Residential

OverviewRooftop PV at volumeRoof & dronePlanes measured on the roofAttic & structureRafters recordedElectricalPanel and interconnectionDesign & engineeringModel to stamped set

Commercial & Industrial

OverviewBig roofs, real structureOn-site surveyRoof, structure, switchgearDesign & engineeringPE stampedVisual inspectionModule resolutionThermal inspectionFaults as heatElectroluminescenceCell-level cracks

Utility-Scale

OverviewThousands of acresLiDAR topographyTerrain before earthworkLand surveyingBoundary and topographicConstruction monitoringProgress, measuredThermal & ELEvery string

Across every scale

Site surveysRoof and electrical, one visitPermitting & engineeringStamped plan setsInspectionAerial thermal and ELShading analysisSA, TOF and TSRFSurvey locationsState and metro guides

The platform

Platform overviewPortal, 3D models, live dataShading analysisMove the sun yourselfCost calculatorWhat bad field data costs you

Sign in

Vanguard AccessInvite only · survey data portalScheduling & DispatchCrewLink · all verticals

Field Notes · build vs. buy

What a survey really costsPart 01 · the full modelUtilization is the whole gamePart 02 · a real TuesdayThe break-even headcountWhen hiring pays offTwo technicians, two roofsVariance, measuredThe hybrid crewIn-house plus outsourced

Field Notes · reference

Site survey checklistBuilt backwards from reworkHow long a survey takesHour by hourDo panels need a permit?What goes in the packageStorage site surveysThe capture listCompare survey vendorsQuestions to ask any vendor

Company

All servicesAll Field NotesAboutBook a 15-min call

Home  /  Solar site surveys  /  California

Solar site surveys · California

Solar site surveys in California

A technician on the roof, in the attic and at the service panel, with the survey read against the code editions, AHJs and utilities that apply in California.

NEC 2023Electrical code in effect
8Utilities covered here
48 hrsSurvey to deliverable
Nationwide500+ technicians
Short answer

California writes one statewide building code (Title 24), and the 2025 edition, which includes an electrical code based on the 2023 NEC, applies to permit applications filed on or after January 1, 2026. Cities and counties issue the permits. State law requires streamlined review for small rooftop systems, and most larger jurisdictions must offer automated online permitting. A site survey has to capture fire-access pathways, roof structure, wildfire-zone requirements, and which utility serves the address, because the investor-owned utilities and the municipal utilities pay for exported power under different rules.

What changes in California

The capture spec is the same everywhere. What the engineer and the plan reviewer read it against is not.

CA · METROSLos Angeles
Code stack
2023NEC 2023National Electrical Code · effective Jan 1, 2026. The 2025 California Electrical Code (Title 24, Part 3) adopts the 2023 NEC with California amendments and applies statewide from January 1, 2026. It replaced the 2022 edition, which was based on the 2020 NEC. Some cities, such as Los Angeles, publish their own amended local version.1,2,3,4
2025CRC 2025The 2025 California Residential Code (Title 24, Part 2.5) is based on the 2024 IRC with state amendments. It covers one- and two-family dwellings and took effect January 1, 2026.5,4
2025CFC 2025The 2025 California Fire Code (Title 24, Part 9) is based on the 2024 IFC with state amendments and took effect January 1, 2026. Local fire agencies may adopt further amendments.6,4
2025Energy Code 2025Since the 2019 standards took effect in 2020, California has required solar PV on newly built low-rise homes. Under the 2025 Energy Code, most new single-family homes still need PV (Section 150.1(c)14) and must be battery-ready in many cases. The code applies to permit applications filed on or after January 1, 2026.7,8,9
Rooftop fire access. For homes, the CRC sets firefighter access rules for rooftop PV. There must be at least two 36-inch pathways from eave to ridge on separate roof planes, with at least one on the street or driveway side. The clear setback on each side of a horizontal ridge is 18 inches when the array covers 33% or less of the plan-view roof area and 36 inches when it covers more. No panels may sit below an emergency escape opening. These provisions were R324.6 in the 2022 CRC, and City of Berkeley's 2025-code checklist cites them as R329.6. Local fire departments such as LAFD may add their own requirements.10,11,12

Climate and site factors

Seismic

Much of California, especially the Los Angeles region, has high earthquake risk. Rack attachments and ballasted arrays are designed for seismic as well as wind loads, and LADBS requires SEAOC PV1 seismic methods for unattached ballasted arrays.13,12

Wildfire zones

In wildland-urban interface areas, CBC Chapter 7A materials rules apply, and CAL FIRE maps Fire Hazard Severity Zones from Moderate to Very High. Where Class A roofing is required, such as Very High zones in Los Angeles, the PV and racking assembly must carry a Class A fire rating.14,15,12

Roof types

The state Solar Permitting Guidebook treats clay and concrete tile as its own roof category, assuming a heavier roof assembly weight of about 20 psf. Tile roofs therefore need their own structural check and attachment details during the survey.16

Cool roofs

The Title 24 Part 6 Energy Code sets cool-roof reflectance rules for new roofs and many reroofs, which vary by climate zone and roof slope. Record the roofing material and condition, since reroofing before a solar install can trigger these rules.17,18

HOAs

Civil Code 714 limits homeowner associations to reasonable restrictions and a 45-day decision window. The survey should still note HOA placement preferences when they do not reduce output or add much cost.19

Permitting in California

Who reviews the plan set, and what the state layers on top.

