Residential

OverviewRooftop PV at volumeRoof & dronePlanes measured on the roofAttic & structureRafters recordedElectricalPanel and interconnectionDesign & engineeringModel to stamped set

Commercial & Industrial

OverviewBig roofs, real structureOn-site surveyRoof, structure, switchgearDesign & engineeringPE stampedVisual inspectionModule resolutionThermal inspectionFaults as heatElectroluminescenceCell-level cracks

Utility-Scale

OverviewThousands of acresLiDAR topographyTerrain before earthworkLand surveyingBoundary and topographicConstruction monitoringProgress, measuredThermal & ELEvery string

Across every scale

Site surveysRoof and electrical, one visitPermitting & engineeringStamped plan setsInspectionAerial thermal and ELShading analysisSA, TOF and TSRFSurvey locationsState and metro guides

The platform

Platform overviewPortal, 3D models, live dataFeature guidesWho it serves and how it worksShading analysisMove the sun yourselfCost calculatorWhat bad field data costs you

Sign in

Vanguard AccessInvite only · survey data portalScheduling & DispatchCrewLink · all verticals

Solar reference

Solar questions answeredResidential, commercial and utility-scaleSurvey methodologySources, measurements and limitsCompany factsOfficial services and capabilities

Field Notes · build vs. buy

What a survey really costsPart 01 · the full modelUtilization is the whole gamePart 02 · a real TuesdayThe break-even headcountWhen hiring pays offTwo technicians, two roofsVariance, measuredThe hybrid crewIn-house plus outsourced

Field Notes · reference

Site survey checklistBuilt backwards from reworkHow long a survey takesHour by hourDo panels need a permit?What goes in the packageStorage site surveysThe capture listCompare survey vendorsQuestions to ask any vendor

Company

All servicesAll Field NotesAboutBook a 15-min call

Home / Homeowners

Homeowner education · reviewed 2026-10-07

Delaware Electric Co-op Solar: Export Application Records

Check Delaware Electric Cooperative solar export restrictions, map limits, application choices, metering and grant questions before relying on a proposal.

Make the decision with evidence
  1. 01Ask the right questions
  2. 02Verify the assumptions
  3. 03Keep the records

Education, not a savings or approval guarantee.

Use this guide

Choose the questions relevant to your situation. Expand each answer, save the checklist and request written clarification where evidence is missing.

Questions homeowners ask

Can every DEC home add solar that exports to the grid?

DEC says some parts of its territory cannot accept additional solar generation feeding its lines. Confirm the actual address before relying on an export-based proposal.

Source: Delaware Electric Cooperative: solar interconnections. Reviewed 2026-10-07.

What does the yellow map category mean?

DEC describes yellow areas as allowing non-export solar. Ask for the approved design and control requirements; a salesperson’s label alone does not establish compliant non-export operation.

Source: Delaware Electric Cooperative: solar interconnections. Reviewed 2026-10-07.

Does the map approve my installation?

No. DEC says map boundaries and substation statuses are approximate and further analysis is needed before interconnection approval. Keep its actual project response.

Source: Delaware Electric Cooperative: solar interconnections. Reviewed 2026-10-07.

Which application should the installer use?

DEC lists separate export, non-export and battery-storage applications. Ask which current application fits the proposed equipment, size and operating mode before submission.

Source: Delaware Electric Cooperative: solar interconnections. Reviewed 2026-10-07.

What does the utility meter record?

DEC describes a meter recording surplus energy not used onsite. Ask which meter and billing treatment apply to your approved configuration; do not equate exports with all production.

Source: Delaware Electric Cooperative: solar interconnections. Reviewed 2026-10-07.

Does the separate grant involve renewable-credit ownership?

The Solar Grant Delaware overview says DEC system owners must transfer their SRECs to receive its one-time grant. Obtain the actual agreement and clarify scope, eligibility and obligations before assigning credits. A grant is separate from interconnection approval.

Source: Solar Grant Delaware: DEC program eligibility overview. Reviewed 2026-10-07.

