Home / Solar site surveys / North Carolina / Charlotte
Solar site surveys · Charlotte, NCRoof, attic and service panel captured in one visit, with the plan set built for the Charlotte AHJ you submit into and the utility that serves the address.
In Charlotte, building and electrical permits for rooftop solar come from Mecklenburg County Code Enforcement, which permits and inspects all construction in the county, including the six other towns. Residential PV inspections are handled by its Residential Multi-Trade team, Mecklenburg uses the 115 mph inland design wind speed, and Duke Energy Carolinas handles interconnection.
North Carolina state rules apply here, plus whatever the local AHJ amends.
Because Mecklenburg County permits and inspects construction county-wide, Charlotte and its in-county suburbs share one plan review and inspection process, while zoning holds can still come from the city or town.11,12
Mecklenburg is not on the NC Residential Code's county list of higher wind speeds, so the 115 mph ultimate design wind speed for unlisted counties applies to residential work.5
Charlotte homes on Duke Energy Carolinas' Residential Solar Choice rider pay a $22 minimum bill and $0.99 per kW of nameplate capacity each month, and systems over 15 kW add a grid access fee of $2.05 per kW above 15.13
The main AHJs, and how the rest of the metro splits up.
Handles permitting, plan review and inspections for building, electrical, mechanical and plumbing work across Mecklenburg County, and its Residential Multi-Trade Inspections team covers residential PV systems on small projects.11,14
Official page ↗The City of Charlotte and the towns of Cornelius, Davidson, Huntersville, Matthews, Mint Hill and Pineville are Code Enforcement partner agencies that can place holds on a project, and zoning questions go to the relevant city or town.12,15
Official page ↗Inside Mecklenburg County, Charlotte, the six towns and unincorporated areas all go through the same county Code Enforcement office, with each town handling its own zoning. Suburbs in neighboring counties, such as Concord, Gastonia, Mooresville and Monroe, are outside Mecklenburg's jurisdiction, so check the local AHJ there.11,12,15
Duke Energy Carolinas serves Charlotte and much of the Piedmont; the NCUC service map also shows cooperative and municipal territories around the region, so confirm the utility on the customer's bill.21
Serves about 2.3 million North Carolina customers in the Piedmont and west, including Charlotte. Residential systems must follow the NCUC-approved NC Interconnection Procedures, with an accepted Request to Interconnect, an application fee, insurance and an interconnection agreement, and are capped at 20 kW AC under its net metering riders.21,13,22,23
Interconnection page ↗The same capture standard as every other North Carolina job, so the plan set is built on what the technician verified on site.
Mecklenburg County Code Enforcement, a division of the county's Land Use and Environmental Services Agency, handles permitting, plan review and inspections for building and electrical work throughout the county, including the City of Charlotte.11,12
Code Enforcement's Residential Multi-Trade Inspections team lists residential photovoltaic systems among the small residential projects it inspects.14
Building permits in those towns also run through Mecklenburg County Code Enforcement, but each town is a partner agency that handles its own zoning and can place holds on a permit.12,15
Mecklenburg County is not listed in the NC Residential Code's county wind table, so the default 115 mph ultimate design wind speed applies under the 2018 code; engineered designs should still confirm site exposure.5
Duke Energy Carolinas' Net Metering Bridge rider takes first-come applications until January 1, 2027, within a 38,700 kW AC cap for 2026. Customers who miss it go on Residential Solar Choice.22
State-level detail is on the North Carolina page; every location is on the solar site survey hub.
Roof, attic and service panel in one visit
Explore →Roof, structure and switchgear
Explore →Terrain, build and operations
Explore →Roof and electrical, one visit
Explore →Stamped sets, six days from survey
Explore →SA, TOF and TSRF per plane
Explore →Every local fact on this page links to where it came from. Codes, programs and tariffs change: confirm the current requirement with the AHJ and the utility before you design.
Bring your monthly job count and the AHJs you submit into, and we will tell you straight whether we fit.
Book a 15-min callIn-person site surveys, engineering and inspection for residential, C&I and utility-scale solar, delivered as live data.