Solar site surveys · Atlanta, GARoof, attic and service panel captured in one visit, with the plan set built for the Atlanta AHJ you submit into and the utility that serves the address.
Inside the City of Atlanta, rooftop solar goes through the Office of Buildings as an express permit, and since February 1, 2025 express applications must be filed in person. DeKalb County permits only its unincorporated areas, and Fulton County's own permitting now covers just the Fulton Industrial district, so most metro addresses sit with a city AHJ. Georgia Power or an EMC handles interconnection.
Georgia state rules apply here, plus whatever the local AHJ amends.
About 45.7% of the city was under tree canopy in the 2023 assessment, the highest shares on residential land, so shade from neighboring trees drives array placement.6,7
Atlanta express permits, including rooftop solar, must be submitted in person at the Office of Buildings since February 1, 2025.8
Work on designated historic and landmark properties in the city goes through a certificate of appropriateness, which the Urban Design Commission reviews, so check district status before designing a visible array.9
Homes on Georgia Power are capped at 10 kW AC of inverter capacity, which limits how much of a large roof can be used.10
The main AHJs, and how the rest of the metro splits up.
Roof-mounted solar is filed as an express permit using the city's Solar Roof Install submittal information. Since February 1, 2025 express applications are accepted only in person at the Office of Buildings, and online express applications are no longer taken.11,8,12
Official page ↗Permits projects in unincorporated DeKalb; solar must meet zoning, building and safety rules, and trade permits are filed by licensed contractors. Addresses inside DeKalb's cities are permitted by the city instead.13
Official page ↗Since the City of South Fulton took over on July 3, 2017, Fulton County's planning, permitting and inspections cover only the Fulton Industrial Business District; the rest of the county is permitted by its cities.14
Official page ↗Every city in Fulton and DeKalb issues its own permits under the same state minimum codes; DeKalb County steps in only for unincorporated land, and Fulton County only for the Fulton Industrial district.13,14,1
Georgia Power, EMCs and municipal systems all operate in Georgia under different levels of PSC oversight, so the serving utility on the customer's bill determines the export credit and application process.16,17
Residential systems are limited to 10 kW AC under the RNR-11 tariff, and applications are handled through PowerClerk. New customers take RNR-Instantaneous Netting; the older monthly-netting pilot is closed and ends by 2038.17,10
Interconnection page ↗Georgia has 41 EMCs over which the PSC has only limited authority, so each sets its own distributed generation rider; Jackson EMC, for example, caps residential systems at 10 kW.16,18
Interconnection page ↗The same capture standard as every other Georgia job, so the plan set is built on what the technician verified on site.
Not for express permits: since February 1, 2025 the City of Atlanta accepts express applications, which include rooftop solar, only in person at the Office of Buildings.8,11
DeKalb County Planning & Sustainability. Inside DeKalb's cities, the city's own permitting office is the AHJ.13
Rarely. Since 2017 Fulton County permits only the Fulton Industrial Business District; other addresses in the county are handled by their city.14
A lot: tree canopy covered 45.7% of the city in 2023, concentrated on residential land, so shading is often the deciding site factor.6,7
The state minimum codes effective January 1, 2026: the 2023 NEC with Georgia amendments, the 2024 IRC and the 2024 IFC, enforced by the city.1
State-level detail is on the Georgia page; every location is on the solar site survey hub.
Roof, attic and service panel in one visit
Explore →Roof, structure and switchgear
Explore →Terrain, build and operations
Explore →Roof and electrical, one visit
Explore →Stamped sets, six days from survey
Explore →SA, TOF and TSRF per plane
Explore →Every local fact on this page links to where it came from. Codes, programs and tariffs change: confirm the current requirement with the AHJ and the utility before you design.
Bring your monthly job count and the AHJs you submit into, and we will tell you straight whether we fit.
Book a 15-min callIn-person site surveys, engineering and inspection for residential, C&I and utility-scale solar, delivered as live data.