Residential

OverviewRooftop PV at volumeRoof & dronePlanes measured on the roofAttic & structureRafters recordedElectricalPanel and interconnectionDesign & engineeringModel to stamped set

Commercial & Industrial

OverviewBig roofs, real structureOn-site surveyRoof, structure, switchgearDesign & engineeringPE stampedVisual inspectionModule resolutionThermal inspectionFaults as heatElectroluminescenceCell-level cracks

Utility-Scale

OverviewThousands of acresLiDAR topographyTerrain before earthworkLand surveyingBoundary and topographicConstruction monitoringProgress, measuredThermal & ELEvery string

Across every scale

Site surveysRoof and electrical, one visitPermitting & engineeringStamped plan setsInspectionAerial thermal and ELShading analysisSA, TOF and TSRFSurvey locationsState and metro guides

The platform

Platform overviewPortal, 3D models, live dataFeature guidesWho it serves and how it worksShading analysisMove the sun yourselfCost calculatorWhat bad field data costs you

Sign in

Vanguard AccessInvite only · survey data portalScheduling & DispatchCrewLink · all verticals

Solar reference

Solar questions answeredResidential, commercial and utility-scaleSurvey methodologySources, measurements and limitsCompany factsOfficial services and capabilities

Field Notes · build vs. buy

What a survey really costsPart 01 · the full modelUtilization is the whole gamePart 02 · a real TuesdayThe break-even headcountWhen hiring pays offTwo technicians, two roofsVariance, measuredThe hybrid crewIn-house plus outsourced

Field Notes · reference

Site survey checklistBuilt backwards from reworkHow long a survey takesHour by hourDo panels need a permit?What goes in the packageStorage site surveysThe capture listCompare survey vendorsQuestions to ask any vendor

Company

All servicesAll Field NotesAboutBook a 15-min call

Home / Homeowners

Homeowner education · reviewed 2026-10-07

Wattsmart Battery: Enrollment, Backup and Exit Records

Review Rocky Mountain Power Wattsmart battery eligibility, 2026 state notices, remote control, backup limits and exit terms. Keep enrollment evidence private.

Make the decision with evidence
  1. 01Ask the right questions
  2. 02Verify the assumptions
  3. 03Keep the records

Education, not a savings or approval guarantee.

Use this guide

Choose the questions relevant to your situation. Expand each answer, save the checklist and request written clarification where evidence is missing.

Questions homeowners ask

Which households should check this program’s current eligibility?

The overview identifies Rocky Mountain Power customers in Utah, Idaho and Wyoming and a list of eligible batteries. Confirm the actual model, approval timing and current state requirements; a battery’s brand name alone does not establish enrollment or an incentive.

Source: Rocky Mountain Power: Wattsmart residential enrollment and eligibility. Reviewed 2026-10-07.

Is a battery installation invoice enough to establish program approval?

No. The overview separates customer-generation review, installation, program application and verification that the utility can communicate with and dispatch the battery. Keep each confirmation. Ask about the relevant battery approval date before ordering or installing equipment.

Source: Rocky Mountain Power: Wattsmart residential enrollment and eligibility. Reviewed 2026-10-07.

Are the updated residential incentives based on stored kWh or output kW?

The Utah change notice uses single-battery output in kW: 10 kW or more corresponds to $2,000, and below 10 kW to $1,000. Multiple batteries do not earn multiple incentives. Verify actual eligibility and accepted output; stored-energy capacity in kWh is a different quantity.

Source: Rocky Mountain Power: Utah June 2026 Wattsmart change notice. Reviewed 2026-10-07.

Does the November 2026 onboarding date replace all earlier deadlines?

No. The Idaho/Wyoming notice requires a PowerClerk application by July 1, program application and PTO by October 1, and active onboarding by November 1 for the prior incentive treatment. On this guide’s October 7 review date, October 1 has passed. Ask the utility to confirm the actual records and applicable incentive.

Source: Rocky Mountain Power: Idaho and Wyoming July 2026 Wattsmart change notice. Reviewed 2026-10-07.

Does participation guarantee the battery will be ready for every outage?

No. The linked terms say only energy available when an outage begins can support backup and do not guarantee a charged or available battery during every outage. Have the installer explain the actual supported loads and design; do not rely exclusively on it for life-supporting equipment.

Source: Rocky Mountain Power: linked Wattsmart terms, all four pages. Reviewed 2026-10-07.

What control and connectivity obligations should I review?

The terms authorize remote charging, discharge and data access for the program and require reliable internet. An unresolved communication interruption after notice can lead to termination. Read the actual agreement, privacy policies and provider responsibilities before granting access; enrollment is more than a rebate application.

Source: Rocky Mountain Power: linked Wattsmart terms, all four pages. Reviewed 2026-10-07.

What should I check before leaving the program or selling the home?