Utilities and interconnection

The CPUC regulates the three large investor-owned utilities (PG&E, SCE, SDG&E), and its net billing tariff applies only to them. Municipal utilities such as LADWP, SMUD, Pasadena, Glendale and Burbank set their own interconnection and export rules.25

Pacific Gas and Electric PG&E

PG&E is the investor-owned utility for most of Northern and Central California. Rooftop solar connects under CPUC Electric Rule 21 through PG&E's online interconnection portal.26,27

Interconnection page ↗

Southern California Edison SCE

SCE is the investor-owned utility for much of central, coastal and Southern California, including most Los Angeles-area cities outside the City of LA. It interconnects rooftop solar under Rule 21, and new customers go on the Solar Billing Plan.28,29

Interconnection page ↗

San Diego Gas & Electric SDG&E

SDG&E is the investor-owned utility for San Diego and southern Orange counties. Residential solar and storage connect under Electric Rule 21 through SDG&E's online interconnection portal.30,31

Interconnection page ↗

Los Angeles Department of Water and Power LADWP

LADWP is the City of Los Angeles's municipal utility and sets its own solar rules outside the CPUC net billing tariff. It runs its own tiered interconnection process: Type 1 covers PV and battery projects up to 30 kW.32,33

Interconnection page ↗

Sacramento Municipal Utility District SMUD

SMUD is the Sacramento region's public utility. It has its own online interconnection process and a Solar and Storage Rate that pays a flat per-kWh price for exported energy.34

Interconnection page ↗

Pasadena Water and Power PWP

PWP is Pasadena's municipal utility. Installers apply through PowerClerk, PWP reviews and inspects the system, and PWP installs a bi-directional meter before granting permission to operate.35

Interconnection page ↗

Glendale Water & Power GWP

GWP is Glendale's municipal utility and still offers net energy metering. Interconnection and NEM applications go through PowerClerk with the plan set attached.36

Interconnection page ↗

Burbank Water and Power BWP

BWP is Burbank's municipal utility. Installers get a meter spot and confirmation number from BWP before pulling a city permit. Permits filed on or after January 1, 2026 fall under BWP's Solar Net Billing program.37,38

Interconnection page ↗
Export compensation. Since April 15, 2023, new PG&E, SCE and SDG&E solar customers take service on the CPUC Net Billing Tariff. It credits exports at hourly values from the Avoided Cost Calculator, which are usually below retail rates, and older NEM customers keep their tariff for 20 years from interconnection. Municipal utilities differ: as of September 2026, LADWP and GWP run their own net metering programs, SMUD pays a flat export rate, and Burbank moved new permits to avoided-cost net billing on January 1, 2026.25,34,37,36

What we capture on every California survey

One standard, one visit, the same record in California as everywhere else. What it gets checked against is the code stack above.

Roof and structure

  • Measured roof planes: pitch, azimuth, dimensions
  • Every penetration and obstruction, located
  • Rafter or truss size, spacing and span
  • Decking type and condition
  • Layer count at a cut edge
  • Setbacks and fire pathway constraints
  • Horizon shading capture per array area

Electrical and interconnection

  • Main breaker and bus bar rating, photographed separately
  • Meter location and configuration
  • Slot count: used, open, tandem, double-tapped
  • Available interconnection points
  • Existing loads and sub-panels
  • Conduit route, measured along the actual path
  • Grounding electrode and bonding path

Commercial buildings

  • Membrane type, age and condition, with drainage pattern
  • Bar joist depth, spacing and span
  • Deck type and gauge
  • Switchgear and available bus capacity
  • Access and lift constraints for the install crew

Every visit

  • Roof and electrical in one visit, no second trip
  • 48-hour turnaround from survey to deliverable
  • Photo documentation throughout
  • Permit sets available, stamped, 6 days from survey

California solar survey FAQ

Which NEC edition applies to solar in California?

Since January 1, 2026, the 2025 California Electrical Code applies, and it is based on the 2023 NEC with state amendments. Projects permitted under the 2022 code followed the 2020 NEC. Some cities publish their own amended local version, so check with the AHJ.1,4

What roof setbacks does California require for residential PV?

The residential code requires two 36-inch eave-to-ridge pathways on separate roof planes. The ridge setback on each side is 18 inches when the array covers 33% or less of the plan-view roof area and 36 inches above that, and panels cannot sit below an emergency escape opening. Local fire departments may have additional requirements.10,11

Do California cities have to offer instant solar permits?

