Home / Solar site surveys / Illinois / Chicago
Solar site surveys · Chicago, ILRoof, attic and service panel captured in one visit, with the plan set built for the Chicago AHJ you submit into and the utility that serves the address.
In Chicago, most home rooftop systems up to 13.44 kW can use the Department of Buildings' online Express Permit Program, with drawings by an Illinois-licensed architect or structural engineer who must first inspect the roof structure and electrical system in person. The city applies its own Chicago Electrical Code, 2019 Chicago Building Code and a fire code that moved to the 2024 IFC in 2026, and ComEd handles interconnection. Suburbs are separate AHJs.
Illinois state rules apply here, plus whatever the local AHJ amends.
Chicago's code sets a 25 psf ground snow load and a 107 mph basic design wind speed for Risk Category II buildings, which feed the structural check of the existing roof.10
Before an express permit application, the architect or structural engineer (or someone under their control) must inspect the property in person to confirm the roof structure's capacity and the condition of the electrical system, and existing grounding or bonding defects must be fixed before connection.8
City zoning guidance caps flat-roof arrays at 9 feet tall or 5 feet above the parapet, whichever is lower, and keeps pitched-roof panels flush within 12 inches of the roof and below the ridge; ballasted arrays are not allowed on sloped roofs under the express permit.11,2
The main AHJs, and how the rest of the metro splits up.
Rooftop PV with an inverter output of 13.44 kW or less, plus storage up to 20 kWh, can be permitted through the online Express Permit Program; it needs a licensed general and electrical contractor, an ICC-certified installer, and drawings from an Illinois-licensed architect or structural engineer. Larger systems, ballasted arrays on sloped roofs, and roofs averaging over 40 feet are not eligible.2,8,13
Official page ↗Solar on a designated or proposed Chicago Landmark or in a landmark district gets a separate design review by the Historic Preservation Division, which staffs the Commission on Chicago Landmarks and encourages a pre-permit review.12,11
Official page ↗Handles unincorporated Cook County; residential PV permits need a roof plan with array dimensions, a licensed architect or structural engineer's roof adequacy report, a single-line diagram, and a registered Cook County electrical contractor.9
Official page ↗Each suburb that has adopted a building code is its own permitting AHJ, subject to the state's baseline-code law; Skokie, for example, requires a building permit and aims to review solar applications within three business days. Cook County covers its unincorporated areas.7,14,9
ComEd delivers power in Chicago and across most of northern Illinois, and Chicago's express permit allows one installation per ComEd service connection. Homes served by a municipal electric system or co-op follow that utility's rules instead.18,8,19
Serves about 3.8 million customers across northern Illinois, including Chicago. Interconnection follows ICC Part 466 and is filed online; Level 1 covers lab-certified systems with export of 25 kW or less and nameplate of 50 kW or less for a $50 fee, and net metering starts once ComEd approves the application and signs the Certificate of Completion.18,20,21
Interconnection page ↗The same capture standard as every other Illinois job, so the plan set is built on what the technician verified on site.
Yes for most home systems: rooftop PV with an inverter output of 13.44 kW or less (and storage up to 20 kWh) can use the Express Permit Program, which replaced the old Solar Express Permit process in November 2023.2,13
The Chicago Electrical Code, based on the 2017 NEC with Chicago amendments; Section 14E-6-690 covers PV. Work follows the edition in effect when the permit application was submitted.1,2,8
Under the express permit terms, at least 3 feet on residential buildings and 4 feet on non-residential or mixed-use buildings, with fire code pathways under the city's amended IFC Section 1205.8,4
For a new installation, yes: drawings and calculations by an Illinois-licensed architect or structural engineer, who must first inspect the roof structure and electrical system in person.2,8
The Chicago Building Code uses a 25 psf ground snow load and a 107 mph basic design wind speed for Risk Category II structures.10
State-level detail is on the Illinois page; every location is on the solar site survey hub.
Roof, attic and service panel in one visit
Explore →Roof, structure and switchgear
Explore →Terrain, build and operations
Explore →Roof and electrical, one visit
Explore →Stamped sets, six days from survey
Explore →SA, TOF and TSRF per plane
Explore →Every local fact on this page links to where it came from. Codes, programs and tariffs change: confirm the current requirement with the AHJ and the utility before you design.
Bring your monthly job count and the AHJs you submit into, and we will tell you straight whether we fit.
Book a 15-min callIn-person site surveys, engineering and inspection for residential, C&I and utility-scale solar, delivered as live data.