Residential

OverviewRooftop PV at volumeRoof & dronePlanes measured on the roofAttic & structureRafters recordedElectricalPanel and interconnectionDesign & engineeringModel to stamped setHomeowners: free monitoringAlready have solar? Free reviewUnderperformance checkFree tool for homeowners

Commercial & Industrial

OverviewBig roofs, real structureOn-site surveyRoof, structure, switchgearDesign & engineeringPE stampedVisual inspectionModule resolutionThermal inspectionFaults as heatElectroluminescenceCell-level cracks

Utility-Scale

OverviewThousands of acresLiDAR topographyTerrain before earthworkLand surveyingBoundary and topographicConstruction monitoringProgress, measuredThermal & ELEvery string

Across every scale

Site surveysRoof and electrical, one visitPermitting & engineeringStamped plan setsInspectionAerial thermal and ELShading analysisSA, TOF and TSRFSurvey locationsState and metro guides

The platform

Platform overviewPortal, 3D models, live dataFeature guidesWho it serves and how it worksShading analysisMove the sun yourselfCost calculatorWhat bad field data costs you

Sign in

Vanguard AccessInvite only · survey data portal

Solar reference

Solar questions answeredResidential, commercial and utility-scaleSurvey methodologySources, measurements and limitsCompany factsOfficial services and capabilities

Field Notes · build vs. buy

What a survey really costsPart 01 · the full modelUtilization is the whole gamePart 02 · a real TuesdayThe break-even headcountWhen hiring pays offTwo technicians, two roofsVariance, measuredThe hybrid crewIn-house plus outsourced

Field Notes · reference

Site survey checklistBuilt backwards from reworkHow long a survey takesHour by hourDo panels need a permit?What goes in the packageStorage site surveysThe capture listCompare survey vendorsQuestions to ask any vendor

Company

All servicesAll Field NotesAboutBook a 15-min call

Home  /  Field Notes  /  Electrical service limits

Field Notes · Commercial & Industrial

How to find out early whether the electrical service limits a commercial solar system

The roof often has room for more panels than the electrical room can accept. Finding the electrical limit early keeps the design honest.

C&IElectrical8 min read

Short answer

Look at the main service, the main breaker, the bus rating and the physical space in the switchgear before you size the array. The roof sets how many modules fit, but the electrical equipment sets how much power the building can accept at the point where the system connects. Photograph the nameplates and the gear, and have the engineer confirm the limit.

The roof is not the only ceiling

Commercial solar discussions usually begin with roof area. How many modules fit, how much of the roof is usable, how much shading is there. Those are real constraints, but they are not the only ones. Behind the wall in the electrical room sits equipment with its own ratings, and a system that fits the roof can still be too large for the service that has to carry it.

The earlier this is known, the cheaper it is. A designer who learns the limit at the end redraws the array. A designer who learns it at the start sizes the array to the limit and spends effort on the options that remain.

The pieces that set the limit

Service size and voltage

The utility service has an ampere rating and a voltage configuration, for example three-phase at a given voltage. The nameplate on the main switchgear or the service entrance equipment shows these. The inverter configuration must match the building's voltage, and the size of the service sets the context for everything downstream.

Main breaker and bus rating

The main breaker protects the bus, and the bus has its own rating. Where solar connects to a busbar, the National Electrical Code limits the combined overcurrent protection feeding that bus relative to the bus rating. The rule is often summarized as the 120 percent rule for load-side connections. The practical effect is that a bus that is already heavily loaded by the main breaker leaves limited room for a solar breaker.

Physical space in the gear

Even where the ratings work, there may be no open space for another breaker, no room for a new section, or no clear working space in front of the equipment. Space is a survey finding, not a calculation, which is why the photographs matter.

Available fault current and equipment ratings

Adding a source changes the fault current the equipment must withstand. The engineer will want the existing equipment's short-circuit ratings and any available utility fault data, so the survey should capture the nameplate details rather than assume them.

Two ways to connect, and why the survey must support both

A load-side connection ties the solar into the existing bus through a breaker. A supply-side connection ties in ahead of the main breaker, typically with a tap or a new enclosure. Which one is possible depends on the gear, the space and the ratings. If the survey records enough for the engineer to evaluate both, the project is not stalled when the first option fails. The note on electrical service and interconnection survey items goes through the capture list in detail.

What to photograph and write down

  • Nameplates on the main gear, the main breaker and any panelboards, readable in the frame, and also transcribed.
  • The interior of the gear with the dead front removed where the facility allows it, showing the bus and available spaces.
  • Working clearances in front of the equipment, with a tape measure in the shot.
  • The route from the proposed array location to the gear, including walls, floors and obstructions the conduit would cross.
  • Existing labels and single-line diagrams posted in the room, even if they look out of date.

Our guide on main switchgear photos and documentation explains the shot list and the transcription habit that prevent the most common callbacks.

What to do with the answer

If the electrical limit is below the size the roof could support, there are only a few honest options: size the array to the limit, change the point of connection, or have the owner and the utility discuss equipment upgrades. The survey does not choose among them. It makes sure the choice is made on the real equipment and not on a guess. The licensed engineer then confirms what the equipment can support.

Questions to put to the owner before the visit

A few questions asked early save a trip. Is there a recent single-line diagram, and who maintains the electrical room? Has the service been upgraded or has equipment been added since the building opened? Is more than one meter or service on the property? Are there plans to add load, such as vehicle charging or new equipment, that would change how the building uses its service? The owner's answers do not replace the survey, but they tell the crew what to look for and who to ask for access to locked rooms and enclosures.

Where Solar Survey AI fits

Our commercial on-site survey covers the roof, the structure and the electrical room in one visit, with turnaround confirmed when we scope the job. The electrical record goes to engineering stamped by a licensed professional engineer where required, so the size of the system is checked against the building as measured. Use us when you need the electrical room documented before the layout is fixed.

Questions we get about this

Can the electrical service limit how many panels I can install?

Yes. The roof sets how many modules fit, but the service, main breaker, bus rating and available space in the gear can limit the size of the system that can be connected.

What is the 120 percent rule?

It is a common name for the National Electrical Code limit on combined overcurrent protection feeding a busbar when solar connects on the load side. It is why a heavily loaded bus can leave little room for a solar breaker.

What is a supply-side connection?

A connection made ahead of the main breaker, usually through a tap or a new enclosure. It can be an alternative when the load-side option does not work.

What should a survey capture in the electrical room?

Nameplates, the interior of the gear, available spaces, working clearances, labels and diagrams, and the route from the array to the equipment.

Who confirms the limit?

A licensed engineer reviews the equipment ratings and the survey record and confirms what the building can support.

Related reading

More in Field Notes, or see every service.

Scoping a commercial project?

Tell us the building, the scope and the timeline. We will tell you straight what the work needs to cover and whether we fit.

Book a 15-min call
Book a 15-min call