Home / Solar site surveys / New York / Long Island
Solar site surveys · Long Island, NYRoof, attic and service panel captured in one visit, with the plan set built for the Long Island AHJ you submit into and the utility that serves the address.
Long Island (Nassau and Suffolk counties) follows the 2025 Uniform Code of New York State, with the 2023 NEC, and each town, city or incorporated village issues its own building permits. Nearly all of the island is served by LIPA's grid, operated by PSEG Long Island. Residential solar there is net metered with a Customer Benefit Contribution and cannot opt into the Value Stack.
New York state rules apply here, plus whatever the local AHJ amends.
Residential systems on LIPA's grid cannot opt into the Value Stack, so they net meter and, if interconnected since 2022, pay a CBC. For 2026 that is $1.13 per kW per month.9
Long Island is its own NY-Sun region. The Affordable Solar Residential Incentive pays $0.40/W there, according to NYSERDA's dashboard in September 2026.10
Homes in Rockville Centre, Freeport and Greenport are not LIPA customers, so check the address before assuming PSEG Long Island's interconnection process applies.11
The main AHJs, and how the rest of the metro splits up.
One example of a Long Island town building department. Oyster Bay lists solar panels among the projects that need a building permit, and applications are handled by its Building Division.12
Official page ↗Each city, town and village administers the Uniform Code within its own borders, so incorporated villages inside a town may run separate building departments. Confirm the permitting office for each address.1
LIPA owns the grid serving Long Island and the Rockaways, and PSEG Long Island operates it. The Villages of Rockville Centre, Freeport and Greenport are outside LIPA's service.11
PSEG Long Island runs the grid owned by the Long Island Power Authority (LIPA) for about 1.2 million customers on Long Island and in the Rockaways. Residential solar customers there cannot opt into the Value Stack.11,9
Interconnection page ↗The same capture standard as every other New York job, so the plan set is built on what the technician verified on site.
The town, city or incorporated village where the home is located, because each municipality enforces the Uniform Code within its borders. The Town of Oyster Bay, for example, requires a building permit for solar panels.1,12
For most homes it is PSEG Long Island, which operates LIPA's grid. The Villages of Rockville Centre, Freeport and Greenport are outside LIPA's service area.11
No. NYSERDA's 2026 CBC sheet says mass-market LIPA projects cannot opt into the Value Stack. They net meter, with a CBC of $1.13/kW per month in 2026 for systems interconnected since 2022.9
State-level detail is on the New York page; every location is on the solar site survey hub.
Roof, attic and service panel in one visit
Explore →Roof, structure and switchgear
Explore →Terrain, build and operations
Explore →Roof and electrical, one visit
Explore →Stamped sets, six days from survey
Explore →SA, TOF and TSRF per plane
Explore →Every local fact on this page links to where it came from. Codes, programs and tariffs change: confirm the current requirement with the AHJ and the utility before you design.