Home / Solar site surveys / Missouri / St. Louis
Solar site surveys · St. Louis, MORoof, attic and service panel captured in one visit, with the plan set built for the St. Louis AHJ you submit into and the utility that serves the address.
In the City of St. Louis, the Building Division issues the building permit for solar and a licensed electrical contractor pulls the electrical permit, under the 2018 I-Codes and the 2017 NEC. Properties in local historic districts also go through Cultural Resources Office review, which may require panels to be hidden from public view. St. Louis County covers unincorporated areas under its own, older code set, and Ameren Missouri handles interconnection.
Missouri state rules apply here, plus whatever the local AHJ amends.
Some St. Louis historic districts require panels to be invisible from public areas, while others allow limited visibility; a non-historic addition on the same lot is the preferred location when one exists.5
Since January 23, 2020, the city's solar-ready ordinance requires new homes and commercial buildings to show on plans how a future solar system could be installed.6,7
St. Louis County's bracing guide sets a 90 mph wind speed and Seismic Design Category C for one- and two-family homes.8
In St. Louis County, the local fire protection district may check clearances and pathways around panels in addition to the county's permit review.3
The main AHJs, and how the rest of the metro splits up.
Solar installation needs a building permit, and a licensed electrical contractor must obtain a separate electrical permit for the connection to the existing electrical system; the city enforces the 2018 IBC, IRC and IFC and the 2017 NEC.9,1,10
Official page ↗In local historic districts, solar is reviewed against each district's standards and the Preservation Board's policy, which uses either a no-visibility or a visual-compatibility test; submittals include a site plan, a roof installation plan with a section, and photos from the sidewalk and street.5,11
Official page ↗The county's residential solar checklist is based on the 2015 IRC as amended by county ordinance, requires structural and electrical permits before work starts, and asks for electronically submitted plans with each array dimensioned on the roof plan.3
Official page ↗Many St. Louis County municipalities adopt their own code editions, while the county handles unincorporated areas; St. Charles County cities such as Lake Saint Louis have moved to 2021 codes, and Illinois suburbs across the river follow Illinois rules and Ameren Illinois.3,12
Ameren Missouri serves the City of St. Louis, and the city points residents to Ameren for utility incentives and community solar.7,16
The investor-owned utility serving the City of St. Louis, based in St. Louis. Customers or installers apply online for interconnection and net metering, net-metering agreements are capped at 100 kW, and net excess energy is credited at an avoided fuel cost of 3.84 cents per kWh in summer and 3.39 cents in winter under the tariff effective March 1, 2025.16,17,7
Interconnection page ↗The same capture standard as every other Missouri job, so the plan set is built on what the technician verified on site.
A building permit for the installation plus an electrical permit obtained by a licensed electrical contractor.9,10
The 2018 IBC, IRC and IFC and the 2017 NEC, all adopted effective August 1, 2018.1
Yes, with Cultural Resources Office review; depending on the district, panels must either be invisible from public areas or visually compatible with the building.5,11
Net excess energy is credited at avoided fuel cost, 3.84 cents per kWh in summer and 3.39 cents in winter under the tariff effective March 1, 2025.17
St. Louis County Transportation and Public Works, using a checklist based on the 2015 IRC with county amendments; the local fire protection district may also review pathways.3
State-level detail is on the Missouri page; every location is on the solar site survey hub.
Roof, attic and service panel in one visit
Explore →Roof, structure and switchgear
Explore →Terrain, build and operations
Explore →Roof and electrical, one visit
Explore →Stamped sets, six days from survey
Explore →SA, TOF and TSRF per plane
Explore →Every local fact on this page links to where it came from. Codes, programs and tariffs change: confirm the current requirement with the AHJ and the utility before you design.