Solar site surveys · Miami, FLRoof, attic and service panel captured in one visit, with the plan set built for the Miami AHJ you submit into and the utility that serves the address.
Miami sits in the High-Velocity Hurricane Zone, where the Risk Category II design wind speed is 175 mph and roofing work must meet HVHZ provisions. The City of Miami handles residential rooftop PV as a stand-alone electrical permit that requires a Florida PE letter on hurricane performance. Miami-Dade County permits unincorporated areas, and each other municipality runs its own building department. FPL serves most of the county, while Homestead runs its own municipal utility.
Florida state rules apply here, plus whatever the local AHJ amends.
The FBC sets Miami-Dade's Risk Category II design wind speed at 175 mph under the HVHZ provisions, and county plan review expects roof plans showing ASCE 7 uplift zones, perimeter widths and pressures.11,12
PV roof penetrations in the HVHZ have to be flashed to meet the HVHZ wind requirements, and the roofing type, deck type and roof condition (existing, reroof or new) all go on the permit plans.10,13
County reviewers treat tile roofs as discontinuous systems in which the underlayment waterproofs the roof, so a tile PV mount needs an approved flashing detail rather than sealant alone.10
HVHZ municipalities such as Miami Beach require Miami-Dade Notices of Acceptance for rooftop solar submittals, so record the existing roof covering and mount type during the survey.14
The main AHJs, and how the rest of the metro splits up.
Residential solar needs only an electrical stand-alone solar permit, applied for through iBuild with plans uploaded to ProjectDox. Plans must be sealed by a Florida engineer or a qualifying EC/CVC contractor on jobs under $50,000, and must include a PE letter stating the array will not harm the structure in normal conditions or a hurricane. Commercial jobs also need a roofing permit.15
Official page ↗Applications for unincorporated areas go through the county's online portal. They need a notarized building permit application, an electrical fee sheet, digitally sealed plans showing ASCE 7 wind zones and sealed wind-load calculations, and the FSEC certification form. Using pre-approved mounting details lowers the permit fee.12
Official page ↗Miami Beach waives photovoltaic building permit fees, but a permit is still required. Submittals include structural and electrical calculations and NOAs for rooftop installations, followed by electrical, structural, planning and roofing reviews.14
Official page ↗Each municipality issues its own solar permits with its own submittal package (Miami Beach, Miami Gardens and Miami Lakes each publish one), and Miami-Dade County RER handles unincorporated areas. Broward County to the north is also in the HVHZ.14,16,13,12,11
FPL serves Miami-Dade County outside Homestead, which runs its own municipal electric utility with its own net metering program rather than the PSC rule for investor-owned utilities.22,23
Largest investor-owned utility, covering much of the east coast, Southwest Florida and, since it absorbed Gulf Power on January 1, 2022, Northwest Florida. Customers pre-approve system size in FPL's portal before installing, then upload the AHJ's final inspection or permit; Tier 2 and 3 systems pay a fee and carry liability insurance.24,25,26,27
Interconnection page ↗The same capture standard as every other Florida job, so the plan set is built on what the technician verified on site.
For residential work, the City of Miami requires only an electrical stand-alone solar permit. The package must still include sealed plans and a Florida PE letter confirming the system will not harm the structure, including during a hurricane.15
Under the HVHZ section of the Florida Building Code, the Risk Category II design wind speed in Miami-Dade is 175 mph. The county expects wind uplift zones and sealed wind-load calculations on the plans.11,12
Miami-Dade County's Department of Regulatory and Economic Resources, through its online permit portal. Incorporated cities such as Miami, Miami Beach and Miami Lakes each run their own building departments.12,15,14
State-level detail is on the Florida page; every location is on the solar site survey hub.
Roof, attic and service panel in one visit
Explore →Roof, structure and switchgear
Explore →Terrain, build and operations
Explore →Roof and electrical, one visit
Explore →Stamped sets, six days from survey
Explore →SA, TOF and TSRF per plane
Explore →Every local fact on this page links to where it came from. Codes, programs and tariffs change: confirm the current requirement with the AHJ and the utility before you design.
Bring your monthly job count and the AHJs you submit into, and we will tell you straight whether we fit.
Book a 15-min callIn-person site surveys, engineering and inspection for residential, C&I and utility-scale solar, delivered as live data.