Residential

OverviewRooftop PV at volumeRoof & dronePlanes measured on the roofAttic & structureRafters recordedElectricalPanel and interconnectionDesign & engineeringModel to stamped set

Commercial & Industrial

OverviewBig roofs, real structureOn-site surveyRoof, structure, switchgearDesign & engineeringPE stampedVisual inspectionModule resolutionThermal inspectionFaults as heatElectroluminescenceCell-level cracks

Utility-Scale

OverviewThousands of acresLiDAR topographyTerrain before earthworkLand surveyingBoundary and topographicConstruction monitoringProgress, measuredThermal & ELEvery string

Across every scale

Site surveysRoof and electrical, one visitPermitting & engineeringStamped plan setsInspectionAerial thermal and ELShading analysisSA, TOF and TSRFSurvey locationsState and metro guides

The platform

Platform overviewPortal, 3D models, live dataShading analysisMove the sun yourselfCost calculatorWhat bad field data costs you

Sign in

Vanguard AccessInvite only · survey data portalScheduling & DispatchCrewLink · all verticals

Field Notes · build vs. buy

What a survey really costsPart 01 · the full modelUtilization is the whole gamePart 02 · a real TuesdayThe break-even headcountWhen hiring pays offTwo technicians, two roofsVariance, measuredThe hybrid crewIn-house plus outsourced

Field Notes · reference

Site survey checklistBuilt backwards from reworkHow long a survey takesHour by hourDo panels need a permit?What goes in the packageStorage site surveysThe capture listCompare survey vendorsQuestions to ask any vendor

Company

All servicesAll Field NotesAboutBook a 15-min call

Home  /  Field Notes  /  Survey tools

Field Notes · Residential

Solar site survey tools: the field kit, by what it measures

Not a shopping list. Every tool on a survey truck earns its place by measuring one thing and preventing one expensive error. This is the kit, organised that way.

Kit listResidential8 min read
Short answer

A working solar site survey kit covers nine jobs: a tape and laser measure for plane dimensions, a pitch gauge or inclinometer for slope, a compass for azimuth, a shade or horizon tool for each array area, an attic kit (light and tape) for rafter size and spacing, electrical PPE with a meter and a panel photo checklist, a ladder with fall protection, a drone for measurement photos, and a phone or tablet to capture and review it all before leaving the site.

Organise the kit by error, not by aisle

Most lists of solar site survey equipment read like a hardware store receipt: what to buy, not why it is on the truck. The better test is the one the office applies later: which number on the plan set came from this tool, and what does it cost if that number is wrong?

Seen that way, every tool maps to a specific downstream reader. The designer lives on plane dimensions, pitch, azimuth and shade; the engineer on rafter size, spacing and span; the utility and permit office on the panel. A tool that feeds none of them is weight. A missing tool is a return visit.

For the full capture list rather than the kit, see the site survey checklist, built backwards from rework.

The kit board: what each tool actually measures

Hover or tap a tool. The house lights up where that tool does its work, and the readout names the error it exists to prevent.

Tape & laser measure

MeasuresPlane lengths at eave, rake and ridge; obstruction offsets; attic spacing.

Error it preventsA layout drawn on traced geometry that loses a row of modules on install day.

ATTIC LENGTH PITCH N AZIMUTH SHADE SERVICE ACCESS DRONE
Roof geometry

Tape, laser and pitch gauge: the numbers the layout sits on

Tape measure and laser measure

Measures: plane length at the eave, rake and ridge, and the offset from each obstruction to the nearest edge. Prevents: a layout drawn on traced geometry. Overhangs, gutters and parallax hide the true plane edge in imagery, and a plane a foot shorter than the drawing can lose a row of modules.

Carry both. A long tape run from eave to ridge on the plane itself is the reference you trust, and it doubles as a known scale for any photo-based model. A laser measure is faster for eave-to-eave runs from the ground or across a plane you cannot safely walk. When the two disagree, re-shoot before you climb down.

Pitch gauge or digital inclinometer

Measures: the slope of each plane. Prevents: a production estimate and a wind and snow check built on the wrong angle. Read the gauge seated on the plane, not on a ridge cap or a raised shingle edge, and read every plane: additions and dormers rarely match the main roof.

Illustrative: pitch is recorded as rise over 12. A 5/12 roof is about 22.6°; a 6/12 roof is about 26.6°. One step on the gauge is roughly four degrees of tilt, which is enough to move the production figure and can change the inputs to the engineer's wind and snow check.

