Home / Solar site surveys / New Mexico
Solar site surveys · New MexicoA technician on the roof, in the attic and at the service panel, with the survey read against the code editions, AHJs and utilities that apply in New Mexico.
New Mexico adopts its construction codes statewide through the Construction Industries Division: the 2020 NEC (mandatory since September 2023) and a residential code based on the 2021 IRC, with the State Fire Marshal on the 2021 IFC. PNM and El Paso Electric offer net metering under a Public Regulation Commission rule, and the Solar Rights Act voids covenants that effectively ban solar. Surveys should expect intense sun, modest snow loads in Albuquerque, and city or county permitting.
The capture spec is the same everywhere. What the engineer and the plan reviewer read it against is not.
PNM's process starts with checking capacity availability on its online map, then design, application, technical review and inspections before permission to operate, and new systems need IEEE 1547-2018 inverters.7
Albuquerque's Building Safety handouts use a 20 psf ground snow load and a 16-inch frost depth; outside the city, loads follow the jurisdiction's design criteria and elevation.8,9
Albuquerque asks for a New Mexico structural engineer's review of the existing roof when there is more than one roof covering, when point loads exceed 45 pounds or a member carries more than 200 pounds of added load, or when framing is over-spanned.6
Associations may regulate solar but not in a way that effectively prohibits it, and a recorded solar right can protect access to sunlight from later obstructions.10
Who reviews the plan set, and what the state layers on top.
The utility decides the interconnection path and what an exported kilowatt-hour is worth.
The state's largest electric utility, serving more than 550,000 customers in greater Albuquerque, Rio Rancho, Santa Fe and other communities. Applications go online through PNM's customer solar program, and since April 1, 2024 new systems must use inverters that meet IEEE 1547-2018.15,7
Interconnection page ↗Serves southern New Mexico, including Las Cruces. Small systems apply through EPE's online portal with a $150 fee, and net metering is limited to systems expected to produce no more than 120% of the customer's annual use.16
Interconnection page ↗One standard, one visit, the same record in New Mexico as everywhere else. What it gets checked against is the code stack above.
The 2020 NEC, adopted statewide as the 2020 New Mexico Electrical Code (14.10.4 NMAC), effective March 28, 2023 and mandatory for permits after September 28, 2023. Some secondary sites list the 2023 NEC, but the state's rule and CID's code list still show 2020 as of September 2026.1,2
For systems of 10 kW or less, PNM credits net excess generation as kWh credits on the next bill that do not expire, and pays any remaining credits at Rate 12 when the account closes; larger systems are paid for excess energy at Rate 12 each month.18,17
No. Under the Solar Rights Act, covenants that effectively prohibit solar collectors are void, though associations may still set rules that do not amount to a prohibition.10
Yes. The New Solar Market Development Tax Credit pays 10% of eligible costs, up to $6,000 per taxpayer, for systems installed from 2025 through 2031, while the $30 million annual cap lasts.14
EPE limits net metering to systems expected to produce no more than 120% of the customer's annual consumption, and small systems apply online with a $150 fee before a bi-directional meter is installed.16
Metro pages for New Mexico: Albuquerque.
Roof, attic and service panel in one visit
Explore →Roof, structure and switchgear
Explore →Terrain, build and operations
Explore →Roof and electrical, one visit
Explore →Stamped sets, six days from survey
Explore →SA, TOF and TSRF per plane
Explore →Every local fact on this page links to where it came from. Codes, programs and tariffs change: confirm the current requirement with the AHJ and the utility before you design.
Bring your monthly job count and the AHJs you submit into, and we will tell you straight whether we fit.
Book a 15-min callIn-person site surveys, engineering and inspection for residential, C&I and utility-scale solar, delivered as live data.