Residential

OverviewRooftop PV at volumeRoof & dronePlanes measured on the roofAttic & structureRafters recordedElectricalPanel and interconnectionDesign & engineeringModel to stamped setHomeowners: free monitoringAlready have solar? Free reviewUnderperformance checkFree tool for homeowners

Commercial & Industrial

OverviewBig roofs, real structureOn-site surveyRoof, structure, switchgearDesign & engineeringPE stampedVisual inspectionModule resolutionThermal inspectionFaults as heatElectroluminescenceCell-level cracks

Utility-Scale

OverviewThousands of acresLiDAR topographyTerrain before earthworkLand surveyingBoundary and topographicConstruction monitoringProgress, measuredThermal & ELEvery string

Across every scale

Site surveysRoof and electrical, one visitPermitting & engineeringStamped plan setsInspectionAerial thermal and ELShading analysisSA, TOF and TSRFSurvey locationsState and metro guides

The platform

Platform overviewPortal, 3D models, live dataFeature guidesWho it serves and how it worksShading analysisMove the sun yourselfCost calculatorWhat bad field data costs you

Sign in

Vanguard AccessInvite only · survey data portal

Solar reference

Solar questions answeredResidential, commercial and utility-scaleSurvey methodologySources, measurements and limitsCompany factsOfficial services and capabilities

Field Notes · build vs. buy

What a survey really costsPart 01 · the full modelUtilization is the whole gamePart 02 · a real TuesdayThe break-even headcountWhen hiring pays offTwo technicians, two roofsVariance, measuredThe hybrid crewIn-house plus outsourced

Field Notes · reference

Site survey checklistBuilt backwards from reworkHow long a survey takesHour by hourDo panels need a permit?What goes in the packageStorage site surveysThe capture listCompare survey vendorsQuestions to ask any vendor

Company

All servicesAll Field NotesAboutBook a 15-min call

Home  /  Field Notes  /  Main switchgear photos

Field Notes · Commercial & Industrial

Main switchgear photos and documentation for a commercial solar survey

A commercial solar survey needs a deliberate set of photographs of the main switchgear.

C&ISwitchgear8 min read

Short answer

A commercial solar survey needs a deliberate set of photographs of the main switchgear: the exterior with its location, every nameplate and label straight on and legible, the main device and bus ratings, the interior with its covers removed only by qualified personnel, the available fault current label, the space for new equipment, and the surrounding clearances. Legible and labeled photographs prevent the most common electrical callbacks.

The photographs engineers ask for twice

The most frequent electrical question that comes back to a survey crew is some version of: can you send a clearer photo of the nameplate? A nameplate that is blurred, glared, cropped or shot from an angle forces the engineer to guess a rating or to wait for another visit. Because switchgear sets the limits of the entire interconnection, the cost of that guess can be large. A disciplined photo set is therefore one of the cheapest quality improvements a survey team can make.

Safety first: what the photographer does and does not do

Photographs are taken by qualified personnel following the electrical safety practices of the site and the survey provider. Opening energized equipment is not part of a survey unless the owner's qualified electrician does it and the crew is trained and authorized. Most information needed can be captured from the exterior, from labels and nameplates, and from interior views provided by the owner's electrician. Never assume that the survey needs to open anything, and never open a utility-sealed cabinet.

The core shot list

  1. Location and context. A wide shot showing the room or area, the door, the surrounding walls and the route to it. This answers where the equipment is, how it is accessed and what is nearby.
  2. Whole assembly. The full front of the switchboard or switchgear, square on, showing all sections.
  3. Main nameplate. The manufacturer's plate, straight on, in focus, whole plate in frame: manufacturer, model, voltage, bus rating, short-circuit rating and catalog or serial information.
  4. Main device. The main breaker or switch, its rating, trip unit and any labels.
  5. Bus rating. Wherever the bus is rated on a label or plate, photographed separately.
  6. Available fault current label. If the equipment carries an arc flash or short-circuit label, capture it and the date.
  7. Breaker schedule. The directory showing positions, ratings and spares, with spare spaces visible.
  8. Meter and CT cabinet. The meter, its number and the cabinet from outside.
  9. Transformer nameplate. kVA, voltage, impedance and the owner's label, if accessible.
  10. Service entrance. Where service conductors enter, conductor sizes if visible and the main disconnect location.

