Solar site surveys · Boston, MARoof, attic and service panel captured in one visit, with the plan set built for the Boston AHJ you submit into and the utility that serves the address.
In Boston, Inspectional Services issues both a building permit and an electrical permit for solar. Homes of one or two units with systems under 20 kW use the short form, and triple-deckers and larger buildings use the long form. Eversource delivers power across the city, where part of the grid is an area network that can limit interconnection. Boston also enforces the Specialized energy code for new construction and major renovations.
Massachusetts state rules apply here, plus whatever the local AHJ amends.
Eversource warns that some parts of Boston and nearby areas, known as the Area Network, can be hard to interconnect. Its Simplified path there requires the system to be under 1/15 of the customer's minimum load, so confirm suitability early.11,12
Three-family buildings are Long Form permits in Boston and need stamped plans showing the array layout with safe emergency access, so capture roof dimensions, obstructions and access points carefully.13
Boston's residential design values are a 40 psf ground snow load, a 30 psf minimum flat-roof snow load and a 120 mph ultimate wind speed.6
The main AHJs, and how the rest of the metro splits up.
Solar needs both a building and an electrical permit. One- and two-family homes with systems under 20 kW can use the Short Form, which requires a structural engineer's report on the roof and a panel layout sketch. Three-family and larger buildings, or bigger systems, go through the Long Form with stamped plans showing emergency access. Only a Massachusetts-licensed electrician can apply for the electrical permit.13
Official page ↗Every surrounding city and town has its own building commissioner and permit process. Several, including Cambridge, Somerville, Brookline, Newton, Medford and Watertown, have adopted the Specialized energy code as Boston has.14,9
Eversource delivers electricity in Boston, including to customers of the city's Community Choice Electricity program. Some nearby towns, such as Belmont, Braintree and Hingham, have their own municipal light plants.18,19
Delivers electricity in Boston. Listed inverter-based systems of 25 kW AC or less can use the Simplified process in PowerClerk, with no application fee on radial circuits; area-network locations have tighter size limits and a fee.12,18
Interconnection page ↗Under its interconnection tariff (M.D.P.U. No. 1579, effective April 15, 2025), the Simplified process covers listed single-phase inverter systems of 15 kW or less and three-phase systems of 25 kW or less on radial circuits. Network locations are limited to 1/15 of the customer's minimum load.20
Interconnection page ↗The same capture standard as every other Massachusetts job, so the plan set is built on what the technician verified on site.
A building permit and an electrical permit from Inspectional Services. One- and two-family homes with systems under 20 kW can use the Short Form, which requires a structural engineer's report on the roof. Larger systems and buildings of three or more units use the Long Form.13
Only a contractor holding a valid Massachusetts electrical license, who also performs the electrical work.13
Most can, but parts of Boston are on Eversource's Area Network, where interconnection can be harder and the Simplified process caps system size relative to the customer's minimum load. Check the location with Eversource before design.11,12
The Massachusetts Residential Code lists Boston at a 40 psf ground snow load and a 30 psf minimum flat-roof snow load, with a 120 mph ultimate wind speed.6
State-level detail is on the Massachusetts page; every location is on the solar site survey hub.
Roof, attic and service panel in one visit
Explore →Roof, structure and switchgear
Explore →Terrain, build and operations
Explore →Roof and electrical, one visit
Explore →Stamped sets, six days from survey
Explore →SA, TOF and TSRF per plane
Explore →Every local fact on this page links to where it came from. Codes, programs and tariffs change: confirm the current requirement with the AHJ and the utility before you design.