Residential

OverviewRooftop PV at volumeRoof & dronePlanes measured on the roofAttic & structureRafters recordedElectricalPanel and interconnectionDesign & engineeringModel to stamped set

Commercial & Industrial

OverviewBig roofs, real structureOn-site surveyRoof, structure, switchgearDesign & engineeringPE stampedVisual inspectionModule resolutionThermal inspectionFaults as heatElectroluminescenceCell-level cracks

Utility-Scale

OverviewThousands of acresLiDAR topographyTerrain before earthworkLand surveyingBoundary and topographicConstruction monitoringProgress, measuredThermal & ELEvery string

Across every scale

Site surveysRoof and electrical, one visitPermitting & engineeringStamped plan setsInspectionAerial thermal and ELShading analysisSA, TOF and TSRFSurvey locationsState and metro guides

The platform

Platform overviewPortal, 3D models, live dataFeature guidesWho it serves and how it worksShading analysisMove the sun yourselfCost calculatorWhat bad field data costs you

Sign in

Vanguard AccessInvite only · survey data portalScheduling & DispatchCrewLink · all verticals

Solar reference

Solar questions answeredResidential, commercial and utility-scaleSurvey methodologySources, measurements and limitsCompany factsOfficial services and capabilities

Field Notes · build vs. buy

What a survey really costsPart 01 · the full modelUtilization is the whole gamePart 02 · a real TuesdayThe break-even headcountWhen hiring pays offTwo technicians, two roofsVariance, measuredThe hybrid crewIn-house plus outsourced

Field Notes · reference

Site survey checklistBuilt backwards from reworkHow long a survey takesHour by hourDo panels need a permit?What goes in the packageStorage site surveysThe capture listCompare survey vendorsQuestions to ask any vendor

Company

All servicesAll Field NotesAboutBook a 15-min call

Home / Homeowners

Homeowner education · reviewed 2026-10-06

Philadelphia Solar Permits: EZ Route and Project Records

Check Philadelphia solar EZ permit conditions, current forms, PECO application evidence and licensed inspection records before committing to a rooftop project.

Make the decision with evidence
  1. 01Ask the right questions
  2. 02Verify the assumptions
  3. 03Keep the records

Education, not a savings or approval guarantee.

Use this guide

Choose the questions relevant to your situation. Expand each answer, save the checklist and request written clarification where evidence is missing.

Questions homeowners ask

Does EZ mean no permit is needed?

Qualifying EZ projects still need an Electrical Permit. L&I says other solar projects also require a Building Permit and plans. Have the applicant document the route.

Source: Philadelphia L&I: solar-panel permit process. Reviewed 2026-10-06.

Is a small array enough to establish EZ eligibility?

No. The July 2026 standard limits the route to rooftop systems on one- or two-family dwellings, no more than 10 kW AC, and all its other conditions. Capacity alone does not establish eligibility; ask the contractor to evaluate the complete current form.

Source: Philadelphia: current solar EZ standard, revised July 2026. Reviewed 2026-10-06.

Which roof or battery details need an early route check?

The current standard excludes storage systems and slopes greater than 2:12. It also addresses engineered trusses, including a professional-engineer-letter exception. Share existing roof and equipment records with the qualified applicant; this guide cannot establish structural suitability or the permit route remotely.

Source: Philadelphia: current solar EZ standard, revised July 2026. Reviewed 2026-10-06.

What PECO record belongs in the permit packet?

L&I requests an interconnection dashboard screenshot showing project location, capacity, installation type and current status. Keep submission evidence separate from later utility operating authorization.

Source: Philadelphia L&I: solar-panel permit process. Reviewed 2026-10-06.

Who performs the required electrical inspections?

The owner or agent must hire a licensed electrical inspection agency, according to L&I. A separate site assessment does not automatically fulfill this regulated role.

Source: Philadelphia L&I: solar-panel permit process. Reviewed 2026-10-06.

What happens after the required inspections?

L&I describes inspection certification and its Certificate of Approval after successful required inspections. Retain these records separately from any outstanding utility authorization.

Source: Philadelphia L&I: solar-panel permit process. Reviewed 2026-10-06.

