Solar site surveys · Tampa, FLRoof, attic and service panel captured in one visit, with the plan set built for the Tampa AHJ you submit into and the utility that serves the address.
In the City of Tampa, residential PV goes through Accela as an electrical or plumbing trade permit that is issued automatically once the application and fees are submitted. Unincorporated Hillsborough County uses HillsGovHub and asks for sealed plans showing R324 roof loads, wind loads and fire pathways. Tampa Electric serves most of Hillsborough, Duke Energy Florida serves most of Pinellas, and the 2024 storms showed how exposed the bay is to storm surge.
Florida state rules apply here, plus whatever the local AHJ amends.
Hurricane Helene in September 2024 pushed 5 to 7 feet of storm surge inundation into Tampa Bay, with a 6.83-foot water level at Old Port Tampa, and destroyed at least 419 homes in Pinellas and Hillsborough counties.11
Hurricane Milton made landfall at Siesta Key in October 2024 and brought up to about 20 inches of rain near St. Petersburg, with record crests on the Hillsborough River.12
Hillsborough County flags properties in the wind-borne debris region for additional design requirements, and PV plans must show the FBC R324 wind-load design.9
Ground-mounted arrays in special flood hazard areas, especially coastal V and Coastal A zones or sites with muck soils, may need a geotechnical report and must meet ASCE 24 and NFIP rules in unincorporated Hillsborough.9
The main AHJs, and how the rest of the metro splits up.
Residential solar requires an electrical or plumbing trade permit, submitted through Accela Citizen Access or in person at 1400 N Boulevard. Residential trade permits are issued automatically on application and payment. Commercial jobs need sealed plans and typically get a review within 10 days.13
Official page ↗Roof-mounted PV in unincorporated Hillsborough needs an electrical trade permit through HillsGovHub. It requires digitally signed and sealed plans showing FBC R324 roof load, wind load, pathways and ridge setbacks, plus a recorded Notice of Commencement before the first inspection.9
Official page ↗The City of Tampa and Hillsborough County run separate permit systems (Accela and HillsGovHub), and unincorporated communities such as Brandon and Riverview fall under the county. Pinellas and Pasco cities have their own building departments.13,9
Tampa Electric serves Tampa and most of Hillsborough County, along with parts of Pasco, Pinellas and Polk, while Duke Energy Florida serves most of Pinellas, including St. Petersburg and Clearwater, and Pasco.21
Investor-owned utility serving Pinellas County and much of Central and North Florida. It reported 89,710 customer-owned renewable interconnections at the end of 2024 under the PSC net metering rule.21,22
Interconnection page ↗Investor-owned utility for most of Hillsborough County and parts of Pasco, Pinellas and Polk. Applications go through its online portal with the AHJ inspection approval and a photo of the placarded disconnect; approval can take up to 30 calendar days, after which a bi-directional meter is installed.23,21
Interconnection page ↗The same capture standard as every other Florida job, so the plan set is built on what the technician verified on site.
Residential solar is a trade permit (electrical or plumbing) in Accela, and the city issues it automatically once the application is submitted and the fees are paid. Inspections are scheduled through the same portal.13
An electrical trade permit through HillsGovHub with digitally signed and sealed plans covering FBC R324 roof load, wind load, pathways and ridge setbacks, electrical drawings per NEC Article 690, and a recorded Notice of Commencement before the first inspection.9
Tampa Electric for Tampa and most of Hillsborough County, and Duke Energy Florida for most of Pinellas, including St. Petersburg and Clearwater. Check the service address, since parts of Pasco and Pinellas are served by Tampa Electric.21,23
Up to 30 calendar days after it receives a complete application with the AHJ inspection approval and other documents, provided the system passes Tampa Electric's inspection. A bi-directional meter is installed after that.23
State-level detail is on the Florida page; every location is on the solar site survey hub.
Roof, attic and service panel in one visit
Explore →Roof, structure and switchgear
Explore →Terrain, build and operations
Explore →Roof and electrical, one visit
Explore →Stamped sets, six days from survey
Explore →SA, TOF and TSRF per plane
Explore →Every local fact on this page links to where it came from. Codes, programs and tariffs change: confirm the current requirement with the AHJ and the utility before you design.
Bring your monthly job count and the AHJs you submit into, and we will tell you straight whether we fit.
Book a 15-min callIn-person site surveys, engineering and inspection for residential, C&I and utility-scale solar, delivered as live data.