Home / Solar site surveys / Maryland / Baltimore
Solar site surveys · Baltimore, MDRoof, attic and service panel captured in one visit, with the plan set built for the Baltimore AHJ you submit into and the utility that serves the address.
Baltimore City permits solar through DHCD's E-Permits portal under its own Building, Fire, and Related Codes (2021 IRC and IFC, 2020 NEC), with historic district properties referred to CHAP. Baltimore County is a separate AHJ on the 2021 codes and the 2026 NEC, needing a building permit only for systems of 10 kW or more. BGE handles interconnection, and the city designs for a 30 psf ground snow load.
Maryland state rules apply here, plus whatever the local AHJ amends.
Baltimore City's IRC design table sets a 30 psf ground snow load, which drives the structural check of existing rafters under a new array.12
The city applies the IFC's PV access and pathway rules to Group R-3 buildings without the model code's exceptions, so confirm with DHCD how pathways apply to the roof in question.10
A job in Baltimore County after August 31, 2026 is designed to the 2026 NEC, while a job across the line in the city is designed to the 2020 NEC.2,13
City permits on properties in CHAP historic districts are referred for preservation review after submission, which adds time.14
The main AHJs, and how the rest of the metro splits up.
Permits are filed through the E-Permits portal or in person at 417 E. Fayette St. Applications on properties in City historic districts (CHAP), floodplains or design review areas are referred to other agencies after submission. The city's 2024 Building, Fire, and Related Codes, effective May 22, 2024, adopt the 2021 IRC and IFC and the 2020 NEC.14,1
Official page ↗A building permit is required for solar of 10 kW or more, with construction plans showing the roof-mounting detail; every system also needs an electrical permit from a master electrician licensed or registered with the county. Applications are online only, and sites within 3.3 miles of Martin State Airport need an airport zoning permit.15,16
Official page ↗Baltimore City and Baltimore County are separate jurisdictions with different code editions; communities such as Towson, Dundalk and Catonsville are unincorporated and permitted by Baltimore County. Each Maryland jurisdiction may amend the IBC and IRC locally.3,9
BGE, headquartered in Baltimore, delivers electricity across central Maryland and requires the local inspection certificate before a system can operate.21,20
Delivers electricity to more than 1.3 million customers in central Maryland. After approval BGE sends an interconnection agreement within five business days, and the customer returns a Certificate of Completion with proof of local inspection before operating.21,20
Interconnection page ↗The same capture standard as every other Maryland job, so the plan set is built on what the technician verified on site.
The 2020 NEC, adopted in the city's 2024 Building, Fire, and Related Codes (Ordinance 24-341, effective May 22, 2024).13,1
Only for systems of 10 kW or more; every solar installation needs an electrical permit from a county-registered master electrician.15
The city's IRC design table lists a 30 psf ground snow load.12
Through DHCD's E-Permits portal or in person at 417 E. Fayette St.; historic district and floodplain properties are referred to other agencies for review after you submit.14
A signed interconnection agreement and a returned Certificate of Completion with proof that the local inspection authority approved the installation.20
State-level detail is on the Maryland page; every location is on the solar site survey hub.
Roof, attic and service panel in one visit
Explore →Roof, structure and switchgear
Explore →Terrain, build and operations
Explore →Roof and electrical, one visit
Explore →Stamped sets, six days from survey
Explore →SA, TOF and TSRF per plane
Explore →Every local fact on this page links to where it came from. Codes, programs and tariffs change: confirm the current requirement with the AHJ and the utility before you design.
Bring your monthly job count and the AHJs you submit into, and we will tell you straight whether we fit.
Book a 15-min callIn-person site surveys, engineering and inspection for residential, C&I and utility-scale solar, delivered as live data.