How can I avoid using an outdated EZ form?

Use the city’s official document library, which lists the solar standard released August 6, 2026. Record the version supplied with your application and have the applicant resolve any inconsistent instructions with L&I. An older downloaded form is not evidence of current acceptance.

Source: Philadelphia: official EZ standards document library. Reviewed 2026-10-06.

How should I organize historic-property or other unresolved questions?

Flag the property status and any proposed change before committing to a route. Ask the applicant and L&I to identify needed review and obtain a written answer. Keep unresolved status visible instead of treating an unanswered question as approval. This editorial checklist does not determine historic, zoning or engineering eligibility.

Your decision checklist

  • Confirm the city jurisdiction and legal project address.
  • Have the qualified applicant evaluate the full current EZ standard.
  • Flag roof framing, slope, storage and historic-status questions early.
  • Keep the PECO application evidence with the permit packet.
  • Identify the required licensed electrical inspection agency.
  • Track city closeout and utility operating authorization separately.
  • Retain current forms, responses and outstanding questions privately.

Save or print this guide from your browser. Keep completed records privately.

Keep the route and approval evidence together

Original private project organizer; not a permit application, engineering finding or inspection certificate.
DecisionRecord to request
Project identityAddress, responsible applicant and existing property records
Route basisCurrent standard, equipment scope and unanswered conditions
Roof and storageExisting framing records, proposed batteries and qualified review
Utility applicationSubmitted-project dashboard evidence and later milestones
Inspection roleNamed licensed agency and required certification record
CloseoutCity certificate, utility response and outstanding corrections

Example: a quote describes an EZ rooftop installation, while an equipment addendum includes a battery. Ask the applicant to reconcile the complete scope with the current standard before carrying the original route assumption into the schedule. Do not remove an item from the application merely to make the paperwork appear eligible.

Example: a homeowner has a screenshot confirming a utility application and expects the system to be ready for use. Ask which city and utility milestones remain. Keep actual decisions in the folder rather than relabeling a submission screenshot as final authorization.

Reviewed October 6, 2026. The linked standard is revised July 2026 and appears in the official library as released August 6, 2026. Follow current L&I instructions and obtain project-specific answers from the qualified applicant. We do not quote fees, promise processing times or determine code compliance. The worksheet and hypothetical examples are editorial aids. Store addresses, signatures and utility account records privately.

Continue with permit and utility milestones, Pennsylvania supplier and credit records and roof and battery planning questions. Explore Solar Survey AI’s evidence methodology and confirm an available survey scope for your project. Our optional services do not replace the city’s required licensed electrical inspection agency or establish its authorization. Homeowner monitoring connections and planned remote diagnosis remain coming soon.

