Residential

OverviewRooftop PV at volumeRoof & dronePlanes measured on the roofAttic & structureRafters recordedElectricalPanel and interconnectionDesign & engineeringModel to stamped setHomeowners: free monitoringAlready have solar? Free reviewUnderperformance checkFree tool for homeowners

Commercial & Industrial

OverviewBig roofs, real structureOn-site surveyRoof, structure, switchgearDesign & engineeringPE stampedVisual inspectionModule resolutionThermal inspectionFaults as heatElectroluminescenceCell-level cracks

Utility-Scale

OverviewThousands of acresLiDAR topographyTerrain before earthworkLand surveyingBoundary and topographicConstruction monitoringProgress, measuredThermal & ELEvery string

Across every scale

Site surveysRoof and electrical, one visitPermitting & engineeringStamped plan setsInspectionAerial thermal and ELShading analysisSA, TOF and TSRFSurvey locationsState and metro guides

The platform

Platform overviewPortal, 3D models, live dataFeature guidesWho it serves and how it worksShading analysisMove the sun yourselfCost calculatorWhat bad field data costs you

Sign in

Vanguard AccessInvite only · survey data portal

Solar reference

Solar questions answeredResidential, commercial and utility-scaleSurvey methodologySources, measurements and limitsCompany factsOfficial services and capabilities

Field Notes · build vs. buy

What a survey really costsPart 01 · the full modelUtilization is the whole gamePart 02 · a real TuesdayThe break-even headcountWhen hiring pays offTwo technicians, two roofsVariance, measuredThe hybrid crewIn-house plus outsourced

Field Notes · reference

Site survey checklistBuilt backwards from reworkHow long a survey takesHour by hourDo panels need a permit?What goes in the packageStorage site surveysThe capture listCompare survey vendorsQuestions to ask any vendor

Company

All servicesAll Field NotesAboutBook a 15-min call

Home  /  Field Notes  /  Outdated imagery surveys

Field Notes · Commercial & Industrial

Solar site surveys when satellite imagery is outdated

Free map imagery is convenient, but it is a photograph from some past date. In rural areas that date can be a long way back.

C&IMethod7 min read

Short answer

When satellite imagery is out of date, designs built on it can miss new buildings, added equipment, grown trees and changed roofs. The fix is to treat imagery as a starting point and confirm the current condition on site. A site survey records what is there today, with measurements, instead of what a photograph showed at some earlier date.

Imagery is a photograph, not a measurement of today

Satellite and aerial map imagery is a snapshot taken at some point in the past, and each area is refreshed on its own schedule. Dense urban areas tend to be updated more often. Rural and low-traffic areas can go much longer between updates, and the image on screen may predate recent changes by a wide margin. The map does not always tell you which date you are looking at.

For a solar project, that gap matters because the things that decide a design are exactly the things that change: a new roof, an added building, an extension, rooftop equipment, a carport, a fence line, or trees that have grown since the picture was taken.

What outdated imagery gets wrong

  • Roof condition and layers. A roof may have been replaced, overlaid or patched since the photo, which changes both the usable area and the structural picture.
  • Obstructions. New rooftop units, vents, antennas or skylights may not appear.
  • Shading. Trees grow, and new buildings or structures appear nearby. A shading estimate from an old image can understate the problem.
  • The building itself. Additions, demolished sections and new outbuildings can all change what should be surveyed.
  • Ground conditions. On ground-mount sites, grading, drainage, new roads and clearing may have changed the lot.

None of these is dramatic on its own. The risk is that they accumulate silently, and the first person to notice is often the installer standing on the roof.

Why rural sites are exposed

Rural properties often include several buildings, long conduit runs, large open areas and equipment that has been added over time without updated drawings. At the same time, they are the properties where imagery is most likely to be old and where an unnecessary extra trip costs the most. The combination makes verification at the first visit worth more, not less.

How to handle imagery responsibly

Check the date

Where the tool shows an imagery date, read it. Compare more than one source if you can. If two sources disagree, assume neither is current.

Ask the owner what has changed

A short call with the owner or facility manager is cheap and often decisive. Ask about roof work, new buildings, equipment added or removed, and trees cut or planted.

Treat the layout as preliminary

A concept layout drawn from old imagery is fine as a conversation starter. Label it preliminary and keep it away from structural and electrical decisions.

Confirm on site

The survey is where the current condition is recorded with photographs and measurements. For a larger property, aerial capture on the day can document the roof and surroundings as they are now, which the note on drone versus manual survey explains. For the broader trade-off between remote and on-site work, see remote versus onsite solar site surveys.

What the survey should record about change

A good survey does more than measure. It notes where reality differs from the information the team started with: the extra building that was not on the map, the roof layer that is not in the drawings, the tree that now overhangs the south edge. Those notes let the engineer correct the model early, and they give the owner a clear record of what was found.

A short checklist for projects with old imagery

  • Note the imagery date from each source you used, and record that it may be out of date.
  • Ask the owner for a list of changes to the roof, buildings and equipment since the last few years.
  • Flag every dimension taken from imagery as unverified until the survey confirms it.
  • Ask the crew to photograph all four sides of each building and the approach roads, so changes are documented.
  • Update the layout only after the survey, and keep the earlier version for comparison.

Where Solar Survey AI fits

Solar Survey AI sends a technician to the property for the commercial on-site survey: the roof, the structure and the electrical room recorded in one visit, with turnaround confirmed when we scope the job. If your project sits in an area where the imagery is old, tell us when you book and we will scope the visit to confirm what the photographs cannot.

Questions we get about this

How old can satellite imagery be?

It varies by location. Some areas are refreshed often while others, especially rural ones, can go much longer. The date shown, where available, is worth checking, and sources can differ.

What can outdated imagery miss on a solar project?

New roofs and overlays, added equipment and buildings, grown trees, and changed ground conditions.

Can I design from imagery and verify later?

You can build a preliminary concept, but keep it away from structural and electrical decisions until the survey confirms the current condition.

Is a drone a substitute for the survey?

A drone captures the roof and surroundings well, but it does not replace measurements and inspection inside the building. The two are often combined.

What should I tell the surveyor?

Anything you know has changed: roof work, new buildings, equipment added or removed, and trees planted or cut.

Related reading

More in Field Notes, or see every service.