Residential

OverviewRooftop PV at volumeRoof & dronePlanes measured on the roofAttic & structureRafters recordedElectricalPanel and interconnectionDesign & engineeringModel to stamped set

Commercial & Industrial

OverviewBig roofs, real structureOn-site surveyRoof, structure, switchgearDesign & engineeringPE stampedVisual inspectionModule resolutionThermal inspectionFaults as heatElectroluminescenceCell-level cracks

Utility-Scale

OverviewThousands of acresLiDAR topographyTerrain before earthworkLand surveyingBoundary and topographicConstruction monitoringProgress, measuredThermal & ELEvery string

Across every scale

Site surveysRoof and electrical, one visitPermitting & engineeringStamped plan setsInspectionAerial thermal and ELShading analysisSA, TOF and TSRF

The platform

Platform overviewPortal, 3D models, live dataShading analysisMove the sun yourselfCost calculatorWhat bad field data costs you

Sign in

Vanguard AccessInvite only · survey data portalScheduling & DispatchCrewLink · all verticals

Field Notes · build vs. buy

What a survey really costsPart 01 · the full modelUtilization is the whole gamePart 02 · a real TuesdayThe break-even headcountWhen hiring pays offTwo technicians, two roofsVariance, measuredThe hybrid crewIn-house plus outsourced

Field Notes · reference

Site survey checklistBuilt backwards from reworkHow long a survey takesHour by hourDo panels need a permit?What goes in the packageStorage site surveysThe capture listCompare survey vendorsQuestions to ask any vendor

Company

All servicesAll Field NotesAboutBook a 15-min call

Home  /  Commercial & Industrial  /  Design & engineering

Commercial & industrial · Design & engineering

Engineering on the building as measured.

Array layout, structural and electrical engineering off what was verified on site, not a set drawn in 1997. Stamped by a licensed professional engineer, permit-ready six days from the survey.

6 daysSurvey to permit-ready
PE sealedStructural and electrical
Real framingAttachments on measured joists
One recordSurvey to inspection

The drawings you inherit are rarely the building

Renovations, re-roofs and tenant changes pile up. Designing off old drawings is how an attachment lands on a joist that is not there.

1

Old drawings

As-built sets drift from the real building over decades. The survey is the correction.

2

Load margins

Commercial roofs often carry little spare capacity. Real joist depth and deck gauge decide what the roof can take.

3

Interconnection

Bus capacity and the interconnection path decide the system size as much as the roof does.

What comes back

A design and a stamped set built on one measured record.

Design

  • Array layout on the measured roof
  • Setbacks, fire pathways and roof access applied
  • Penetrations, curbs and drainage respected
  • Layout against the membrane and warranty constraints

Engineering

  • Structural analysis on real joist depth, spacing and span
  • Attachment design landed on the framing
  • Electrical engineering to the verified switchgear
  • Permit set sealed by a licensed professional engineer

How it works

1

Survey

A technician captures roof, structure and electrical room in one visit.

2

Design

Layout and engineering on the building as measured.

3

Stamped set

Sealed and submission-ready six days from the survey.

Related C&I offerings

Back to Commercial & Industrial, or see every service.

Talk through a site in 15 minutes

No pitch deck. Tell us the site and the timeline, and we will tell you straight whether we fit.

Book a 15-min call
Book a 15-min call