Continue your research

Next: Why Get an Independent Solar Assessment?Next: Going Solar: A Homeowner’s Step-by-Step GuideNext: Compare Solar Quotes, Loans, Leases and PPAsNext: Roof, Shade and Battery: Homeowner Planning GuideNext: Solar Permits, Inspections and Utility ApprovalNext: Solar Not Working? A Homeowner’s Next-Step GuideNext: Buying or Selling a Home With Solar PanelsNext: Solar Bills and Export Credits ExplainedNext: How to Choose a Solar InstallerNext: Solar Warranties and Service Disputes: What to KeepNext: Home Solar Maintenance: A Safe Planning GuideNext: Solar Panels and Home Insurance: Questions to AskNext: San Diego Solar Permits and Permission to OperateNext: San Diego Solar Incentives: Verify Your EligibilityNext: Austin Energy Solar Rebate: A Homeowner GuideNext: Phoenix Solar Permits: A Homeowner Approval GuideNext: Community Solar: Check the Subscription Before SigningNext: Home Energy Assessment Before Solar: What to AskNext: Los Angeles Solar Permits and LADWP ApprovalNext: Solar Panel Recycling: Plan for RetirementNext: Solar After a Storm: Safety and Recovery RecordsNext: ComEd Solar Approval and Net Metering: Homeowner GuideNext: Tucson Solar Permits and TEP Approval: Homeowner GuideNext: Denver Solar Permits: A Homeowner Planning GuideNext: Solar Sales Claims: Verify Before You SignNext: Solar System Handover: Records to KeepNext: Sacramento Solar Permits and SMUD: Homeowner GuideNext: OUC Home Solar Approval and Export CreditsNext: Fairfax County Solar Permits and Utility ApprovalNext: Portland Solar Permits and PGE: Homeowner GuideNext: Seattle Solar Approval: City Light Homeowner GuideNext: Las Vegas Solar Permits and NV Energy: Homeowner GuideNext: FPL Solar Approval and Net Metering: Homeowner GuideNext: APS Solar Bills and Export Credits: Homeowner GuideNext: North Carolina Solar Bills: Duke Rider QuestionsNext: PSE&G Solar Approval and Bills: Homeowner GuideNext: Minnesota Solar Approval and Credits: Homeowner GuideNext: Maryland Solar Credits: Banking and Bill ChecklistNext: New York Rooftop Solar: Provider and Contract ChecksNext: Boston Solar Permits: Homeowner Document ChecklistNext: Connecticut Solar Tariffs: RRES Homeowner ChecklistNext: Ameren Missouri Solar: Bills and Approval RecordsNext: Pennsylvania Solar Bills: Supplier and Credit ChecksNext: PNM Solar Bills: Energy Banks and Agreement ChecksNext: Maine Solar Credits: Expiration and Bill ChecklistNext: Georgia Power Solar: Bills and Approval ChecksNext: DTE Solar Bills: Outflow and Credit Bank ChecksNext: PSE Solar: Net Metering and Program Record ChecksNext: Dominion SC Solar Choice: Bill and Meter RecordsNext: National Grid MA Solar: Credit and Transfer RecordsNext: SDG&E Solar Bills: Export Pricing Record ChecksNext: CPS Energy Solar: Meter and Commissioning RecordsNext: SRP Solar Plans: Demand and Export Record ChecksNext: Xcel Colorado Solar: Bank Election and Bill RecordsNext: Evergy Home Solar: Territory and Meter Record ChecksNext: We Energies Solar: Meter Configuration and Bill ChecksNext: Utah Solar: Rocky Mountain Power Net Billing RecordsNext: AEP Ohio Solar: Supplier and Credit RecordsNext: Entergy Louisiana Solar: Rider and Meter RecordsNext: Indiana Solar: Tariff and Complaint RecordsNext: Oncor Solar: REP and Meter RecordsNext: Entergy Arkansas Solar Credit RecordsNext: OG&E Oklahoma Solar: Meter and Bill RecordsNext: OPPD Solar Bills: Net Meter and Approval RecordsNext: Hawaiian Electric Solar: Program and Credit RecordsNext: NV Energy North Solar: Interval and Approval RecordsNext: SMUD Battery Program: Consent and Enrollment RecordsNext: PG&E Solar Bills: Plan and True-Up Record ChecksNext: SCE Solar Credits: Settlement and Bill RecordsNext: LADWP Solar Credits: Meter and Account RecordsNext: Nashville NES Solar: Program and Approval RecordsNext: PSO Oklahoma Solar: Plans and Approval RecordsNext: Ameren Illinois Solar Credits: Keep the Election RecordNext: Dallas Solar Permits: Review Pathways and RecordsNext: DC Solar SRECs: Certification and Ownership RecordsNext: Florida Solar Contractors: License and Business ChecksNext: Texas Solar Contracts: Registration and Cancellation ChecksNext: California Solar: Consumer Documents Before SigningNext: Illinois Shines: Records for a Solar Home TransferNext: Enphase Solar: Maintainer and Data Access Checks

About these guides

Published by Solar Survey AI, a commercial survey-services company. Our original decision checklists are recommendations; linked authorities support the referenced facts. We may benefit if you purchase our services. This is not independent certification of our company, a project-specific engineering decision or personal tax/legal advice. Local rules, contracts and site evidence control individual decisions. Reviewed 2026-10-06.

For available survey or inspection services, confirm your project scope and availability with our team. Our planned free homeowner remote diagnosis remains coming soon.

Survey services · Inspection services · Monitoring early access
Book a 15-min call