Home / Solar site surveys / Indiana
Solar site surveys · IndianaA technician on the roof, in the attic and at the service panel, with the survey read against the code editions, AHJs and utilities that apply in Indiana.
Indiana writes one statewide code set through the Fire Prevention and Building Safety Commission, and as of September 2026 the electrical code in force is still the 2009 Indiana Electrical Code built on the 2008 NEC; a 2023 NEC update had its public hearing in July 2026 but is not yet final. Homes follow the 2020 Indiana Residential Code (2018 IRC), whose R324.6 roof pathways apply, and new solar at the large investor-owned utilities earns Excess Distributed Generation credits under instantaneous netting instead of net metering.
The capture spec is the same everywhere. What the engineer and the plan reviewer read it against is not.
The state residential code lists a 115 mph design wind speed for every county and a 20 psf ground snow load for most of central and southern Indiana, rising to 30 psf in northern counties such as Lake, Elkhart and DeKalb.4
Because the state electrical code still rests on the 2008 NEC, rapid-shutdown and labeling details can differ from what installers see in states on the 2020 or 2023 NEC; the pending 2023 NEC update would close that gap once it takes effect.1,2
For homes, R324.6 of the 2018 IRC applies as adopted: 36-inch eave-to-ridge pathways and 18- or 36-inch ridge setbacks depending on array coverage, with an exception for roofs of 2:12 or flatter.4
Who reviews the plan set, and what the state layers on top.
The utility decides the interconnection path and what an exported kilowatt-hour is worth.
Indiana's largest electric utility, serving about 928,000 customers in 69 of the state's 92 counties. The IURC approved its excess distributed generation tariff with instantaneous netting in Cause No. 45508 in July 2022.11,12
Interconnection page ↗Serves more than 500,000 customers in Indianapolis and nearby parts of central Indiana. Level 1 applications (up to 10 kW, no fee) cover most homes, inverters must meet IEEE 1547-2018 and UL 1741, and systems installed after June 30, 2022 are credited under Rider 16, Rate EDG.13,14,15
Interconnection page ↗Serves roughly 500,000 electric customers across northern Indiana. New customer generation up to 1 MW (or the customer's average annual use, if smaller) goes on its Excess Distributed Generation tariff, and Level 1 interconnection covers systems up to 25 kW with no fee.16,17
Interconnection page ↗One standard, one visit, the same record in Indiana as everywhere else. What it gets checked against is the code stack above.
As of September 2026, the 2009 Indiana Electrical Code based on the 2008 NEC. A rule adopting the 2023 NEC had its public hearing on July 23, 2026 but was not yet final, so check the edition in force on your permit date.1,3
Not at the large investor-owned utilities. Systems installed after June 30, 2022 are credited under Excess Distributed Generation tariffs at 1.25 times the utility's prior-year average marginal energy price, measured by instantaneous netting.15,18,19
The 2020 Indiana Residential Code adopts the 2018 IRC's R324.6 unamended: at least two 36-inch pathways from eave to ridge and 18-inch ridge clearances, growing to 36 inches when panels cover more than a third of the roof.4
Only in narrow cases. Under Indiana Code 32-25.5-3.5, a homeowner can petition neighbors, and once 65% of members (or fewer, if the covenants need fewer to amend) sign, the board cannot deny the request.8
The state residential code sets 20 psf for most counties, including Marion, and 30 psf in several northern counties; confirm the county value and any engineer's site-specific load.4
Metro pages for Indiana: Indianapolis.
Roof, attic and service panel in one visit
Explore →Roof, structure and switchgear
Explore →Terrain, build and operations
Explore →Roof and electrical, one visit
Explore →Stamped sets, six days from survey
Explore →SA, TOF and TSRF per plane
Explore →Every local fact on this page links to where it came from. Codes, programs and tariffs change: confirm the current requirement with the AHJ and the utility before you design.
Bring your monthly job count and the AHJs you submit into, and we will tell you straight whether we fit.