Under SB 379, most cities and counties must run an automated online platform, such as SolarAPP+, that issues permits in real time for residential solar up to 38.4 kW, with or without storage. Small cities under 5,000 people and counties under 150,000 are exempt.21,22

How are solar exports paid under NEM 3.0?

For PG&E, SCE and SDG&E customers who applied on or after April 15, 2023, the Net Billing Tariff credits exports at hourly avoided-cost values, which are usually lower than retail rates. Municipal utilities such as LADWP and SMUD are not covered by it and set their own rules.25

Can an HOA block solar in California?

Generally no. Civil Code 714 voids HOA rules that effectively prohibit solar and allows only reasonable restrictions that do not add much cost or cut efficiency by more than 10%. HOAs must act within 45 days, or the application is deemed approved.19

Services and further reading

Metro pages for California: Los Angeles.

From Field Notes

Sources

Every local fact on this page links to where it came from. Codes, programs and tariffs change: confirm the current requirement with the AHJ and the utility before you design.

  1. https://up.codes/viewer/california/ca-electric-code-2025
  2. https://www.dgs.ca.gov/-/media/Divisions/BSC/02-Codes/Errta-01012026-Pt3-CEC-locked.pdf
  3. https://up.codes/viewer/california/ca-electric-code-2022
  4. https://www.dgs.ca.gov/BSC/Codes
  5. https://up.codes/viewer/california/ca-residential-code-2025
  6. https://up.codes/viewer/california/ca-fire-code-2025
  7. https://www.energy.ca.gov/programs-and-topics/programs/building-energy-efficiency-standards/energy-code-support-center-12
  8. https://www.energy.ca.gov/programs-and-topics/programs/building-energy-efficiency-standards/2025-building-energy-efficiency
  9. https://www.energy.ca.gov/sites/default/files/2021-09/2019%20PV%20Systems_ADA.pdf
  10. https://berkeleyca.gov/sites/default/files/documents/166%20CCC%20-%20Solar%20Photovoltaic_2.pdf
  11. https://codes.iccsafe.org/s/CARC2022P1/chapter-3-building-planning/CARC2022P1-Pt03-Ch03-SecR324.6
  12. https://dbs.lacity.gov/sites/default/files/efs/forms/pc17/ib-p-gi-2020-027.pdf
  13. https://www.usgs.gov/publications/evaluating-earthquake-hazards-los-angeles-region-earth-science-perspective
  14. https://osfm.fire.ca.gov/what-we-do/code-development-and-analysis/wildland-hazards-and-building-codes
  15. https://osfm.fire.ca.gov/what-we-do/community-wildfire-preparedness-and-mitigation/fire-hazard-severity-zones
  16. https://lci.ca.gov/docs/20190226-Solar_Permitting_Guidebook_4th_Edition.pdf
  17. https://www.energy.ca.gov/sites/default/files/2023-08/2022_Res_SF_Cool_Roof_ada.pdf
  18. https://www.energy.ca.gov/sites/default/files/2025-07/03_BuildingEnvelope_ada.pdf
  19. https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=714
  20. https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=GOV&sectionNum=65850.5
  21. https://leginfo.legislature.ca.gov/faces/billTextClient.xhtml?bill_id=202120220SB379
  22. https://www.energy.ca.gov/programs-and-topics/programs/residential-solar-permit-reporting-program-sb-379/residential-solar
  23. https://www.energy.ca.gov/programs-and-topics/programs/california-automated-permit-processing-program-calapp
  24. https://permits.lacounty.gov/permits/building-and-safety/
  25. https://www.cpuc.ca.gov/industries-and-topics/electrical-energy/demand-side-management/customer-generation/net-energy-metering-and-net-billing
  26. https://www.pge.com/en/featured/pge-service-area.html
  27. https://www.pge.com/en/about/doing-business-with-pge/interconnections/interconnections-and-renewables.html
  28. https://www.sce.com/about-sce
  29. https://www.sce.com/clean-energy-efficiency/solar-generation-storage
  30. https://www.sdge.com/more-information/our-company
  31. https://www.sdge.com/more-information/customer-generation/electric-rule-21
  32. https://www.ladwp.com/who-we-are
  33. https://www.ladwp.com/commercial-services/programs-and-rebates-commercial/commercial-solar-programs/type-1-2-and-3-interconnection
  34. https://www.smud.org/Going-Green/Solar-for-Your-Home
  35. https://pwp.cityofpasadena.net/solar-application-instructions/
  36. https://www.glendaleca.gov/government/departments/glendale-water-and-power/solar-education/guide-for-applying-for-interconnection
  37. https://www.burbankwaterandpower.com/solar-net-billing
  38. https://www.burbankwaterandpower.com/conservation/solar-power/solar-installer-instructions

Researched September 29, 2026.

Talk through your next California site in 15 minutes

Bring your monthly job count and the AHJs you submit into, and we will tell you straight whether we fit.

Book a 15-min call
Book a 15-min call