Home / Residential / Electrical and interconnection
Residential · ElectricalThe interconnection is decided at the service panel. The technician records bus rating, main breaker and every slot, then traces the route to the array, so install day has no electrical surprise.


A design that assumes 200A on a 100A bus doesn't fail on paper. It fails on install day, with a crew on site.
So the technician photographs the main breaker and the bus rating separately, counts every slot, open, used, tandem and double-tapped, and notes existing loads and sub-panels.
Meter location, disconnects, available interconnection points and the grounding and bonding path are all recorded.
The conduit run is measured along the actual path from service to array, not a straight line on a site plan. Battery and inverter placement starts from where the equipment can really go.

Captured on every residential visit.
Adding storage changes the capture more than most installers expect. The full list is in what a battery adds to the site survey.
The panel is one of three stops.