Technique: how to make them legible

  • Shoot square to the plate. Angled shots distort text and add glare.
  • Control reflections by changing position or using indirect light; avoid on-camera flash straight onto glossy plates.
  • Fill the frame with the plate, then back up one step for a second photo showing where it is.
  • Confirm legibility on the screen before moving on, zooming in to the smallest text.
  • Name or number the photos so each can be identified without asking: for example, main nameplate, bus label, breaker directory.
  • Place a scale reference such as a tape in space photographs to show clearance.

Space and clearance photographs

The engineer also needs to know whether there is room for new equipment. Photograph the wall and floor areas proposed for inverters, AC combiners and disconnects, with a tape visible to show the clear depth in front of equipment, headroom and the width of the working space. The electrical code requires working clearances in front of equipment, so measured numbers matter more than impressions. Photograph any obstacles such as pipes, ducts, storage racks and doors that swing into the space.

Photograph for both interconnection options

A load-side breaker connection depends on the bus rating, the main device and available spaces. A supply-side tap depends on the service entrance area, the space near the meter and main, and the ability to make a tap. Photograph evidence for both so the engineer can compare them. The distinction is explained in our note on electrical service and interconnection survey items.

Documentation beyond photographs

  • A written transcription of each nameplate, so a blurred pixel does not become a wrong number.
  • The single-line diagram if the owner has one, with a note on when it was last updated.
  • Utility account information and the contact for the interconnection group.
  • Notes on anything that does not match the drawings, such as extra sections or relabeled breakers.

The transcription step is especially useful. It forces the person in the room to read the plate while they are looking at it, and it gives the engineer a second source to check against the photograph.

Common mistakes in switchgear photo sets

  • Photographing only the front of the main and skipping the other sections, which may carry different ratings.
  • Capturing a nameplate that is partly hidden by a conduit, door edge or the photographer's own shadow.
  • Skipping the breaker directory because it looks handwritten or out of date, when it often shows which spaces are truly spare.
  • Forgetting the room itself, including door swing, ceiling height and storage that encroaches on working space.
  • Naming files with camera defaults, so the engineer has to open every image to find the one needed.
  • Leaving out the date, so nobody can tell later whether the labels reflect the current equipment.

Most of these are habits rather than skills. A one-page shot list on the clipboard or in the capture app, ticked as the crew goes, removes nearly all of them. And a final check, in which a second person flips through the photos and tries to read every nameplate, takes only a few minutes and is the single best protection against a repeat visit.

From photographs to the plan set

These photographs feed the single-line diagram, the equipment schedule and the labeling sheets of the plan set, as described in our note on the survey-to-plan-set handoff. Solar Survey AI captures the electrical room as part of a commercial on-site survey, alongside roof and structure in one visit, with the deliverable 48 hours after the survey, and PE stamped design and engineering uses the same record.

Questions we get about this

What photos of the main switchgear does a solar survey need?

The location, the whole assembly, the main nameplate, main device, bus rating, any fault current label, the breaker directory, meter and CT cabinet, the transformer nameplate, the service entrance and the available space.

Should the survey crew open the switchgear?

Not unless the owner's qualified electrician does so and the crew is trained and authorized. Most information can be captured from exterior labels and nameplates. Utility-sealed cabinets are never opened by the survey.

How do I make a nameplate photo legible?

Shoot square to the plate, control glare, fill the frame, then step back for a context shot, and confirm legibility on the screen. Also transcribe the plate in writing.

Why photograph space and clearances?

The electrical code requires working clearances in front of equipment, so the engineer needs measured depth, width and headroom to confirm that new equipment fits.

Why capture both load-side and supply-side evidence?

Either connection might work depending on the bus, the main, the space and the utility. The engineer can only choose if the survey captured the evidence for both.

Related reading

More in Field Notes, or see every service.

Scoping a commercial roof?

Tell us the building, the roof area and the timeline. We will tell you straight what the survey needs to cover and whether we fit.