundary and topographicConstruction monitoringProgress, measuredThermal & ELEvery string

Across every scale

Site surveysRoof and electrical, one visitPermitting & engineeringStamped plan setsInspectionAerial thermal and ELShading analysisSA, TOF and TSRFSurvey locationsState and metro guides

The platform

Platform overviewPortal, 3D models, live dataFeature guidesWho it serves and how it worksShading analysisMove the sun yourselfCost calculatorWhat bad field data costs you

Sign in

Vanguard AccessInvite only · survey data portalScheduling & DispatchCrewLink · all verticals

Solar reference

Solar questions answeredResidential, commercial and utility-scaleSurvey methodologySources, measurements and limitsCompany factsOfficial services and capabilities

Field Notes · build vs. buy

What a survey really costsPart 01 · the full modelUtilization is the whole gamePart 02 · a real TuesdayThe break-even headcountWhen hiring pays offTwo technicians, two roofsVariance, measuredThe hybrid crewIn-house plus outsourced

Field Notes · reference

Site survey checklistBuilt backwards from reworkHow long a survey takesHour by hourDo panels need a permit?What goes in the packageStorage site surveysThe capture listCompare survey vendorsQuestions to ask any vendor

Company

All servicesAll Field NotesAboutBook a 15-min call

Home / Homeowners

Homeowner education · reviewed 2026-10-07

SMUD Solar Bills: Credit and Settlement Records

Read a SMUD solar bill by confirming SSR or legacy NEM, export-credit units, billing options and settlement records before comparing costs or a home sale.

Make the decision with evidence
  1. 01Ask the right questions
  2. 02Verify the assumptions
  3. 03Keep the records

Education, not a savings or approval guarantee.

Use this guide

Choose the questions relevant to your situation. Expand each answer, save the checklist and request written clarification where evidence is missing.

Questions homeowners ask

Does SSR replace the underlying residential Time-of-Day rate?

SMUD describes Solar and Storage Rate as an additional component; residential customers remain on the Time-of-Day (5–8 p.m.) rate. Keep retail purchases and solar export compensation separate in a comparison.

Source: SMUD: Solar and Storage Rate; reviewed October 7, 2026. Reviewed 2026-10-07.

Which export price should I date-check on an SSR proposal?

SMUD’s April 27 announcement raised SSR export compensation to 9.6 cents per kWh effective June 1, 2026. This is an export rate, not the household’s total retail price. Confirm current account terms before relying on it.

Source: SMUD: April 27, 2026 export-rate announcement, effective June 1. Reviewed 2026-10-07.

What do SSR export credits offset?

SMUD’s FAQ says credits offset electricity usage charges, with remaining credit carried to subsequent bills. Do not assume that a credit pays every charge or is an unrestricted cash payout.

Source: SMUD: Solar and Storage Rate; reviewed October 7, 2026. Reviewed 2026-10-07.

Why might two legacy NEM bills look different?

SMUD provides separate monthly and annual NEM payment examples. Its explanation distinguishes monthly billing from the twelve-month settlement cycle and allows usage-payment choices. Confirm the actual account option and settlement dates.

Source: SMUD: understanding your bill and 2026 solar samples. Reviewed 2026-10-07.

Are NEM retail-valued credits and annual surplus kWh the same record?

No. SMUD describes retail-valued credits against usage within the settlement year, then an annual net-surplus calculation. Its listed surplus choices include payment, kWh rollover or opting out. Retain the actual election and outcome separately.

Source: SMUD: solar customers and NEM settlement questions. Reviewed 2026-10-07.

Can I copy the seller’s NEM settlement into a buyer’s budget?

SMUD says customers moving into solar homes on or after March 1, 2022 are placed on SSR. Obtain the buyer’s actual rate confirmation; past seller bills do not establish the new account’s treatment.

Source: SMUD: solar customers and NEM settlement questions. Reviewed 2026-10-07.

What should a useful billing question include?