Magnetic-base pitch gauge standing on an asphalt shingle roof plane, red needle reading the slope in degrees
Field capture · Pitch gauge · On the planeMagnetic-base gauge seated on the shingles, needle read in degrees.
Pitch gauge on a shingle roof beside a roof vent flashing, with a neighbouring house and trees behind
Field capture · Pitch gauge · In contextWide shot keeps the vent and the plane in frame with the reading.
Tape measure stretched up an asphalt shingle roof plane from the eave toward the ridge
Field capture · Tape · Plane lengthOne continuous run on the plane: the number the model is checked against.
Orientation and shade

Compass and shade tool: where the sun actually lands

Compass or calibrated orientation tool

Measures: the azimuth each plane faces. Prevents: a production estimate pointed the wrong way. Two things trip technicians up. First, a magnetic compass reads magnetic north, while design tools generally expect true north. The difference, magnetic declination, depends on where you are and can run past ten degrees in parts of the United States. NOAA publishes a declination calculator; note which reference your reading uses. Second, a phone compass is easily pulled off by flashing, vents, a metal roof or the service panel. Take the reading away from metal and sanity-check it against the street grid.

Shade or horizon tool

Measures: the obstructions on the horizon, as seen from each array area. Prevents: a shade loss that nobody saw coming. The rule that matters is location, not the device: capture from each proposed array area, not once from the middle of the roof. A tree that shades the west plane can be invisible from the east one. Note whether each tree is on the property, and flag near obstructions that only matter in winter, like a chimney or a taller neighbour. Our shading analysis page shows what that capture becomes.

Attic and structure

Attic kit: a light, a tape and a way to read the framing

Measures: rafter or truss depth and width, on-centre spacing, span, and sheathing type. Prevents: a structural letter written against assumed framing. The engineer cannot see through the roof, and neither can a drone. This is the one input that has to be read by hand.

The kit is small: a headlamp and a handheld light, a tape, knee pads, and a board to walk on across the joists. Measure the actual depth of the member, hooked to the underside of the sheathing, because a nominal 2x6 is about 5½ inches deep and older framing does not always match modern lumber. Lay the tape across several bays to confirm spacing, since 16 and 24 inches on centre look similar in a dim attic and change the attachment layout. Photograph anything that limits attachment: ducts, an air handler, junction boxes, sagging or damaged members. See the attic and structure page for how we record it.

Tape measure hooked over the edge of an attic framing member, with insulated flexible ducting behind
Field capture · Attic · Member depthTape hooked on the member itself, beside the ductwork.
Tape measure laid across attic framing over insulation, below flexible ducting, to check on-centre spacing
Field capture · Attic · SpacingTape laid across the bays to confirm on-centre spacing.
Attic with sheathing, rafters, flexible ducting, an air handler and junction boxes
Field capture · Attic · ObstructionsDucting, air handler and boxes that limit attachment points.
Electrical service

Electrical PPE, a meter and a photo checklist

Measures: the main breaker and busbar ratings, open slots, service size, meter details and the grounding path. Prevents: a common and avoidable redesign: a plan set drawn against a busbar rating nobody verified. The main breaker and the busbar are often rated differently, and the busbar is the number the interconnection math is checked against.

Treat the electrical kit as three parts. PPE sized to your company's electrical safety program: safety glasses, voltage-rated gloves where required, and arc-rated clothing if the task calls for it. Only a qualified person removes a dead front. A meter rated for the measurement category of the equipment it will touch, if your program allows live verification at all. Many survey programs are photo-only. A photo checklist, which does more work than either: the panel label, the main breaker, the busbar rating, the full interior with every breaker legible, the meter number and the service entrance. The electrical and interconnection page shows the full shot list.

Open residential load centre with the dead front removed, showing breakers, bus connections and conductors
Field capture · Electrical · Dead front offFull interior, every breaker and conductor legible.
Meter-main service panel with the door open, showing a 200 amp main breaker, bus stabs and a ground bar
Field capture · Electrical · MainMain breaker rating read at the breaker, open slots counted.
Close view inside a small panelboard showing lugs, neutral bar, conductors and the listing label
Field capture · Electrical · LabelListing label and lugs shot close enough to read.
Access and fall protection

Ladder and fall protection: the tools that keep the survey possible

Measures: nothing. Prevents: the worst outcome on any job, and a survey that stops at the gutter because nobody could get on the roof safely. For residential construction, OSHA 1926.501(b)(13) requires guardrails, a safety net or a personal fall arrest system at 6 feet or more above a lower level, with a written fall protection plan allowed only where those are shown to be infeasible. Whether a given survey is treated as construction or general industry work is worth confirming with your safety lead.

