Home / Solar site surveys / Georgia
Solar site surveys · GeorgiaA technician on the roof, in the attic and at the service panel, with the survey read against the code editions, AHJs and utilities that apply in Georgia.
Georgia's mandatory state minimum codes moved on January 1, 2026 to the 2023 NEC with 2026 Georgia amendments and the 2024 IRC and IBC, with the 2024 IFC adopted by the Safety Fire Commissioner; cities and counties enforce them. Georgia Power caps residential systems at 10 kW AC and credits exports at an annual solar avoided-cost rate plus a 4-cent adder, while 41 EMCs set their own terms. The state has no HOA solar-access law.
The capture spec is the same everywhere. What the engineer and the plan reviewer read it against is not.
Atlanta's 2023 canopy assessment put tree cover at 45.7% of city land, down from 47.9% in 2008, so shading from mature trees is a normal part of a Georgia roof review.6,7
Local guides tie structural paperwork to attachment spacing and load: Fayette County waives framing calculations for supports at 4 feet or less and caps array dead load at 4 psf.5
Georgia Power's 10 kW AC residential ceiling, measured by inverter nameplate, often sets the design limit before roof area does.8
With no state solar-access protection, association covenants and architectural review can block or reshape a rooftop array.9
Who reviews the plan set, and what the state layers on top.
The PSC fully regulates Georgia Power but has limited authority over the 41 EMCs and 52 municipal electric systems, so export terms depend on which utility serves the address.10
Residential systems are limited to 10 kW AC under the RNR-11 tariff, and applications are handled through PowerClerk. New customers take RNR-Instantaneous Netting; the older monthly-netting pilot is closed and ends by 2038.11,8
Interconnection page ↗Georgia has 41 EMCs over which the PSC has only limited authority, so each sets its own distributed generation rider; Jackson EMC, for example, caps residential systems at 10 kW.10,12
Interconnection page ↗One standard, one visit, the same record in Georgia as everywhere else. What it gets checked against is the code stack above.
The 2023 NEC with 2026 Georgia amendments, mandatory statewide since January 1, 2026. Local AHJs set their own grace period for permits filed before then.1,2
Up to 10 kW AC of inverter nameplate for residential customers under the RNR-11 tariff; commercial customers can go to 250 kW AC.8
Not full retail net metering for new customers. Exports are credited at the annual solar avoided-cost rate (3.2188 cents per kWh in 2026) plus a 4-cent adder; the monthly-netting pilot is closed.11,8
Georgia has no law overriding association covenants on solar. A 2026 bill that would have done so did not pass, so the covenants and architectural rules decide.9
No. The PSC has limited authority over the 41 EMCs, and each publishes its own distributed generation rider, so check the serving co-op's terms.10
Metro pages for Georgia: Atlanta.
Roof, attic and service panel in one visit
Explore →Roof, structure and switchgear
Explore →Terrain, build and operations
Explore →Roof and electrical, one visit
Explore →Stamped sets, six days from survey
Explore →SA, TOF and TSRF per plane
Explore →Every local fact on this page links to where it came from. Codes, programs and tariffs change: confirm the current requirement with the AHJ and the utility before you design.
Bring your monthly job count and the AHJs you submit into, and we will tell you straight whether we fit.