Name the bill period, confirmed rate, disputed line, units, relevant readings and expected treatment. Attach records through SMUD’s authorized channel and ask for a written explanation. Keep a generation-app total separate from utility imports and exports, and mark missing evidence unknown.

Your decision checklist

  • Confirm the serving utility and actual account rate.
  • Record installation approval and move-in dates where relevant.
  • Match bill periods, units and utility measurements.
  • Date-check the export rate rather than the whole retail price.
  • Separate usage credits, carried balance and annual surplus election.
  • Confirm payment option and settlement dates for legacy NEM.
  • Get a written answer before using a disputed amount in a budget.

Save or print this guide from your browser. Keep completed records privately.

Follow the account and credit units

Original private bill-review organizer; not a tariff election, payment request or savings forecast.
RecordEvidence to keep
Account and rateSMUD confirmation of SSR or NEM and the relevant effective dates
Bill periodStart/end dates, number of days and payment option
Measured energyUtility imports/exports and separate app production, with units
Credit calculationDated export basis, credited usage charges and any unresolved line
Carry-forward balancePrior balance, applied credit and remaining balance with labels
NEM annual outcomeSettlement dates, surplus kWh, actual election and confirmed outcome
Open questionDated inquiry, utility response, unresolved evidence and next review

Fictional arithmetic: an SSR comparison uses 100 kWh of hypothetical grid exports and a verified 9.6-cent export assumption. Multiplying 100 by $0.096 produces $9.60. This isolates one illustrative export component. It does not calculate an actual bill, retail purchases, remaining charges, carried credit, battery costs or household savings. Confirm the applicable period and account calculation rather than converting all solar generation into exports.

Fictional example: a buyer receives the seller’s legacy NEM annual bill and a proposal that uses that bill’s settlement treatment for the buyer. The buyer requests SMUD’s account-rate confirmation, dates and applicable credit rules. The buyer retains the seller’s history as evidence of past operation but prepares the new budget from the actual buyer account terms. No assumed transfer of a legacy billing arrangement is treated as accepted.

Begin with the account, then follow the units. A kWh energy entry, a dollar credit, a carried dollar balance and a payment received answer different questions. Label each field rather than collapsing them into “solar savings.” Keep loan, lease, PPA or service payments in a separate household cost comparison. If a line is unexplained, record the uncertainty and the person responsible for resolving it.

Reviewed October 7, 2026 against SMUD’s SSR explanation, solar-customer settlement guidance, 2026 bill samples and June 2026 export-rate announcement. The sample bill is explanatory; SMUD cautions that actual line items can differ. This is SMUD-specific guidance, not a statewide tariff. Account confirmation and current official terms control individual questions. We make no future rate, payment, eligibility or savings promise.

Equipment changes, battery incentive participation and home moves can require a separate rate review. Retain the actual proposed change and ask SMUD about its account treatment before authorizing work. This bill organizer does not grant interconnection approval, enroll a battery program or change the household’s rate or payment election.

Continue with electricity measurement basics, SMUD battery consent and incentive records, Sacramento permit and SMUD operating milestones and solar home transfer records. A City permit, utility operating authorization, billing setup and participation agreement are distinct records.

Solar Survey AI’s evidence methodology supports separating observations from assumptions. Confirm available inspection scope, qualifications, fees, conflicts and access for a physical system question. We do not decide SMUD billing disputes or promise an account adjustment. Third-party does not automatically mean independent. Homeowner monitoring connections and planned free remote diagnosis remain coming soon. The organizer and fictional examples are editorial aids; share account records privately through an authorized route.

About these guides

Published by Solar Survey AI, a commercial survey-services company. Our original decision checklists are recommendations; linked authorities support the referenced facts. We may benefit if you purchase our services. This is not independent certification of our company, a project-specific engineering decision or personal tax/legal advice. Local rules, contracts and site evidence control individual decisions. Reviewed 2026-10-07.

For available survey or inspection services, confirm your project scope and availability with our team. Our planned free homeowner remote diagnosis remains coming soon.

Survey services · Inspection services · Monitoring early access