For ladders, OSHA 1926.1053 calls for side rails that extend at least 3 feet above the landing and a setup angle where the base sits about a quarter of the working length out from the support. In practice the kit is a ladder tall enough for the two-storey jobs, a ladder stabiliser or standoff so it does not bear on the gutter, a harness and lanyard, and a roof anchor. Record the ladder point you used: the install crew needs it too.

Capture

Drone and phone: capture tools, not decoration

Drone for measurement photos

Measures: nothing directly. It captures the overlapping photos a dimensioned roof model is built from, plus the planes and obstructions you cannot safely walk. Prevents: a missing plane or an unmeasured steep face. The photos only become measurements with a known scale, which is why the tape run on the roof still matters. Commercial drone work in the United States also requires an FAA remote pilot certificate under Part 107.

Phone or tablet capture app

Measures: it records everything else. Prevents: the return visit. The capture app is where the checklist lives, and its most important feature is the review step: every photo checked on the device before the truck leaves. Blurry, dark and cropped-too-tight are recoverable on site and expensive afterwards.

Roof model with ridge, hip, valley, eave and rake lengths labelled on each edge
Model output · Roof · EdgesRidge, hip, valley, eave and rake lengths labelled on the model.
Plan view of a hip roof with faces outlined, each labelled with pitch and area
Model output · Roof · FacetsEach face outlined with its pitch and area.
Shingle roof seen from above with a powered roof vent, a plumbing stack, a two-storey neighbouring house and trees beyond
Field capture · Roof · ObstructionsVent, stack and the two-storey neighbour in one frame.

The solar surveyor kit list, in one table

Check it before the first job of the day.

ToolMeasuresError it prevents
Tape and laser measurePlane edges, obstruction offsetsLayout on traced geometry
Pitch gauge or inclinometerSlope of every planeWrong production and structural inputs
CompassAzimuth per planeEstimate pointed the wrong way
Shade or horizon toolHorizon from each array areaUnseen shade loss
Attic kitMember size, spacing, span, sheathingStructural letter on assumed framing
Electrical PPE, meter, photo listBusbar, main, slots, meter, serviceInterconnection redesign
Ladder and fall protectionSafe accessInjury, and an unfinished survey
DronePhotos for the roof modelMissing or unwalkable planes
Phone or tablet appEverything, reviewed on siteThe return visit

How we run the kit

Our site survey puts one technician on the roof, in the attic and at the service panel in one visit, with the deliverable back within 48 hours. The zone pages show the kit at work: roof and drone capture, attic and structure, and electrical and interconnection.

Questions technicians ask

What tools do you need for a solar site survey?

Tape and laser measure, pitch gauge, compass, shade or horizon tool, an attic kit (light and tape), electrical PPE with a panel photo checklist, a ladder with fall protection, and a phone or tablet for capture. Many crews add a drone for measurement photos.

Is a phone app accurate enough to measure roof pitch and azimuth?

It can be a useful cross-check, but a phone compass is easily pulled off by nearby metal such as flashing, vents and the service panel, and it reads magnetic north unless the app corrects for declination. Read pitch with a gauge seated on the plane and treat the phone as the capture and review tool.

Do you need to correct a compass reading for solar azimuth?

Usually, yes. A magnetic compass points to magnetic north, while design tools generally expect azimuth relative to true north. The difference, magnetic declination, varies by location and can exceed 10 degrees in parts of the United States. NOAA publishes a declination calculator.

What fall protection is required for a residential roof survey?

For residential construction, OSHA 1926.501(b)(13) requires guardrails, safety nets or a personal fall arrest system at 6 feet or more above a lower level, with a fall protection plan allowed only where those are shown to be infeasible. Whether survey work falls under the construction or general industry rules is worth confirming with your safety lead.

Can a drone replace the tape measure on a site survey?

Not on its own. Drone photos are good for building a dimensioned roof model and documenting planes you cannot safely walk, but a tape-measured reference on the roof gives the model a verified scale, and the attic and electrical data still have to be captured by hand.

Keep reading

Put a fully kitted technician on your next roof

Bring your monthly job count and the AHJs you submit into.

Book a 15-min call
Book a 15-min call