Residential

OverviewRooftop PV at volumeRoof & dronePlanes measured on the roofAttic & structureRafters recordedElectricalPanel and interconnectionDesign & engineeringModel to stamped set

Commercial & Industrial

OverviewBig roofs, real structureOn-site surveyRoof, structure, switchgearDesign & engineeringPE stampedVisual inspectionModule resolutionThermal inspectionFaults as heatElectroluminescenceCell-level cracks

Utility-Scale

OverviewThousands of acresLiDAR topographyTerrain before earthworkLand surveyingBoundary and topographicConstruction monitoringProgress, measuredThermal & ELEvery string

Across every scale

Site surveysRoof and electrical, one visitPermitting & engineeringStamped plan setsInspectionAerial thermal and ELShading analysisSA, TOF and TSRFSurvey locationsState and metro guides

The platform

Platform overviewPortal, 3D models, live dataFeature guidesWho it serves and how it worksShading analysisMove the sun yourselfCost calculatorWhat bad field data costs you

Sign in

Vanguard AccessInvite only · survey data portalScheduling & DispatchCrewLink · all verticals

Solar reference

Solar questions answeredResidential, commercial and utility-scaleSurvey methodologySources, measurements and limitsCompany factsOfficial services and capabilities

Field Notes · build vs. buy

What a survey really costsPart 01 · the full modelUtilization is the whole gamePart 02 · a real TuesdayThe break-even headcountWhen hiring pays offTwo technicians, two roofsVariance, measuredThe hybrid crewIn-house plus outsourced

Field Notes · reference

Site survey checklistBuilt backwards from reworkHow long a survey takesHour by hourDo panels need a permit?What goes in the packageStorage site surveysThe capture listCompare survey vendorsQuestions to ask any vendor

Company

All servicesAll Field NotesAboutBook a 15-min call

Home / Solar markets / Austin

Residential sales & installation · Reviewed October 6, 2026

Austin Solar Sales & Installation: Before You Start

Separate Texas sales credentials, Austin permit responsibilities and Austin Energy program participation before your first project.

Austin / preparation map
  1. 01Know your role
  2. 02Verify local requirements
  3. 03Test delivery economics

Editorial workflow illustration; no customer data or approval implied.

Scope before you use this guide

For businesses preparing to sell residential solar or install systems in Austin. This is not a guide to selling a solar-equipped home. City boundaries, utility territories, activity and project scope control which rules apply. Commercial and utility-scale projects need separate review.

Official requirements below are selected current checkpoints, with nearby primary sources. The planning worksheets and business judgments are editorial advice. Use them to obtain a complete activity-specific determination from the authorities and your advisers; this page cannot certify that every obligation is satisfied.

Your local approval checkpoints

Identify the retailer entity

Confirm whether your model requires TDLR retailer registration. The application includes insurance, ownership and responsible-record-keeper requirements; verify the actual entity status before selling. Do not treat a partner’s registration as your own.

TDLR: residential solar retailer registration

Check each salesperson

Resolve the registration and registered-employer relationship for the people making offers. An application awaiting issuance is not evidence of completed registration.

TDLR: residential solar salesperson registration

Approve the contract and cancellation package

TDLR identifies sales and installation contract provisions and a five-business-day cancellation rule, including how notice is supplied. Have counsel confirm applicability, exemptions and all other rules for your actual offer and sales channel.

TDLR: requirements and effective dates

Read transition notices narrowly

As reviewed October 6, 2026, TDLR suspends enforcement of §71.41 disclosures and §71.43 educational materials until November 1, 2026. That notice does not suspend the whole registration program. Assign someone to recheck it before launch.

TDLR: current residential solar notices

Complete the applicable City contractor registration

Austin requires contractor registration with Building and Trade Contractor Services before obtaining its building or trade permits. Confirm your licensed trade role, account linkage and assigned permit responsibility; general business setup remains a separate task.

Austin: building and trade contractor services

Map the inspection and metering work before equipment goes in

Austin Energy identifies an Auxiliary Power electrical permit, inspection requests through AB+C and final inspection before operation. Obtain rough inspection for work to be concealed. If meter placement cannot meet its design criteria, request a variance before installing equipment; approval is not assured.

Austin Energy: solar and battery inspections

If offering incentives, qualify for the program

Austin Energy’s participating-contractor process includes City vendor and electrical registration, rebate-system registration and online training. Confirm completed participation and current guidelines before promising incentive access. Program participation does not replace state credentials or project approvals.

Austin Energy: participating solar contractor process

Use the customer’s actual solar billing arrangement

Austin Energy describes crediting metered solar production and charging consumption separately. Excess credits carry forward but are non-transferable and apply only to electric charges. Verify current account terms and dated rates before using them in a proposal.

Austin Energy: Value of Solar billing

Before your first sale or installation

  1. Define the activity. List sales, lead generation, contracting, electrical work, storage, roofing and service separately. Assign a legal entity and responsible person to each. A referral partner does not automatically authorize your company to offer regulated work.
  2. Set up the business and channels. Confirm entity registration or foreign qualification, tax accounts, business-location zoning, local activity permits and solicitation rules with the relevant agencies. Have counsel review your actual door-to-door, phone, text and online lead practices before using them.
  3. Fund and staff the work. Have advisers confirm applicable bonds, insurance, workers’ compensation, employment classifications, safety training and subcontract terms. Budget from written supplier and provider quotes, not an assumed market-wide margin.
  4. Review the consumer offer. Approve contracts, cancellation notices, language access, financing disclosures, complaint handling and substantiation of savings claims for this jurisdiction. Recheck incentive eligibility at proposal time; keep unconfirmed incentives out of guaranteed totals.
  5. Build the site-to-design handoff. Define roof, attic and electrical evidence; identify who performs licensed design and engineering; record inaccessible areas and missing labels. Do not send a guessed equipment rating as a measured fact.
  6. Name the closeout owner. Assign permit corrections, utility authorization, customer education, warranty contacts and service follow-up. Retain the approved design, inspection results and utility operating notice as separate records.

A readiness record you can review

CheckpointEvidence before launch
Activity and entityNamed entity, role and regulator confirmation
People and credentialsCurrent status, permitted scope and expiry checks
Sales packageApproved script, contract version, disclosures and notices
Project routeParcel authority, permit path and serving utility
Delivery and serviceNamed owner, capacity, quote and warranty procedure
Unresolved itemQuestion, decision owner, evidence and hold status

Questions to settle

Does Austin Energy participation authorize my solar sales business?

No. Treat program eligibility, state sales roles and licensed installation as separate checks. Resolve each with the responsible authority.

Should an installer guess a meter variance will be accepted?

No. Obtain the actual decision before relying on the arrangement or promising a completion date.

Keep the market and the project connected

Existing homeowner approval guide · Utility and bill context

Solar Survey AI can discuss site survey scope, permitting and design handoffs and inspection scope. Use our evidence methodology to define verified inputs and limitations. Confirm actual coverage, availability and licensed responsibilities before contracting. We do not license your business, approve a permit or guarantee market success. Homeowner monitoring connections and planned remote diagnosis remain coming soon.

Primary sources and review

Reviewed October 6, 2026 by Solar Survey AI. Selected official sources inform the local checkpoints; tradeoffs and worksheets are our editorial analysis. No agency or utility endorsement is implied. Recheck dated notices before launch.

Plan the first site-to-design handoff.

Bring your intended service area, project types and required evidence. We can discuss the available survey scope and responsible design handoff.

Book a 15-min call
Book a 15-min call