The linked terms describe a four-year initial term, 30-day written termination notice and prorated repayment on early termination. For a sale, they require advance notice and written assumption if the parties agree; transfer is not automatic. Request the account-specific balance and accepted documents.

Source: Rocky Mountain Power: linked Wattsmart terms, all four pages. Reviewed 2026-10-07.

Your decision checklist

  • Confirm the utility, state, battery model and approval timing.
  • Keep customer-generation and Wattsmart decisions separately.
  • Record battery output in kW and stored capacity in kWh.
  • Identify which dated state incentive notice applies.
  • Review control, data, internet and service responsibilities.
  • Keep backup needs separate from incentive expectations.
  • Obtain exit, repayment and property-transfer instructions in writing.

Save or print this guide from your browser. Keep completed records privately.

Review the commitments behind a battery incentive

Original private homeowner participation organizer; not a utility enrollment form or legal interpretation of an individual contract.
RecordEvidence and next question
Eligibility recordUtility state, battery model, current approval-list check and written response about project timing. Keep customer identifiers private.
Application milestonesCustomer-generation submission, approval, PTO, program application and active-onboarding confirmation. Record completed and unresolved steps separately.
Incentive basisState notice, effective date, accepted single-battery output, number of batteries, applicable incentive and actual payment acknowledgment.
Bill-credit recordParticipation year, applicable terms, energy-charge line and monthly credit; ask how a cap or unused credit is applied.
Control and connectionResponsible utility/manufacturer, supported interface, data permissions, reliable internet, interruption notices and response record.
Backup designInstaller’s supported-load scope, usable stored energy, operating settings and separate plan for essential needs; a rebate is not a runtime guarantee.
Exit or home saleSigned agreement, remaining commitment, written balance, notice, accepted assignment if any and release or unresolved obligations.

Fictional proposal example: a quote lists 10 kWh of usable stored energy and labels the system “rebate eligible,” but omits output in kW, the exact model and a utility eligibility response. Ask for those missing records before comparing the incentive line with the equipment cost. The invented quote does not establish approved capacity, enrollment, backup duration or a payment.

Fictional home-sale example: a seller has a battery app login and a prior incentive payment, while the buyer’s folder has no accepted participation assignment. Ask the program administrator which signed documents and remaining obligations apply, then record its response separately from equipment ownership and monitoring access. A property closing or a new app account alone does not resolve the program agreement.

The Utah notice is effective June 15, 2026; the Idaho/Wyoming notice is effective July 1, 2026. Utah’s earlier PowerClerk milestone is June 15. Both also name October 1 application/PTO and November 1 active-participation milestones for the earlier treatment. Preserve the state-specific dates. Do not treat the remaining November milestone as permission to skip already-passed requirements or as the closing date for the entire program.

The state notices describe residential ongoing credits beginning in year two, applied to energy charges and split across monthly bills, with no monthly carryover and annual caps. Keep an upfront payment distinct from recurring credits and from the battery’s purchase price. Ask which participation year and notice apply to the actual account. Source: Utah change notice; reviewed October 7, 2026.

Reviewed October 7, 2026 against the current program overview, both complete state change notices and the complete linked terms. The terms contain an older incentive calculation example; do not substitute it for the newer state notices or the utility’s written offer. The overview also contains a tax discussion that this guide does not use. Confirm the applicable signed agreement and resolve conflicting documents with the utility before deciding. This guide concerns residential participation, not commercial incentive offers.

The organizer and fictional examples are editorial preparation aids. The program obligations summarized above come from the linked provider documents; they do not establish every household’s legal rights or individual eligibility. Keep serial numbers, account identifiers, signed agreements, network details, property records and support attachments private. This guide does not enroll you, send a notice, accept terms, buy equipment or change permissions.

Use existing records and safely available information. A qualified provider should handle installation, electrical work and configuration changes. Do not open equipment, climb onto a roof, bypass battery protections or disconnect program communications to test an assumption. If backup supports essential medical needs, prepare a separate home medical-device power plan with the responsible providers.

Continue with general VPP participation questions, battery backup planning and solar-home transfer records. Solar Survey AI’s evidence methodology separates observed conditions, program acceptance and technical findings. For a system concern, confirm available inspection scope, location availability, qualifications, access, fees and commercial conflicts. Third-party does not automatically mean independent. An inspection cannot approve a utility incentive or guarantee backup runtime. Homeowner monitoring connections and planned free remote diagnosis remain coming soon.

About these guides

Published by Solar Survey AI, a commercial survey-services company. Our original decision checklists are recommendations; linked authorities support the referenced facts. We may benefit if you purchase our services. This is not independent certification of our company, a project-specific engineering decision or personal tax/legal advice. Local rules, contracts and site evidence control individual decisions. Reviewed 2026-10-07.

For available survey or inspection services, confirm your project scope and availability with our team. Our planned free homeowner remote diagnosis remains coming soon.

Survey services · Inspection services · Monitoring early access
Book a 15-min call