Home / Solar site surveys / Oregon / Portland, Oregon
Solar site surveys · Portland, OregonRoof, attic and service panel captured in one visit, with the plan set built for the Portland, Oregon AHJ you submit into and the utility that serves the address.
In Portland, Oregon, Portland Permitting & Development issues a building permit and a separate electrical permit for rooftop solar through DevHub, using either the state prescriptive path or an engineered design. Homes are designed to Seismic Design Category D1 with at least a 20 psf roof snow load. PGE serves most of the city west of the Willamette, and Pacific Power serves much of North and Northeast Portland.
Oregon state rules apply here, plus whatever the local AHJ amends.
Portland uses Seismic Design Category D1 for one- and two-family homes, so engineered submittals carry lateral design along with gravity and wind.10
The city's minimum design roof snow load is 20 psf plus a 5 psf rain-on-snow surcharge where it applies, and its residential guidance uses an 18 psf design wind pressure.10,11
The permit application asks about roof slope, array area, roofing material, framing and truss spacing to confirm the prescriptive path, so those items need to be measured on site.11,12
Solar permit sets include a fire access path plan, a roof framing plan and roof cross-section, and racking attachment specifications; solar tile installations do not need the fire access path.11
The main AHJs, and how the rest of the metro splits up.
Residential rooftop PV needs a building permit and an electrical permit, applied for online through DevHub with scaled plans in PDF. Prescriptive-path systems need no Oregon-registered designer and emailed prescriptive applications typically take 2 to 3 business days; engineered systems take longer.11,13
Official page ↗The county does not run a single building permit counter: under intergovernmental agreements, Portland, Gresham and Troutdale administer building permits in unincorporated Multnomah County by service area.14
Official page ↗The Oregon specialty codes apply statewide, but each city issues its own solar permits, and Portland, Gresham and Troutdale handle unincorporated Multnomah County under agreements with the county.4,14
PGE covers most of Portland west of the Willamette River and shares the east side with Pacific Power, which serves most of Northeast and much of North Portland; PGE's own service-area page says areas it does not list are Pacific Power's.20,21,22
Serves more than 950,000 customers in 51 cities. Installers apply through PowerClerk; residential applications up to 25 kW are free, and PGE advises waiting for approval before building, then obtaining the local electrical permit before it orders a bidirectional meter.21,23
Interconnection page ↗PacifiCorp's Oregon utility takes net metering applications online with a photo of the meter; after the install and inspection it swaps the meter in 7 to 10 days, and its typical end-to-end timeline is about 70 business days.24
Interconnection page ↗The same capture standard as every other Oregon job, so the plan set is built on what the technician verified on site.
Apply online through DevHub for a building permit and a separate electrical permit, with plans drawn to scale in PDF. Photos and map screenshots are not accepted as plans.11,13
Portland says complete prescriptive applications typically take 2 to 3 business days when sent by email; engineered systems need structural review and take longer.11
West of the Willamette it is usually PGE; on the east side it depends on the address, with Pacific Power serving most of Northeast and much of North Portland. The electric bill is the reliable check.20,21
Portland's residential criteria use a 20 psf minimum roof snow load (plus 5 psf rain-on-snow where applicable), an 18 psf design wind pressure and Seismic Design Category D1.10
State-level detail is on the Oregon page; every location is on the solar site survey hub.
Roof, attic and service panel in one visit
Explore →Roof, structure and switchgear
Explore →Terrain, build and operations
Explore →Roof and electrical, one visit
Explore →Stamped sets, six days from survey
Explore →SA, TOF and TSRF per plane
Explore →Every local fact on this page links to where it came from. Codes, programs and tariffs change: confirm the current requirement with the AHJ and the utility before you design.
Bring your monthly job count and the AHJs you submit into, and we will tell you straight whether we fit.
Book a 15-min callIn-person site surveys, engineering and inspection for residential, C&I and utility-scale solar, delivered as live data.