Residential

OverviewRooftop PV at volumeRoof & dronePlanes measured on the roofAttic & structureRafters recordedElectricalPanel and interconnectionDesign & engineeringModel to stamped setHomeowners: free monitoringAlready have solar? Free reviewUnderperformance checkFree tool for homeowners

Commercial & Industrial

OverviewBig roofs, real structureOn-site surveyRoof, structure, switchgearDesign & engineeringPE stampedVisual inspectionModule resolutionThermal inspectionFaults as heatElectroluminescenceCell-level cracks

Utility-Scale

OverviewThousands of acresLiDAR topographyTerrain before earthworkLand surveyingBoundary and topographicConstruction monitoringProgress, measuredThermal & ELEvery string

Across every scale

Site surveysRoof and electrical, one visitPermitting & engineeringStamped plan setsInspectionAerial thermal and ELShading analysisSA, TOF and TSRFSurvey locationsState and metro guides

The platform

Platform overviewPortal, 3D models, live dataFeature guidesWho it serves and how it worksShading analysisMove the sun yourselfCost calculatorWhat bad field data costs you

Sign in

Vanguard AccessInvite only · survey data portal

Solar reference

Solar questions answeredResidential, commercial and utility-scaleSurvey methodologySources, measurements and limitsCompany factsOfficial services and capabilities

Field Notes · build vs. buy

What a survey really costsPart 01 · the full modelUtilization is the whole gamePart 02 · a real TuesdayThe break-even headcountWhen hiring pays offTwo technicians, two roofsVariance, measuredThe hybrid crewIn-house plus outsourced

Field Notes · reference

Site survey checklistBuilt backwards from reworkHow long a survey takesHour by hourDo panels need a permit?What goes in the packageStorage site surveysThe capture listCompare survey vendorsQuestions to ask any vendor

Company

All servicesAll Field NotesAboutBook a 15-min call

Home  /  Field Notes  /  Feasibility vs site survey

Field Notes · Commercial & Industrial

Feasibility study vs site survey for commercial solar: which comes first?

A feasibility study decides whether a commercial project is worth pursuing. A site survey records what the building actually is. They answer different questions, and the order matters.

C&IPre-construction8 min read

Short answer

Do a light feasibility screen first, then a site survey, then let the survey feed the design. The screen uses remote data to rule projects in or out cheaply. The survey measures the roof, the structure and the electrical room so that the design is built on the real building instead of on assumptions from imagery and old drawings.

Two different questions

People use the words feasibility study and site survey as if they were two names for the same task. They are not. A feasibility study asks whether a project should proceed at all: is there usable roof or land, is the owner interested, does the utility context look workable, and are there any obvious blockers. A site survey asks a narrower and more physical question: what exactly is on this property, measured and photographed, so that an engineer can design it.

Because the questions differ, the inputs differ. A feasibility screen can be done largely at a desk, using aerial imagery, the owner's description of the building, a recent utility bill and whatever drawings exist. A site survey cannot be done at a desk, because the things that decide a commercial project are the things that imagery and drawings cannot show reliably.

What a feasibility screen can and cannot settle

A desk screen is good at eliminating weak candidates quickly. It can show that a roof is mostly covered by rooftop units, that a building is heavily shaded by taller neighbors, or that the usable area is too small to matter. It can flag a building that is clearly a poor fit before anyone drives to it.

What a desk screen cannot do is confirm a project. It cannot tell you the framing type under the deck, the age and condition of the membrane, whether the main switchgear has room for a new breaker or tap, or whether the drawing set still matches the building after years of tenant changes. Treating a passed screen as a confirmed project is how teams end up redesigning after the first site visit.

  • Good for the screen: usable area, orientation, obvious shading, building type, rough electrical service size from the owner.
  • Needs the survey: structure, roof buildup and condition, penetrations, switchgear and bus details, conduit routes, access and staging.

Why the survey should come before detailed design

Design work built on assumptions is cheap to start and expensive to finish. If the layout is drawn from imagery and then the survey shows a weak bay, a cut joist, an older roof layer or a crowded electrical room, the layout changes and the engineering is partly redone. The survey is the first moment the design team can distinguish what is measured from what is assumed.

A practical rule is to keep design effort proportional to certainty. Before the survey, produce only a concept-level layout labeled as preliminary. After the survey, build the real layout and the plan set on the measured record. The survey-to-plan-set handoff describes how that record maps onto the drawings.

A sensible order of work

1. Screen with remote data

Collect the address, building type, owner contact, utility account details and any drawings the owner can share. Review imagery for usable area and obvious obstructions. Write down the open questions instead of guessing at the answers.

2. Confirm the open questions with a site survey

Send a technician to record the roof surface, the structure, the electrical room and the site logistics in one visit. The list of what to capture is in the commercial rooftop survey checklist. Anything the crew cannot reach should be recorded as not verified, not left out silently.

3. Make the go or no-go call on measured facts

With the survey in hand, the question becomes whether the building as measured supports the project. Sometimes the answer is to reduce the array, change the mounting approach, or move capacity to a carport or ground mount. Learning that after a survey is far cheaper than learning it during construction.

4. Design and engineer from the same record

The structural check, the electrical single-line and the layout should all draw on one record, so that nobody is reconciling three versions of the building.

When a survey can come first

There are cases where skipping a separate screen is reasonable. If the owner has already committed and the building is a known quantity, an EPC may go straight to the survey. If a portfolio of similar buildings is being evaluated, a quick screen of every building and a survey of the strongest candidates is usually the efficient pattern. The point is not rigid sequencing, it is making sure design is never started on facts nobody has verified.

Where Solar Survey AI fits

Solar Survey AI performs the commercial on-site survey in one visit, covering the roof, the structure and the electrical room, with turnaround confirmed when we scope the job. Design and engineering follow from the same record and are stamped by a licensed professional engineer. If you are deciding which projects deserve a visit, talk to us about scoping before you commit crews.

Questions we get about this

Is a feasibility study the same as a site survey?

No. A feasibility study decides whether a project should proceed, mostly using remote data. A site survey records the physical building on site so that engineering can design it.

Can I skip the feasibility study?

Sometimes. If the project is already committed or the building is well understood, going straight to a survey is reasonable. For a portfolio, a quick screen helps decide where surveys are worth sending.

Why not design from satellite imagery?

Imagery cannot show framing, membrane condition, switchgear space or modifications made after the drawings. A layout built on imagery alone often has to be redone once the survey arrives.

What should the survey confirm that the screen cannot?

Structure and roof buildup, penetrations and obstructions, the electrical room and switchgear details, and site access and staging.

Who makes the go or no-go call?

The project team does, ideally on measured facts. The survey supplies the facts, and the engineer confirms what the structure and electrical equipment can support.

Related reading

More in Field Notes, or see every service.

Scoping a commercial project?

Tell us the building, the scope and the timeline. We will tell you straight what the work needs to cover and whether we fit.