When buying a solar home, is ordinary service transfer sufficient evidence?

DEC describes ordinary service transfer by contacting its member-service team. As an editorial precaution, separately request the solar application, operating records, equipment scope, billing terms and any grant agreement. This guide does not determine transfer rights or continued approval.

Source: Delaware Electric Cooperative: start or transfer service. Reviewed 2026-10-07.

Your decision checklist

  • Confirm DEC is the actual serving electric provider for the address.
  • Review the utility-linked map and retain the dated question sent to DEC.
  • Ask whether export, non-export or battery scope is being proposed.
  • Identify the correct current application and who submits missing records.
  • Keep actual utility approval and metering information in a private folder.
  • Review any grant agreement and renewable-credit assignment separately.
  • For a home purchase, resolve service, solar and contract handover questions.

Save or print this guide from your browser. Keep completed records privately.

Keep map questions and application decisions traceable

Original private DEC solar proposal and application organizer; not a utility form.
RecordEvidence and next question
Service evidenceActual utility and private service address; keep the public example anonymous.
Map questionDate reviewed, category shown, uncertainty at a boundary and written utility response.
Proposed operationExport or non-export intent, equipment scope and the installer’s explanation.
Application recordCurrent form identified, submission reference, corrections and responsible party.
Actual decisionUtility response, conditions, missing documents and metering questions.
Grant documentsProgram agreement, credit-ownership terms and unresolved eligibility questions.
Home handoverOrdinary service arrangements, private solar folder and written answers about existing obligations.

Fictional boundary example: a homeowner’s proposal assumes export revenue while the property appears near two map categories. Save the proposal assumption and ask the utility to identify the actual project conditions. Do not treat a neighboring property’s arrangement as a decision for this one. These are invented circumstances, not a claim about any real address.

Fictional document example: a buyer receives a solar invoice and a separate grant agreement with missing attachments. List the records held, unresolved terms and the parties who can answer. Obtain the complete documents before treating a marketing estimate as proof of income, ownership or continuing eligibility.

Reviewed October 7, 2026 against DEC’s solar interconnection guidance, its ordinary service-transfer guidance and the linked Solar Grant Delaware overview. Use the map linked by DEC with the utility’s stated limitations. This guide explains DEC’s published screening guidance; it does not assess a private address or extend Delmarva Power’s rules to cooperative customers.

The organizer and fictional examples are editorial preparation aids, not additional utility or legal requirements. Request the current rate, complete interconnection instructions and project-specific technical, permit, insurance and fee conditions from the responsible parties. No map category, nearby approval, grant application or salesperson’s estimate guarantees project acceptance, credit ownership, payment or savings. Confirm the current program agreement; this page does not decide incentive eligibility or interpret every applicable law.

Use existing records and safely visible information. Do not alter inverter controls, test an export limit, open electrical equipment or operate disconnects to demonstrate compliance. Qualified providers and the utility must resolve technical questions. Keep service addresses, account and meter identifiers, credentials, private contracts and household usage out of public examples.

Continue with permit and utility milestones, solar bill and measurement basics, renewable-credit ownership and Delaware rebate program records. Solar Survey AI’s evidence methodology separates observed facts, assumptions and actual decisions. For site concerns, confirm available inspection scope, location availability, qualifications, access, fees and commercial conflicts. Third-party does not automatically mean independent. A survey cannot assign a utility map category, authorize export or approve a grant. Homeowner monitoring connections and planned free remote diagnosis remain coming soon.

About these guides

Published by Solar Survey AI, a commercial survey-services company. Our original decision checklists are recommendations; linked authorities support the referenced facts. We may benefit if you purchase our services. This is not independent certification of our company, a project-specific engineering decision or personal tax/legal advice. Local rules, contracts and site evidence control individual decisions. Reviewed 2026-10-07.

For available survey or inspection services, confirm your project scope and availability with our team. Our planned free homeowner remote diagnosis remains coming soon.

Survey services · Inspection services · Monitoring early access
Book a 15-min call